메뉴 건너뛰기




Volumn 38, Issue 9, 2011, Pages 1238-1250

Combined planning and scheduling in a divergent production system with co-production: A case study in the lumber industry

Author keywords

Anytime algorithm; Constraint programming; Integrated planning and scheduling; Lumber industry; Mathematical programming; Wood drying and finishing

Indexed keywords

ANYTIME ALGORITHM; CONSTRAINT PROGRAMMING; INTEGRATED PLANNING; LUMBER INDUSTRY; WOOD DRYING AND FINISHING;

EID: 79251630709     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2010.10.013     Document Type: Article
Times cited : (37)

References (32)
  • 3
    • 0040976766 scopus 로고
    • Analyzing manufacturing problems using V-A-T analysis
    • M.M. Umble Analyzing manufacturing problems using V-A-T analysis Production and Inventory Management Journal 33 2 1992 55 60
    • (1992) Production and Inventory Management Journal , vol.33 , Issue.2 , pp. 55-60
    • Umble, M.M.1
  • 4
    • 33646082003 scopus 로고    scopus 로고
    • Designing logistics networks in divergent process industries: A methodology and its application to the lumber industry
    • D. Vila, A. Martel, and R. Beauregard Designing logistics networks in divergent process industries: a methodology and its application to the lumber industry International Journal of Production Economics 102 2 2006 358 378
    • (2006) International Journal of Production Economics , vol.102 , Issue.2 , pp. 358-378
    • Vila, D.1    Martel, A.2    Beauregard, R.3
  • 7
    • 0344272408 scopus 로고    scopus 로고
    • Generation of alternative process plans in integrated manufacturing system
    • D.N. Sormaz, and B. Khoshnevis Generation of alternative process plans in integrated manufacturing system Journal of Intelligent Manufacturing 14 6 2003 509 526
    • (2003) Journal of Intelligent Manufacturing , vol.14 , Issue.6 , pp. 509-526
    • Sormaz, D.N.1    Khoshnevis, B.2
  • 8
    • 0035247355 scopus 로고    scopus 로고
    • A prototype of a feature-based multiple-alternative process planning system with scheduling verification
    • Y.N. Yang, H.R. Parsaei, and H.R. Leep A prototype of a feature-based multiple-alternative process planning system with scheduling verification Computer & Industrial Engineering 39 1-2 2001 109 124
    • (2001) Computer & Industrial Engineering , vol.39 , Issue.12 , pp. 109-124
    • Yang, Y.N.1    Parsaei, H.R.2    Leep, H.R.3
  • 9
    • 0004079441 scopus 로고
    • Experiments with an ecosystems model for integrated production planning
    • P. Husbands, M. McIlhagga, and R. Ives Experiments with an ecosystems model for integrated production planning T. Back, D.B. Fogel, Z. Michalewicz, Handbook of Evolutionary Computation 1995 Oxford University Press Oxford
    • (1995) Handbook of Evolutionary Computation
    • Husbands, P.1    McIlhagga, M.2    Ives, R.3
  • 10
    • 0029287771 scopus 로고
    • Integrated scheduling/planning environment for petrochemical production processes
    • M. Numao Integrated scheduling/planning environment for petrochemical production processes Expert Systems with Applications 8 2 1995 263 273
    • (1995) Expert Systems with Applications , vol.8 , Issue.2 , pp. 263-273
    • Numao, M.1
  • 11
    • 33746031638 scopus 로고
    • Integration of process planning and scheduling functions
    • B. Khoshnevis, and Chen Qingmei Integration of process planning and scheduling functions Journal of Intelligent Manufacturing 2 3 1991 165 176
    • (1991) Journal of Intelligent Manufacturing , vol.2 , Issue.3 , pp. 165-176
    • Khoshnevis, B.1    Qingmei, C.2
  • 12
    • 79251627866 scopus 로고
    • A progressive approach for the integration of process planning and scheduling
    • S.H. Huang, H.C. Zhang, and M.L. Smith A progressive approach for the integration of process planning and scheduling IIE Transactions 27 1995 4
    • (1995) IIE Transactions , vol.27 , pp. 4
    • Huang, S.H.1    Zhang, H.C.2    Smith, M.L.3
  • 14
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Y.H. Lee, C.S. Jeong, and C. Moon Advanced planning and scheduling with outsourcing in manufacturing supply chain Computers & Industrial Engineering 43 12 2002 351 374
    • (2002) Computers & Industrial Engineering , vol.43 , Issue.12 , pp. 351-374
    • Lee, Y.H.1    Jeong, C.S.2    Moon, C.3
  • 15
    • 0033341387 scopus 로고    scopus 로고
    • Scheduling with alternatives: A link between process planning and scheduling
    • A. Weintraub, D. Cormier, T. Hodgson, R. King, J. Wilson, and A. Zozom Scheduling with alternatives: a link between process planning and scheduling IIE Transactions 31 11 1999 1093 1102
    • (1999) IIE Transactions , vol.31 , Issue.11 , pp. 1093-1102
    • Weintraub, A.1    Cormier, D.2    Hodgson, T.3    King, R.4    Wilson, J.5    Zozom, A.6
  • 16
    • 80052993037 scopus 로고    scopus 로고
    • Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey
    • W. Shen, L. Wang, and Q. Hao Agent-based distributed manufacturing process planning and scheduling: A state-of-the-art survey IEEE Transactions on Systems, Man and Cybernetics, Part C 36 4 2006/07 563 577
    • (2006) IEEE Transactions on Systems, Man and Cybernetics, Part C , vol.36 , Issue.4 , pp. 563-577
    • Shen, W.1    Wang, L.2    Hao, Q.3
  • 17
    • 4344620927 scopus 로고    scopus 로고
    • A linearized polynomial mixed integer programming model for the integration of process planning and scheduling
    • W. Tan, and B. Khoshnevis A linearized polynomial mixed integer programming model for the integration of process planning and scheduling Journal of Intelligent Manufacturing 15 5 2004/10 593 605
    • (2004) Journal of Intelligent Manufacturing , vol.15 , Issue.5 , pp. 593-605
    • Tan, W.1    Khoshnevis, B.2
  • 18
    • 33751504128 scopus 로고    scopus 로고
    • A simulated annealing-based optimization approach for integrated process planning and scheduling
    • W.D. Li, and C.A. McMahon A simulated annealing-based optimization approach for integrated process planning and scheduling International Journal of Computer Integrated Manufacturing 20 1 2007/01 80 95
    • (2007) International Journal of Computer Integrated Manufacturing , vol.20 , Issue.1 , pp. 80-95
    • Li, W.D.1    McMahon, C.A.2
  • 19
    • 0035175069 scopus 로고    scopus 로고
    • Integration of process planning and scheduling using simulation based genetic algorithms
    • H. Lee, and S.-S. Kim Integration of process planning and scheduling using simulation based genetic algorithms International Journal of Advanced Manufacturing Technology 18 8 2001 586 590
    • (2001) International Journal of Advanced Manufacturing Technology , vol.18 , Issue.8 , pp. 586-590
    • Lee, H.1    Kim, S.-S.2
  • 20
    • 0037410965 scopus 로고    scopus 로고
    • A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling
    • Y.K. Kim, K. Park, and J. Ko A symbiotic evolutionary algorithm for the integration of process planning and job shop scheduling Computers & Operations Research 30 8 2003 1151 1171
    • (2003) Computers & Operations Research , vol.30 , Issue.8 , pp. 1151-1171
    • Kim, Y.K.1    Park, K.2    Ko, J.3
  • 21
    • 14044262817 scopus 로고    scopus 로고
    • Evolutionary algorithm for advanced process planning and scheduling in a multi-plant
    • C. Moon, and Y. Seo Evolutionary algorithm for advanced process planning and scheduling in a multi-plant Computers & Industrial Engineering 48 2 2005 311 325
    • (2005) Computers & Industrial Engineering , vol.48 , Issue.2 , pp. 311-325
    • Moon, C.1    Seo, Y.2
  • 22
    • 79251605559 scopus 로고    scopus 로고
    • Visopt ShopFloor: On the edge of planning and scheduling. Principles and Practice of Constraint Programming - CP 2002
    • 9-13 Sept. 2002
    • Bartak R. Visopt ShopFloor: on the edge of planning and scheduling. Principles and Practice of Constraint Programming - CP 2002. In: Proceeding so the eighth international conference, CP 2002, 913 Sept. 2002. 2002, p. 587602.
    • (2002) Proceeding so the Eighth International Conference, CP 2002 , pp. 587-602
    • Bartak, R.1
  • 23
    • 0033885605 scopus 로고    scopus 로고
    • Integration of process planning and schedulinga review
    • W. Tan, and B. Khoshnevis Integration of process planning and schedulinga review Journal of Intelligent Manufacturing 11 1 2000/03 51 63
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.1 , pp. 51-63
    • Tan, W.1    Khoshnevis, B.2
  • 24
    • 0347573185 scopus 로고    scopus 로고
    • Computer-assisted multi-item, multi-machine and multi-site scheduling in a hardwood flooring factory
    • A. Gascon, P. Lefrancois, and L. Cloutier Computer-assisted multi-item, multi-machine and multi-site scheduling in a hardwood flooring factory Computers in Industry 36 3 1998 231 244
    • (1998) Computers in Industry , vol.36 , Issue.3 , pp. 231-244
    • Gascon, A.1    Lefrancois, P.2    Cloutier, L.3
  • 25
    • 0035252818 scopus 로고    scopus 로고
    • Dry-or-buy decision support for dry kiln scheduling in furniture production
    • A.R. Yaghubian, T.J. Hodgson, and J.A. Joines Dry-or-buy decision support for dry kiln scheduling in furniture production IIE Transactions 33 2 2001 131 136
    • (2001) IIE Transactions , vol.33 , Issue.2 , pp. 131-136
    • Yaghubian, A.R.1    Hodgson, T.J.2    Joines, J.A.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.