-
3
-
-
33845966046
-
"Research in automated measurement of project performance indicators"
-
Navon R. "Research in automated measurement of project performance indicators". Automation in Construction 16 2 (2007) 176-188
-
(2007)
Automation in Construction
, vol.16
, Issue.2
, pp. 176-188
-
-
Navon, R.1
-
4
-
-
33846833658
-
Synchronization-based model for improving on-site data collection performance
-
Tsai M., Yang J., and Lin C. Synchronization-based model for improving on-site data collection performance. Automation in Construction 16 3 (2007) 323-335
-
(2007)
Automation in Construction
, vol.16
, Issue.3
, pp. 323-335
-
-
Tsai, M.1
Yang, J.2
Lin, C.3
-
5
-
-
33847222202
-
Assessing research issues in Automated Project Performance Control (APPC)
-
Navon R., and Sacks R. Assessing research issues in Automated Project Performance Control (APPC). Automation in Construction 16 4 (2007) 474-484
-
(2007)
Automation in Construction
, vol.16
, Issue.4
, pp. 474-484
-
-
Navon, R.1
Sacks, R.2
-
8
-
-
34548031507
-
-
Wiley
-
Fisher R., Dawson-Howe K., Fitzgibbon A., Robertson C., and Trucco E. Dictionary of Computer Vision and Image Processing (2005), Wiley
-
(2005)
Dictionary of Computer Vision and Image Processing
-
-
Fisher, R.1
Dawson-Howe, K.2
Fitzgibbon, A.3
Robertson, C.4
Trucco, E.5
-
10
-
-
1642409255
-
Improving architectural 3D reconstruction by plane and edge constraining
-
Cantzler H., Fisher R.B., and Devy M. Improving architectural 3D reconstruction by plane and edge constraining. Proc. of British Machine Vision Association Conference, Cardiff, UK (2002) 43-52
-
(2002)
Proc. of British Machine Vision Association Conference, Cardiff, UK
, pp. 43-52
-
-
Cantzler, H.1
Fisher, R.B.2
Devy, M.3
-
11
-
-
58949091722
-
Automated architecture reconstruction from close-range photogrammetry
-
Werner T., Schaffalitzky F., and Zisserman A. Automated architecture reconstruction from close-range photogrammetry. the Proc. of CIPA International Symposium: Surveying and Documentation of Historic Buildings, Monuments, Sites, Traditional and Modern Methods, Potsdam, Germany (2001)
-
(2001)
the Proc. of CIPA International Symposium: Surveying and Documentation of Historic Buildings, Monuments, Sites, Traditional and Modern Methods, Potsdam, Germany
-
-
Werner, T.1
Schaffalitzky, F.2
Zisserman, A.3
-
12
-
-
0033876987
-
Detecting changes in aerial views of man-made structures
-
Huertas A., and Nevatia R. Detecting changes in aerial views of man-made structures. Image and Vision Computing, 18 8 (2000) 583-596
-
(2000)
Image and Vision Computing
, vol.18
, Issue.8
, pp. 583-596
-
-
Huertas, A.1
Nevatia, R.2
-
13
-
-
27144545355
-
Combining reality capture technologies for construction defect detection: a case study
-
Gordon C., Boukamp F., Huber D., Latimer E., Park K., and Akinci B. Combining reality capture technologies for construction defect detection: a case study. Proc. of 9th EuropIA International Conference (EIA9), Istanbul, Turkey (2003) 99-108
-
(2003)
Proc. of 9th EuropIA International Conference (EIA9), Istanbul, Turkey
, pp. 99-108
-
-
Gordon, C.1
Boukamp, F.2
Huber, D.3
Latimer, E.4
Park, K.5
Akinci, B.6
-
15
-
-
58949095181
-
Incorporating the progress measurement dimension to an integrated building information system: a research framework
-
Zhang X., Bakis N., Wu S., Kagioglou M., Aouad G., Lukins T., and Ibrahim Y. Incorporating the progress measurement dimension to an integrated building information system: a research framework. Proc. of CIB w78 conference (2007)
-
(2007)
Proc. of CIB w78 conference
-
-
Zhang, X.1
Bakis, N.2
Wu, S.3
Kagioglou, M.4
Aouad, G.5
Lukins, T.6
Ibrahim, Y.7
-
16
-
-
33749826089
-
"Generation of a construction planning from a 3D CAD model"
-
Vries B., and Harink J. "Generation of a construction planning from a 3D CAD model". Automation in Construction 16 1 (2007) 13-18
-
(2007)
Automation in Construction
, vol.16
, Issue.1
, pp. 13-18
-
-
Vries, B.1
Harink, J.2
-
17
-
-
14544269170
-
4D dynamic construction management and visualization software: 1. Development
-
Chau K.W., Anson M., and Zhang J.P. 4D dynamic construction management and visualization software: 1. Development. Automation in Construction 14 4 (2005) 512-524
-
(2005)
Automation in Construction
, vol.14
, Issue.4
, pp. 512-524
-
-
Chau, K.W.1
Anson, M.2
Zhang, J.P.3
-
18
-
-
0032165225
-
Generating, evaluating and visualizing construction schedules with CAD tools
-
McKinney K., and Fischer M. Generating, evaluating and visualizing construction schedules with CAD tools. Automation in Construction 7 6 (1998) 433-447
-
(1998)
Automation in Construction
, vol.7
, Issue.6
, pp. 433-447
-
-
McKinney, K.1
Fischer, M.2
-
19
-
-
0031357905
-
A project model for an automated building system: design and planning phases
-
Sacks R., and Warszawski A. A project model for an automated building system: design and planning phases. Automation in Construction 7 1 (1997) 21-34
-
(1997)
Automation in Construction
, vol.7
, Issue.1
, pp. 21-34
-
-
Sacks, R.1
Warszawski, A.2
-
20
-
-
58949090801
-
-
Bakis N., Zhang X., Wu S., Kagioglou M., and Aouad G. An initial assessment to automating cost and schedule control based on the progress of construction captured using computer vision and photogrammetry techniques, SCRI Symposium (2007)
-
(2007)
An initial assessment to automating cost and schedule control based on the progress of construction captured using computer vision and photogrammetry techniques, SCRI Symposium
-
-
Bakis, N.1
Zhang, X.2
Wu, S.3
Kagioglou, M.4
Aouad, G.5
-
23
-
-
84868376274
-
A guide to the project management body of knowledge
-
PMI. A guide to the project management body of knowledge. PMI Standards Committee (1996)
-
(1996)
PMI Standards Committee
-
-
PMI1
-
24
-
-
13944282234
-
Flexible work breakdown structure for integrated cost and schedule control
-
Jung Y., and Woo S. Flexible work breakdown structure for integrated cost and schedule control. Journal of Construction Engineering and Management 130 5 (2004) 616-625
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.5
, pp. 616-625
-
-
Jung, Y.1
Woo, S.2
-
27
-
-
58949090800
-
-
Ibrahim Y., Trucco E., Kaka A., Kagioglou M., and Aouad G. Semi-automatic development of the work breakdown structure for construction projects, SCRI Symposium (2007)
-
(2007)
Semi-automatic development of the work breakdown structure for construction projects, SCRI Symposium
-
-
Ibrahim, Y.1
Trucco, E.2
Kaka, A.3
Kagioglou, M.4
Aouad, G.5
-
28
-
-
33845805688
-
Knowledge-based standard progress measurement for integrated cost and schedule performance control
-
Jung Y., and Kang S. Knowledge-based standard progress measurement for integrated cost and schedule performance control. Journal of Construction Engineering and Management 133 1 (2007) 10-21
-
(2007)
Journal of Construction Engineering and Management
, vol.133
, Issue.1
, pp. 10-21
-
-
Jung, Y.1
Kang, S.2
|