메뉴 건너뛰기




Volumn 109, Issue 2, 1998, Pages 321-329

A hybrid three-stage flowshop problem: Efficient heuristics to minimize makespan

Author keywords

Heuristics; Hybrid flowshop; Scheduling

Indexed keywords

COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; INVENTORY CONTROL; PROBLEM SOLVING; RESOURCE ALLOCATION; SCHEDULING;

EID: 0032169302     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(98)00060-5     Document Type: Article
Times cited : (94)

References (11)
  • 2
    • 0014807274 scopus 로고
    • A heuristic algorithm for the n-job M-machine sequencing problem
    • H.G. Campbell, R.A. Dudek, H.L. Smith, A heuristic algorithm for the n-job M-machine sequencing problem, Management Science 16 (1970) B630-B637.
    • (1970) Management Science , vol.16
    • Campbell, H.G.1    Dudek, R.A.2    Smith, H.L.3
  • 3
    • 0010761199 scopus 로고
    • Flowshop scheduling with the branch and bound method
    • G.B. McMahon, P.G. Burton, Flowshop scheduling with the branch and bound method, Operations research 15 (3) (1967) 473-481.
    • (1967) Operations Research , vol.15 , Issue.3 , pp. 473-481
    • McMahon, G.B.1    Burton, P.G.2
  • 5
    • 12244259375 scopus 로고    scopus 로고
    • Sequencing on hybrid two stages flowshop to minimize makespan
    • Proceedings of the International Conference on Operations and Quantitative Management
    • F. Riane, A. Artiba, S.E. Elmaghraby, Sequencing on hybrid two stages flowshop to minimize makespan, Proceedings of the International Conference on Operations and Quantitative Management, Jaipur, vol. II, 1996, pp. 572-579.
    • (1996) Jaipur , vol.2 , pp. 572-579
    • Riane, F.1    Artiba, A.2    Elmaghraby, S.E.3
  • 6
    • 84889210861 scopus 로고    scopus 로고
    • Planification et ordonnancement d'une succession d'ateliers avec contraintes
    • Thèse de Doctorat, Université Claude Bernard LYON I
    • G.V. Botta, Planification et ordonnancement d'une succession d'ateliers avec contraintes, Vers un atelier de génie décisionnel pour le pilotage des systèmes de production, Thèse de Doctorat, Université Claude Bernard LYON I, 1996.
    • (1996) Vers un Atelier de Génie Décisionnel Pour le Pilotage des Systèmes de Production
    • Botta, G.V.1
  • 7
    • 0002983799 scopus 로고    scopus 로고
    • Integrated and sequential approaches to schedule hybrid flowshops in make-to-stock environment
    • A. Guinet, Integrated and sequential approaches to schedule hybrid flowshops in make-to-stock environment, WPPC's proceedings Mons, 1996, pp. 299-302.
    • (1996) WPPC's Proceedings Mons , pp. 299-302
    • Guinet, A.1
  • 10
    • 0003075019 scopus 로고
    • Optimal two stage and three stage production schedules with setup times included
    • S.M. Johnson, Optimal two stage and three stage production schedules with setup times included, Naval Research Logistics 1 (1954) 61-68.
    • (1954) Naval Research Logistics , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 11
    • 0020699921 scopus 로고
    • A heuristic algorithm for the m-machine, n-job sequencing problem
    • M. Nawaz, E.E. Enscore, I. Ham, A heuristic algorithm for the m-machine, n-job sequencing problem, OMEGA 11 (1983) 91-95.
    • (1983) OMEGA , vol.11 , pp. 91-95
    • Nawaz, M.1    Enscore, E.E.2    Ham, I.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.