메뉴 건너뛰기




Volumn 18, Issue 3, 2009, Pages 294-301

Automating progress measurement of construction projects

Author keywords

Computer vision; Progress measurement; Work breakdown structure (WBS)

Indexed keywords

BUILDINGS; COMPUTER VISION; CONSTRUCTION INDUSTRY; IMAGE PROCESSING; MANAGEMENT SCIENCE; PROBABILITY DENSITY FUNCTION; VISUAL COMMUNICATION;

EID: 58949088479     PISSN: 09265805     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.autcon.2008.09.004     Document Type: Article
Times cited : (93)

References (28)
  • 3
    • 33845966046 scopus 로고    scopus 로고
    • "Research in automated measurement of project performance indicators"
    • Navon R. "Research in automated measurement of project performance indicators". Automation in Construction 16 2 (2007) 176-188
    • (2007) Automation in Construction , vol.16 , Issue.2 , pp. 176-188
    • Navon, R.1
  • 4
    • 33846833658 scopus 로고    scopus 로고
    • Synchronization-based model for improving on-site data collection performance
    • Tsai M., Yang J., and Lin C. Synchronization-based model for improving on-site data collection performance. Automation in Construction 16 3 (2007) 323-335
    • (2007) Automation in Construction , vol.16 , Issue.3 , pp. 323-335
    • Tsai, M.1    Yang, J.2    Lin, C.3
  • 5
    • 33847222202 scopus 로고    scopus 로고
    • Assessing research issues in Automated Project Performance Control (APPC)
    • Navon R., and Sacks R. Assessing research issues in Automated Project Performance Control (APPC). Automation in Construction 16 4 (2007) 474-484
    • (2007) Automation in Construction , vol.16 , Issue.4 , pp. 474-484
    • Navon, R.1    Sacks, R.2
  • 12
    • 0033876987 scopus 로고    scopus 로고
    • Detecting changes in aerial views of man-made structures
    • Huertas A., and Nevatia R. Detecting changes in aerial views of man-made structures. Image and Vision Computing, 18 8 (2000) 583-596
    • (2000) Image and Vision Computing , vol.18 , Issue.8 , pp. 583-596
    • Huertas, A.1    Nevatia, R.2
  • 16
    • 33749826089 scopus 로고    scopus 로고
    • "Generation of a construction planning from a 3D CAD model"
    • Vries B., and Harink J. "Generation of a construction planning from a 3D CAD model". Automation in Construction 16 1 (2007) 13-18
    • (2007) Automation in Construction , vol.16 , Issue.1 , pp. 13-18
    • Vries, B.1    Harink, J.2
  • 17
    • 14544269170 scopus 로고    scopus 로고
    • 4D dynamic construction management and visualization software: 1. Development
    • Chau K.W., Anson M., and Zhang J.P. 4D dynamic construction management and visualization software: 1. Development. Automation in Construction 14 4 (2005) 512-524
    • (2005) Automation in Construction , vol.14 , Issue.4 , pp. 512-524
    • Chau, K.W.1    Anson, M.2    Zhang, J.P.3
  • 18
    • 0032165225 scopus 로고    scopus 로고
    • Generating, evaluating and visualizing construction schedules with CAD tools
    • McKinney K., and Fischer M. Generating, evaluating and visualizing construction schedules with CAD tools. Automation in Construction 7 6 (1998) 433-447
    • (1998) Automation in Construction , vol.7 , Issue.6 , pp. 433-447
    • McKinney, K.1    Fischer, M.2
  • 19
    • 0031357905 scopus 로고    scopus 로고
    • A project model for an automated building system: design and planning phases
    • Sacks R., and Warszawski A. A project model for an automated building system: design and planning phases. Automation in Construction 7 1 (1997) 21-34
    • (1997) Automation in Construction , vol.7 , Issue.1 , pp. 21-34
    • Sacks, R.1    Warszawski, A.2
  • 23
    • 84868376274 scopus 로고    scopus 로고
    • A guide to the project management body of knowledge
    • PMI. A guide to the project management body of knowledge. PMI Standards Committee (1996)
    • (1996) PMI Standards Committee
    • PMI1
  • 24
    • 13944282234 scopus 로고    scopus 로고
    • Flexible work breakdown structure for integrated cost and schedule control
    • Jung Y., and Woo S. Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management 130 5 (2004) 616-625
    • (2004) Journal of Construction Engineering and Management , vol.130 , Issue.5 , pp. 616-625
    • Jung, Y.1    Woo, S.2
  • 28
    • 33845805688 scopus 로고    scopus 로고
    • Knowledge-based standard progress measurement for integrated cost and schedule performance control
    • Jung Y., and Kang S. Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management 133 1 (2007) 10-21
    • (2007) Journal of Construction Engineering and Management , vol.133 , Issue.1 , pp. 10-21
    • Jung, Y.1    Kang, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.