메뉴 건너뛰기




Volumn 36, Issue 3, 1998, Pages 231-244

Computer-assisted multi-item, multi-machine and multi-site scheduling in a hardwood flooring factory

Author keywords

Hardwood factory; Kiln drying; KilnOpt software

Indexed keywords

COMPUTER AIDED SOFTWARE ENGINEERING; COMPUTER SOFTWARE; DRYING; HEURISTIC PROGRAMMING; KILNS; OBJECT ORIENTED PROGRAMMING; SCHEDULING;

EID: 0347573185     PISSN: 01663615     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0166-3615(98)00074-8     Document Type: Article
Times cited : (10)

References (19)
  • 1
    • 0345963863 scopus 로고
    • Fundamentals of integrated manufacturing
    • J. Mize (Ed.), Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, GA
    • J.H. Mize, Fundamentals of integrated manufacturing, in: J. Mize (Ed.), Guide to Systems Integration, Industrial Engineering and Management Press, Institute of Industrial Engineers, Norcross, GA, 1991, pp. 27-43.
    • (1991) Guide to Systems Integration , pp. 27-43
    • Mize, J.H.1
  • 2
    • 0030380690 scopus 로고    scopus 로고
    • An agent-driven approach to design factory information systems
    • P. Lefrançois, B. Montreuil, L. Cloutier, An agent-driven approach to design factory information systems, Comput. Ind. 32 (1996) 197-217.
    • (1996) Comput. Ind. , vol.32 , pp. 197-217
    • Lefrançois, P.1    Montreuil, B.2    Cloutier, L.3
  • 3
    • 0017931081 scopus 로고
    • The economic lot scheduling problem (ELSP): Review and extensions
    • S.E. Elmaghraby, The economic lot scheduling problem (ELSP): review and extensions, Manage. Sci. 24 (1978) 587-598.
    • (1978) Manage. Sci. , vol.24 , pp. 587-598
    • Elmaghraby, S.E.1
  • 4
    • 0018724120 scopus 로고
    • An improved extended basic period procedure for solving the economic lot scheduling problem
    • R.W. Haessler, An improved extended basic period procedure for solving the economic lot scheduling problem, AIIE Trans. 11 (1979) 336-340.
    • (1979) AIIE Trans. , vol.11 , pp. 336-340
    • Haessler, R.W.1
  • 5
    • 0021581827 scopus 로고
    • A stepwise partial enumeration algorithm for the economic lot scheduling problem
    • K.S. Park, D.K. Yun, A stepwise partial enumeration algorithm for the economic lot scheduling problem, IIE Trans. 16 (1984) 363-370.
    • (1984) IIE Trans. , vol.16 , pp. 363-370
    • Park, K.S.1    Yun, D.K.2
  • 6
    • 0000331249 scopus 로고
    • Scheduling economic lot size production runs
    • S.G. Davis, Scheduling economic lot size production runs, Manage. Sci. 36 (1990) 985-998.
    • (1990) Manage. Sci. , vol.36 , pp. 985-998
    • Davis, S.G.1
  • 7
    • 0002144959 scopus 로고
    • Computing optimal lot sizes in the economic lot scheduling problem
    • P.H. Zipkin, Computing optimal lot sizes in the economic lot scheduling problem, Operations Res. 39 (1991) 56-63.
    • (1991) Operations Res. , vol.39 , pp. 56-63
    • Zipkin, P.H.1
  • 8
    • 0017933645 scopus 로고
    • Scheduling rules for the multiple product single machine system with stochastic demand
    • R.C. Vergin, T.N. Lee, Scheduling rules for the multiple product single machine system with stochastic demand, IN-FOR 16 (1978) 64-73.
    • (1978) INFOR , vol.16 , pp. 64-73
    • Vergin, R.C.1    Lee, T.N.2
  • 9
    • 0019057204 scopus 로고
    • The multi-product production cycling problem
    • S.C. Graves, The multi-product production cycling problem, AIIE Trans. 12 (1980) 233-240.
    • (1980) AIIE Trans. , vol.12 , pp. 233-240
    • Graves, S.C.1
  • 10
    • 0003004852 scopus 로고
    • A hierarchical approach for capacity coordination in multiple products single-machine production systems with stationary stochastic demands
    • J.C. Fransoo, V. Sridharan, J.W.M. Bertrand, A hierarchical approach for capacity coordination in multiple products single-machine production systems with stationary stochastic demands, Eur. J. Operational Res. 86 (1995) 57-72.
    • (1995) Eur. J. Operational Res. , vol.86 , pp. 57-72
    • Fransoo, J.C.1    Sridharan, V.2    Bertrand, J.W.M.3
  • 11
    • 0025564737 scopus 로고
    • Scheduling the production of several items with random demands in a single facility
    • G. Gallego, Scheduling the production of several items with random demands in a single facility, Manage. Sci. 36 (1990) 1579-1592.
    • (1990) Manage. Sci. , vol.36 , pp. 1579-1592
    • Gallego, G.1
  • 12
    • 0024012018 scopus 로고
    • The lookahead heuristic for multi-item single machine production scheduling with dynamic, stochastic demands
    • A. Gascon, The lookahead heuristic for multi-item single machine production scheduling with dynamic, stochastic demands, INFOR 26 (1988) 114-126.
    • (1988) INFOR , vol.26 , pp. 114-126
    • Gascon, A.1
  • 13
    • 0023977009 scopus 로고
    • A heuristic scheduling policy for multi-item, single machine production systems with time-varying, stochastic demands
    • R.C. Leachman, A. Gascon, A heuristic scheduling policy for multi-item, single machine production systems with time-varying, stochastic demands, Manage. Sci. 34 (1988) 377-390.
    • (1988) Manage. Sci. , vol.34 , pp. 377-390
    • Leachman, R.C.1    Gascon, A.2
  • 14
    • 0039893556 scopus 로고
    • An improvement to the dynamic cycle lengths heuristic for scheduling the multi-item, single-machine
    • R.C. Leachman, Z.K. Xiong, A. Gascon, K. Park, An improvement to the dynamic cycle lengths heuristic for scheduling the multi-item, single-machine, Manage. Sci. 37 (1991) 1201-1205.
    • (1991) Manage. Sci. , vol.37 , pp. 1201-1205
    • Leachman, R.C.1    Xiong, Z.K.2    Gascon, A.3    Park, K.4
  • 15
    • 0028393317 scopus 로고
    • Multi-item, single-machine scheduling problem with stochastic demands: A comparison of heuristics
    • A. Gascon, R.C. Leachman, P. Lefrançois, Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics, Int. J. Production Res. 32 (1994) 583-596.
    • (1994) Int. J. Production Res. , vol.32 , pp. 583-596
    • Gascon, A.1    Leachman, R.C.2    Lefrançois, P.3
  • 16
    • 0041002559 scopus 로고
    • A note on improving the performance of the enhanced dynamic cycle lengths heuristic for the multi-item, single-machine scheduling problem
    • A. Gascon, R.C. Leachman, P. Lefrançois, A note on improving the performance of the enhanced dynamic cycle lengths heuristic for the multi-item, single-machine scheduling problem, Int. J. Production Res. 33 (1995) 869-873.
    • (1995) Int. J. Production Res. , vol.33 , pp. 869-873
    • Gascon, A.1    Leachman, R.C.2    Lefrançois, P.3
  • 17
    • 0028546745 scopus 로고
    • A heuristic scheduling policy for multi-item, multi-machine production systems with time-varying, stochastic demands
    • J.F. Gonçalves, R.C. Leachman, A. Gascon, Z.K. Xiong, A heuristic scheduling policy for multi-item, multi-machine production systems with time-varying, stochastic demands, Manage. Sci. 40 (1994) 1455-1468.
    • (1994) Manage. Sci. , vol.40 , pp. 1455-1468
    • Gonçalves, J.F.1    Leachman, R.C.2    Gascon, A.3    Xiong, Z.K.4
  • 19
    • 0002031930 scopus 로고
    • A further analysis of variable demand lot-sizing techniques
    • B.J. Coleman, A further analysis of variable demand lot-sizing techniques, Production Inventory Manage. 33 (1992) 19-24.
    • (1992) Production Inventory Manage , vol.33 , pp. 19-24
    • Coleman, B.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.