메뉴 건너뛰기




Volumn 97, Issue 3, 2005, Pages 263-278

The impact of lot-sizing on net profits and cycle times in the n-job, m-machine job shop with both discrete and batch processing

Author keywords

Analytic models; Cycle times; Simulation

Indexed keywords

COSTS; CUSTOMER SATISFACTION; INDUSTRIAL ECONOMICS; SCHEDULING; SEMICONDUCTOR DEVICE MANUFACTURE; THROUGHPUT;

EID: 20344362707     PISSN: 09255273     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ijpe.2004.07.007     Document Type: Article
Times cited : (31)

References (26)
  • 5
    • 0023981636 scopus 로고
    • Empirical evaluation of a queuing network model for semiconductor wafer fabrication centerication
    • H. Chen, J.M. Harrison, A. Mandelbaum, A. Van Ackre, and L.M. Wein Empirical evaluation of a queuing network model for semiconductor wafer fabrication centerication Operations Research 36 2 1988 205 215
    • (1988) Operations Research , vol.36 , Issue.2 , pp. 205-215
    • Chen, H.1    Harrison, J.M.2    Mandelbaum, A.3    Van Ackre, A.4    Wein, L.M.5
  • 6
    • 0037954442 scopus 로고    scopus 로고
    • Approximations to production lot sizing with machine breakdowns
    • K. Chung Approximations to production lot sizing with machine breakdowns Computers and Operations Research 30 10 2003 1499 1508
    • (2003) Computers and Operations Research , vol.30 , Issue.10 , pp. 1499-1508
    • Chung, K.1
  • 10
    • 20344401715 scopus 로고    scopus 로고
    • Overall factory effectiveness, the corollary to Moore's law
    • S. Douglas Overall factory effectiveness, the corollary to Moore's law Machine Design 71 22 1999 170
    • (1999) Machine Design , vol.71 , Issue.22 , pp. 170
    • Douglas, S.1
  • 14
    • 0003710588 scopus 로고    scopus 로고
    • North River Press Croton-on-Hudson, NY
    • E.M. Goldratt, and R.E. Fox The Race 1996 North River Press Croton-on-Hudson, NY
    • (1996) The Race
    • Goldratt, E.M.1    Fox, R.E.2
  • 15
    • 0035815824 scopus 로고    scopus 로고
    • Economic lot sizing with learning and continuous time discounting: Is it significant?
    • M.Y. Jaber, and M. Bonney Economic lot sizing with learning and continuous time discounting: Is it significant? International Journal of Production Economics 71 2001 135 143
    • (2001) International Journal of Production Economics , vol.71 , pp. 135-143
    • Jaber, M.Y.1    Bonney, M.2
  • 16
    • 0037464632 scopus 로고    scopus 로고
    • Lot sizing with learning and forgetting in set-ups and in product quality
    • M.Y. Jaber, and M. Bonney Lot sizing with learning and forgetting in set-ups and in product quality International Journal of Production Economics 84 2003 95 111
    • (2003) International Journal of Production Economics , vol.84 , pp. 95-111
    • Jaber, M.Y.1    Bonney, M.2
  • 17
    • 0242332842 scopus 로고    scopus 로고
    • Modeling and analysis of wafer fabrication scheduling via generalized stochastic Petri net and simulated annealing
    • V. Jain, R. Swarnkar, and M.K. Tiwari Modeling and analysis of wafer fabrication scheduling via generalized stochastic Petri net and simulated annealing International Journal of Production Research 41 15 2003 3501 3528
    • (2003) International Journal of Production Research , vol.41 , Issue.15 , pp. 3501-3528
    • Jain, V.1    Swarnkar, R.2    Tiwari, M.K.3
  • 19
    • 0022128589 scopus 로고
    • Lotsizing in multi-item, multi-machine job shops
    • U.S. Karmarkar, S. Kekre, and S. Kekre Lotsizing in multi-item, multi-machine job shops IIE Transactions 17 3 1985 290 299
    • (1985) IIE Transactions , vol.17 , Issue.3 , pp. 290-299
    • Karmarkar, U.S.1    Kekre, S.2    Kekre, S.3
  • 26
    • 0023437336 scopus 로고
    • Setup reduction and increased effective capacity
    • A.M. Spence, and E.L. Porteus Setup reduction and increased effective capacity Management Science 33 10 1987 291 1301
    • (1987) Management Science , vol.33 , Issue.10 , pp. 291-1301
    • Spence, A.M.1    Porteus, E.L.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.