-
1
-
-
85033931011
-
-
Research Report No 310-97WR214, FUCaM, Mons, Belgium
-
F. Riane, A. Artiba, S.E. Elmaghraby, A two stages hybrid flowship problem to minimise makespan, Research Report No 310-97WR214, FUCaM, Mons, Belgium, 1997.
-
(1997)
A Two Stages Hybrid Flowship Problem to Minimise Makespan
-
-
Riane, F.1
Artiba, A.2
Elmaghraby, S.E.3
-
2
-
-
0014807274
-
A heuristic algorithm for the n-job M-machine sequencing problem
-
H.G. Campbell, R.A. Dudek, H.L. Smith, A heuristic algorithm for the n-job M-machine sequencing problem, Management Science 16 (1970) B630-B637.
-
(1970)
Management Science
, vol.16
-
-
Campbell, H.G.1
Dudek, R.A.2
Smith, H.L.3
-
3
-
-
0010761199
-
Flowshop scheduling with the branch and bound method
-
G.B. McMahon, P.G. Burton, Flowshop scheduling with the branch and bound method, Operations research 15 (3) (1967) 473-481.
-
(1967)
Operations Research
, vol.15
, Issue.3
, pp. 473-481
-
-
McMahon, G.B.1
Burton, P.G.2
-
4
-
-
0030281857
-
A new heuristic for three-machine flow shop scheduling
-
B. Chen, C.A. Glass, C.N. Potts, V.A. Strusevich, A new heuristic for three-machine flow shop scheduling, Operations Research 44 (6) (1996) 891-898.
-
(1996)
Operations Research
, vol.44
, Issue.6
, pp. 891-898
-
-
Chen, B.1
Glass, C.A.2
Potts, C.N.3
Strusevich, V.A.4
-
5
-
-
12244259375
-
Sequencing on hybrid two stages flowshop to minimize makespan
-
Proceedings of the International Conference on Operations and Quantitative Management
-
F. Riane, A. Artiba, S.E. Elmaghraby, Sequencing on hybrid two stages flowshop to minimize makespan, Proceedings of the International Conference on Operations and Quantitative Management, Jaipur, vol. II, 1996, pp. 572-579.
-
(1996)
Jaipur
, vol.2
, pp. 572-579
-
-
Riane, F.1
Artiba, A.2
Elmaghraby, S.E.3
-
6
-
-
84889210861
-
Planification et ordonnancement d'une succession d'ateliers avec contraintes
-
Thèse de Doctorat, Université Claude Bernard LYON I
-
G.V. Botta, Planification et ordonnancement d'une succession d'ateliers avec contraintes, Vers un atelier de génie décisionnel pour le pilotage des systèmes de production, Thèse de Doctorat, Université Claude Bernard LYON I, 1996.
-
(1996)
Vers un Atelier de Génie Décisionnel Pour le Pilotage des Systèmes de Production
-
-
Botta, G.V.1
-
7
-
-
0002983799
-
Integrated and sequential approaches to schedule hybrid flowshops in make-to-stock environment
-
A. Guinet, Integrated and sequential approaches to schedule hybrid flowshops in make-to-stock environment, WPPC's proceedings Mons, 1996, pp. 299-302.
-
(1996)
WPPC's Proceedings Mons
, pp. 299-302
-
-
Guinet, A.1
-
8
-
-
0008763858
-
Scheduling methodology: Optimisation and compu-search approach
-
A. Artiba, S.E. Elamghraby (Eds.), Chapman & hall, London
-
M.C. Portmann, Scheduling methodology: optimisation and compu-search approach, in: A. Artiba, S.E. Elamghraby (Eds.), The planning and scheduling of production systems, methodologies and applications, Chapman & hall, London, 1997.
-
(1997)
The Planning and Scheduling of Production Systems, Methodologies and Applications
-
-
Portmann, M.C.1
-
9
-
-
0346354820
-
A unified framework and a classification scheme to model production system
-
A. Artiba, G.V. Botta, A. Guinet, P. Levecq, H. Hentous, F. Riane, A unified framework and a classification scheme to model production system, ICOQM's proceedings Jaipur II (1996) 467-474.
-
(1996)
ICOQM's Proceedings Jaipur
, vol.2
, pp. 467-474
-
-
Artiba, A.1
Botta, G.V.2
Guinet, A.3
Levecq, P.4
Hentous, H.5
Riane, F.6
-
10
-
-
0003075019
-
Optimal two stage and three stage production schedules with setup times included
-
S.M. Johnson, Optimal two stage and three stage production schedules with setup times included, Naval Research Logistics 1 (1954) 61-68.
-
(1954)
Naval Research Logistics
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
11
-
-
0020699921
-
A heuristic algorithm for the m-machine, n-job sequencing problem
-
M. Nawaz, E.E. Enscore, I. Ham, A heuristic algorithm for the m-machine, n-job sequencing problem, OMEGA 11 (1983) 91-95.
-
(1983)
OMEGA
, vol.11
, pp. 91-95
-
-
Nawaz, M.1
Enscore, E.E.2
Ham, I.3
|