메뉴 건너뛰기




Volumn , Issue , 2008, Pages 2176-2184

An experimental study of an iterative simulation-optimization algorithm for production planning

Author keywords

[No Author keywords available]

Indexed keywords

CYCLE TIME; EXPERIMENTAL CONDITIONS; EXPERIMENTAL STUDIES; FLOW-TIME; ITERATIVE APPROACHES; ITERATIVE SIMULATIONS; LINEAR PROGRAMMING MODELS; PRODUCTION FACILITIES; PRODUCTION PLANNING; PRODUCTION SYSTEMS; RESOURCE UTILIZATIONS; SIMULATION MODELS;

EID: 60749134984     PISSN: 08917736     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/WSC.2008.4736317     Document Type: Conference Paper
Times cited : (12)

References (23)
  • 1
    • 33144460387 scopus 로고    scopus 로고
    • Tractable Nonlinear Production Planning Models for Semiconductor Wafer Fabrication Facilities
    • Asmundsson, J. M., R. L. Rardin and R. Uzsoy. 2006. Tractable Nonlinear Production Planning Models for Semiconductor Wafer Fabrication Facilities. IEEE Transactions on Semiconductor Manufacturing 19: 95-111.
    • (2006) IEEE Transactions on Semiconductor Manufacturing , vol.19 , pp. 95-111
    • Asmundsson, J.M.1    Rardin, R.L.2    Uzsoy, R.3
  • 4
  • 7
    • 0000204502 scopus 로고
    • A General Framework for Modeling Production
    • Hackman, S. T. and R. C. Leachman. 1989. A General Framework for Modeling Production. Management Science 35: 478-495.
    • (1989) Management Science , vol.35 , pp. 478-495
    • Hackman, S.T.1    Leachman, R.C.2
  • 9
    • 85016055097 scopus 로고    scopus 로고
    • A Production Planning Approach based on Iterations of Linear Programming Optimization and Flow Time Prediction
    • Inst. of Industrial Engineers
    • Hung, Y. F. and M. C. Hou. 2001. A Production Planning Approach based on Iterations of Linear Programming Optimization and Flow Time Prediction. Journal of the Chinese Inst. of Industrial Engineers 18(3): 55-67.
    • (2001) Journal of the Chinese , vol.18 , Issue.3 , pp. 55-67
    • Hung, Y.F.1    Hou, M.C.2
  • 10
    • 0030150549 scopus 로고    scopus 로고
    • A Production Planning Methodology for Semiconductor Manufactu-ring Based on Iterative Simulation and Linear Pro-gramming Calculations
    • Hung, Y. F. and R. C. Leachman. 1996. A Production Planning Methodology for Semiconductor Manufactu-ring Based on Iterative Simulation and Linear Pro-gramming Calculations. IEEE Transactions on Semi-conductor Manufacturing 9(2): 257-269.
    • (1996) IEEE Transactions on Semi-conductor Manufacturing , vol.9 , Issue.2 , pp. 257-269
    • Hung, Y.F.1    Leachman, R.C.2
  • 12
    • 0000153439 scopus 로고
    • Capacity Loading and Release Planning with Work-in-Progress (WIP) and Leadtimes
    • Karmarkar, U. S. 1989. Capacity Loading and Release Planning with Work-in-Progress (WIP) and Leadtimes. Journal of Manufacturing and Operations Management 2(105-123).
    • (1989) Journal of Manufacturing and Operations Management , vol.2 , Issue.105-123
    • Karmarkar, U.S.1
  • 13
    • 0031381458 scopus 로고    scopus 로고
    • Focusing Maintenance Improvement Efforts in a Wafer Fabrication Facility Operating Under Theory of Constraints
    • Fourth Quarter
    • Kayton, D., T. Teyner, C. Schwartz and R. Uzsoy. 1997. Focusing Maintenance Improvement Efforts in a Wafer Fabrication Facility Operating Under Theory of Constraints. Production and Inventory Management (Fourth Quarter): 51-57.
    • (1997) Production and Inventory Management , pp. 51-57
    • Kayton, D.1    Teyner, T.2    Schwartz, C.3    Uzsoy, R.4
  • 14
    • 0035929278 scopus 로고    scopus 로고
    • Extended Model for a Hybrid Production Planning Approach
    • Kim, B. and S. Kim. 2001. Extended Model for a Hybrid Production Planning Approach. International Journal of Production Economics 73: 165-173.
    • (2001) International Journal of Production Economics , vol.73 , pp. 165-173
    • Kim, B.1    Kim, S.2
  • 15
    • 12344293116 scopus 로고    scopus 로고
    • Modelling Lead Times Depending on Capacity Utilization
    • Technische Universität Darmstadt
    • Lautenschlager, M. and H. Stadtler. 1998. Modelling Lead Times Depending on Capacity Utilization. Research Report, Technische Universität Darmstadt.
    • (1998) Research Report
    • Lautenschlager, M.1    Stadtler, H.2
  • 16
    • 0002549571 scopus 로고
    • On Capacity Modeling for Production Planning with Alternative Machine Types
    • Leachman, R. C. and T. F. Garmon. 1992. On Capacity Modeling for Production Planning with Alternative Machine Types. HE Transactions 24(4): 62-72.
    • (1992) HE Transactions , vol.24 , Issue.4 , pp. 62-72
    • Leachman, R.C.1    Garmon, T.F.2
  • 17
    • 0037085145 scopus 로고    scopus 로고
    • Aggregate Order Release Planning for Time-Varying Demand
    • Missbauer, H. 2002. Aggregate Order Release Planning for Time-Varying Demand. International Journal of Production Research 40: 688-718.
    • (2002) International Journal of Production Research , vol.40 , pp. 688-718
    • Missbauer, H.1
  • 20
    • 29144447714 scopus 로고    scopus 로고
    • Production Planning with Load Dependent Lead Times. 40R: A Quarterly
    • Pahl, J., S. Voss and D. L. Woodruff. 2005. Production Planning with Load Dependent Lead Times. 40R: A Quarterly Journal of Operations Research 3: 257-302.
    • (2005) Journal of Operations Research , vol.3 , pp. 257-302
    • Pahl, J.1    Voss, S.2    Woodruff, D.L.3
  • 22
    • 84952240555 scopus 로고
    • A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning
    • Uzsoy, R., C. Y. Lee and L. A. Martin-Vega. 1992. A Review of Production Planning and Scheduling Models in the Semiconductor Industry Part I: System Characteristics, Performance Evaluation and Production Planning. HE Transactions on Scheduling and Logistics 24(47-61).
    • (1992) HE Transactions on Scheduling and Logistics , vol.24 , Issue.47-61
    • Uzsoy, R.1    Lee, C.Y.2    Martin-Vega, L.A.3
  • 23
    • 60749108215 scopus 로고    scopus 로고
    • Vollmann, T. E., W. L. Berry, D. C. Whybark and F. R. Jacobs. 2005. Manufacturing Planning and Control for Supply Chain Management. New York, McGraw- Hill. Voss, S. and D. L. Woodruff. 2003. Introduction to Computational Optimization Models for Production Planning in a Supply Chain. Berlin; New York, Springer.
    • Vollmann, T. E., W. L. Berry, D. C. Whybark and F. R. Jacobs. 2005. Manufacturing Planning and Control for Supply Chain Management. New York, McGraw- Hill. Voss, S. and D. L. Woodruff. 2003. Introduction to Computational Optimization Models for Production Planning in a Supply Chain. Berlin; New York, Springer.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.