메뉴 건너뛰기




Volumn 52, Issue 5-8, 2011, Pages 669-681

The effect of shop floor continuous improvement programs on the lot size-cycle time relationship in a multi-product single-machine environment

Author keywords

Continuous improvement; Cycle time; Factory physics; Lot size; Multi product single machine environment; System dynamics

Indexed keywords

CONTINUOUS IMPROVEMENTS; CYCLE TIME; FACTORY PHYSICS; LOT SIZE; MULTI-PRODUCTS; SYSTEM DYNAMICS;

EID: 79751529868     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2770-8     Document Type: Article
Times cited : (29)

References (49)
  • 3
    • 0031170482 scopus 로고    scopus 로고
    • Lot sizing and scheduling-survey and extensions
    • 0923.90067 10.1016/S0377-2217(97)00030-1
    • A Drexl A Kimms 1997 Lot sizing and scheduling-survey and extensions Eur J Oper Res 99 221 235 0923.90067 10.1016/S0377-2217(97)00030-1
    • (1997) Eur J Oper Res , vol.99 , pp. 221-235
    • Drexl, A.1    Kimms, A.2
  • 4
    • 0041511823 scopus 로고    scopus 로고
    • The capacitated lot sizing problem: A review of models and algorithms
    • DOI 10.1016/S0305-0483(03)00059-8, PII S0305048303000598
    • B Karimi, et al. 2003 The capacitated lot sizing problem: a review of models and algorithms Omega-Int J Manag Sci 31 365 378 10.1016/S0305-0483(03) 00059-8 (Pubitemid 37007074)
    • (2003) Omega , vol.31 , Issue.5 , pp. 365-378
    • Karimi, B.1    Fatemi Ghomi, S.M.T.2    Wilson, J.M.3
  • 5
    • 50349090097 scopus 로고
    • A requiem for the EOQ: An editorial
    • Third Quarter
    • G Woolsey 1988 A requiem for the EOQ: an editorial Prod Invent Manage J 29 3 68 72 Third Quarter
    • (1988) Prod Invent Manage J , vol.29 , Issue.3 , pp. 68-72
    • Woolsey, G.1
  • 6
    • 1442332188 scopus 로고    scopus 로고
    • Expected time in system analysis of a single-machine multi-item processing center
    • 1056.90046 10.1016/S0377-2217(03)00022-5
    • R Kuik TFJ Tielemans 2004 Expected time in system analysis of a single-machine multi-item processing center Eur J Oper Res 156 287 304 1056.90046 10.1016/S0377-2217(03)00022-5
    • (2004) Eur J Oper Res , vol.156 , pp. 287-304
    • Kuik, R.1    Tielemans, T.F.J.2
  • 8
    • 0001827031 scopus 로고
    • Time-the next source of competitive advantage
    • July-August
    • Stalk G (1988) Time-the next source of competitive advantage. Harvard Business Review, pp 41-51, July-August
    • (1988) Harvard Business Review , pp. 41-51
    • Stalk, G.1
  • 9
    • 1642436941 scopus 로고    scopus 로고
    • From supply chain to demand chain: The role of lead time reduction in improving demand chain performance
    • 10.1016/j.jom.2003.10.001
    • SD Treville, et al. 2004 From supply chain to demand chain: the role of lead time reduction in improving demand chain performance J Oper Manag 21 613 627 10.1016/j.jom.2003.10.001
    • (2004) J Oper Manag , vol.21 , pp. 613-627
    • Treville, S.D.1
  • 12
    • 0022034627 scopus 로고
    • Lot sizing and lead time performance in a manufacturing cell
    • 10.1287/inte.15.2.1
    • US Karmarkar, et al. 1985 Lot sizing and lead time performance in a manufacturing cell Interfaces 15 2 1 9 10.1287/inte.15.2.1
    • (1985) Interfaces , vol.15 , Issue.2 , pp. 1-9
    • Karmarkar, U.S.1
  • 13
    • 0030288024 scopus 로고    scopus 로고
    • A general approximation for the single product lot sizing model with queueing delays
    • DOI 10.1016/0377-2217(95)00000-3
    • MR Lambrecht NJ Vandaele 1996 A general approximation for the single product lot sizing model with queueing delays Eur J Oper Res 95 73 88 0955.90510 10.1016/0377-2217(95)00000-3 (Pubitemid 126391974)
    • (1996) European Journal of Operational Research , vol.95 , Issue.1 , pp. 73-88
    • Lambrecht, M.R.1    Vandaele, N.J.2
  • 14
    • 0026853018 scopus 로고
    • Multi-item batching heuristics for minimization of queues
    • 0760.90054 10.1016/0377-2217(92)90239-6
    • US Karmarkar, et al. 1992 Multi-item batching heuristics for minimization of queues Eur J Oper Res 58 99 111 0760.90054 10.1016/0377-2217(92)90239-6
    • (1992) Eur J Oper Res , vol.58 , pp. 99-111
    • Karmarkar, U.S.1
  • 15
    • 0026820502 scopus 로고
    • The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis
    • 10.1016/0925-5273(92)90067-H
    • S Rao 1992 The relationship of work-in-process inventories, manufacturing lead times and waiting line analysis Int J Prod Econ 26 217 227 10.1016/0925-5273(92)90067-H
    • (1992) Int J Prod Econ , vol.26 , pp. 217-227
    • Rao, S.1
  • 16
    • 20344362707 scopus 로고    scopus 로고
    • The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing
    • DOI 10.1016/j.ijpe.2004.07.007, PII S0925527304003202
    • G Kenyon, et al. 2005 The impact of lot sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing Int J Prod Econ 97 263 278 10.1016/j.ijpe.2004.07.007 (Pubitemid 40788673)
    • (2005) International Journal of Production Economics , vol.97 , Issue.3 , pp. 263-278
    • Kenyon, G.1    Canel, C.2    Neureuther, B.D.3
  • 17
    • 33644518216 scopus 로고    scopus 로고
    • Lot size effects on process lead time, lead time demand, and safety stock
    • 10.1016/j.ijpe.2004.09.012
    • TS Vaughan 2006 Lot size effects on process lead time, lead time demand, and safety stock Int J Prod Econ 100 1 9 10.1016/j.ijpe.2004.09.012
    • (2006) Int J Prod Econ , vol.100 , pp. 1-9
    • Vaughan, T.S.1
  • 18
    • 0023417844 scopus 로고
    • Performance of a manufacturing cell with increased product mix
    • S Kekre 1987 Performance of a manufacturing cell with increased product mix IIE Trans 19 3 329 339 10.1080/07408178708975403 916981 (Pubitemid 18531750)
    • (1987) IIE Transactions (Institute of Industrial Engineers) , vol.19 , Issue.3 , pp. 329-339
    • Kekre Sunder1
  • 19
    • 0026243915 scopus 로고
    • Lot sizing and throughput times in a job shop
    • 10.1016/0925-5273(91)90054-W
    • H Hafner 1991 Lot sizing and throughput times in a job shop Int J Prod Econ 23 111 116 10.1016/0925-5273(91)90054-W
    • (1991) Int J Prod Econ , vol.23 , pp. 111-116
    • Hafner, H.1
  • 20
    • 3242739177 scopus 로고    scopus 로고
    • Multi-product capacity-constrained lot sizing with economic objectives
    • 10.1016/j.ijpe.2003.07.002
    • S Choi ST Enns 2004 Multi-product capacity-constrained lot sizing with economic objectives Int J Prod Econ 91 47 62 10.1016/j.ijpe.2003.07.002
    • (2004) Int J Prod Econ , vol.91 , pp. 47-62
    • Choi, S.1    Enns, S.T.2
  • 22
    • 0033485202 scopus 로고    scopus 로고
    • Development of a continuous improvement self-assessment tool
    • DOI 10.1108/01443579910291050
    • S Caffyn 1999 Development of a continuous improvement self-assessment tool Int J Oper Prod Manage 19 11 1138 1153 10.1108/01443579910291050 (Pubitemid 39032252)
    • (1999) International Journal of Operations and Production Management , vol.19 , Issue.11 , pp. 1138-1153
    • Caffyn, S.1
  • 23
    • 0003710588 scopus 로고
    • North River Press: Great Barrington
    • Goldratt E, Fox RE (1986) The race. North River Press: Great Barrington.
    • (1986) The Race
    • Goldratt, E.1    Fox, R.E.2
  • 25
    • 0030686780 scopus 로고    scopus 로고
    • Continuous improvement and kaizen: Standardization and organizational designs
    • A Berger 1997 Continuous improvement and kaizen: standardization and organizational designs Integr Manuf Syst 8 2 110 117 10.1108/09576069710165792 (Pubitemid 127661090)
    • (1997) Integrated Manufacturing Systems , vol.8 , Issue.2 , pp. 110-117
    • Berger, A.1
  • 26
    • 0033481656 scopus 로고    scopus 로고
    • Cycles of continuous improvement: Realizing competitive advantages through quality
    • DOI 10.1108/01443579910291096
    • TI Savolainen 1999 Cycles of continuous improvement: realizing competitive advantages through quality Int J Oper Prod Manage 19 11 1203 1222 10.1108/01443579910291096 (Pubitemid 39032256)
    • (1999) International Journal of Operations and Production Management , vol.19 , Issue.11 , pp. 1203-1222
    • Savolainen, T.I.1
  • 30
    • 0033314649 scopus 로고    scopus 로고
    • The corrupting influence of variability in semiconductor manufacturing
    • Schoemig AK (1999) The corrupting influence of variability in semiconductor manufacturing. Winter Simulation Conference
    • (1999) Winter Simulation Conference
    • Schoemig, A.K.1
  • 32
    • 77949568525 scopus 로고    scopus 로고
    • Variations of the kanban system: Literature review and classification
    • Lage Jr M, Godinho Filho M (2010) Variations of the kanban system: literature review and classification. Int J Prod Econ 125(1):13-21
    • (2010) Int J Prod Econ , vol.125 , Issue.1 , pp. 13-21
    • Lage Jr., M.1    Godinho Filho, M.2
  • 34
    • 34249688514 scopus 로고    scopus 로고
    • A diagnostic tree for improving production line performance
    • 2655630
    • WJ Hopp SMR Iravani B Shou 2009 A diagnostic tree for improving production line performance J Oper Manag 16 1 77 92 2655630
    • (2009) J Oper Manag , vol.16 , Issue.1 , pp. 77-92
    • Hopp, W.J.1    Iravani, S.M.R.2    Shou, B.3
  • 39
    • 23144455453 scopus 로고    scopus 로고
    • Aggregate analysis of manufacturing systems using system dynamics and ANP
    • DOI 10.1016/j.cie.2005.05.001, PII S0360835205000707
    • D Tesfamariam B Lindberg 2005 Aggregate analysis of manufacturing systems using system dynamics and ANP Comput Ind Eng 19 98 117 10.1016/j.cie.2005.05. 001 (Pubitemid 41084184)
    • (2005) Computers and Industrial Engineering , vol.49 , Issue.1 , pp. 98-117
    • Tesfamariam, D.1    Lindberg, B.2
  • 41
    • 30744478010 scopus 로고    scopus 로고
    • A system dynamics model of the semiconductor industry development in Taiwan
    • DOI 10.1057/palgrave.jors.2601958, PII 2601958
    • JH Chen TS Jan 2005 A system dynamics model of the semiconductor industry development in Taiwan J Oper Res Soc 56 10 1141 1150 1081.90036 10.1057/palgrave.jors.2601958 (Pubitemid 43090709)
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.10 , pp. 1141-1150
    • Chen, J.H.1    Jan, T.S.2
  • 42
    • 33846956500 scopus 로고    scopus 로고
    • System dynamics study of the Japanese automotive industry closed loop supply chain
    • 10.1108/17410380710722854
    • S Kumar T Yamaoka 2007 System dynamics study of the Japanese automotive industry closed loop supply chain J Manuf Technol Manage 18 2 115 138 10.1108/17410380710722854
    • (2007) J Manuf Technol Manage , vol.18 , Issue.2 , pp. 115-138
    • Kumar, S.1    Yamaoka, T.2
  • 43
    • 0032673603 scopus 로고    scopus 로고
    • An opportunity for system dynamics in manufacturing system modeling
    • 10.1080/095372899232830
    • TS Baines DK Harrison 1999 An opportunity for system dynamics in manufacturing system modeling Prod Plan Control 10 542 552 10.1080/ 095372899232830
    • (1999) Prod Plan Control , vol.10 , pp. 542-552
    • Baines, T.S.1    Harrison, D.K.2
  • 44
    • 0032312019 scopus 로고    scopus 로고
    • Generic methodology that aids the application of system dynamics to manufacturing system modeling
    • C Lin, et al. 1998 Generic methodology that aids the application of system dynamics to manufacturing system modeling IEE Conf Publ 457 344 349
    • (1998) IEE Conf Publ , vol.457 , pp. 344-349
    • Lin, C.1
  • 46
    • 30044451223 scopus 로고    scopus 로고
    • An application of factory physics tools in a complex manufacturing environment
    • mai.2004, Proceedings⋯ [S.I];: Institute of Industrial Engineers
    • Watkins B, Kurz ME (2004) An application of factory physics tools in a complex manufacturing environment. In: IIE Annual Conference and Exhibition, mai.2004, Proceedings⋯ [S.I];: Institute of Industrial Engineers
    • (2004) IIE Annual Conference and Exhibition
    • Watkins, B.1    Kurz, M.E.2
  • 47
    • 28744446015 scopus 로고    scopus 로고
    • Applied factory physics study on semiconductor assembly and test manufacturing
    • Proceedings⋯ [S.I]: Institute of Electrical and Electronics Engineers
    • Li et al. Applied factory physics study on semiconductor assembly and test manufacturing. In: IEEE International Symposium on Semiconductor Manufacturing Conference, 2005, Proceedings⋯[S.I]: Institute of Electrical and Electronics Engineers, p 4
    • (2005) IEEE International Symposium on Semiconductor Manufacturing Conference , pp. 4
    • Li1
  • 48
    • 22544455990 scopus 로고    scopus 로고
    • A course in manufacturing systems with simulation
    • 2005 ASEE Annual Conference and Exposition, Conference Proceedings
    • Kline WA (2005) A course in manufacturing systems with simulation. In: ASEE Annual Conference and Exposition, JunE 2005, Proceedings⋯ [S.I]: American Society for Engineering Education, pp 2359-2368 (Pubitemid 41011474)
    • (2005) ASEE Annual Conference and Exposition, Conference Proceedings , pp. 2359-2368
    • Kline, W.A.1
  • 49
    • 62749100645 scopus 로고    scopus 로고
    • Cycle time reduction in assembly and test manufacturing factories: A KPI driven methodology
    • Proceedings⋯ [S.I]: Inst. of Elec. and Elec. Eng. Computer Society 2008
    • Zheng et al (2008) Cycle time reduction in assembly and test manufacturing factories: A KPI driven methodology. In: IEEE International Conference on Industrial Engineering and Engineering Management, 2008, Proceedings⋯ [S.I]: Inst. of Elec. and Elec. Eng. Computer Society, pp 1234-1238
    • (2008) IEEE International Conference on Industrial Engineering and Engineering Management , pp. 1234-1238
    • Zheng1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.