메뉴 건너뛰기




Volumn 34, Issue 5, 1996, Pages 1399-1415

A computational study of heuristics for two-stage flexible flowshops

Author keywords

[No Author keywords available]

Indexed keywords

COMPUTATIONAL COMPLEXITY; HEURISTIC METHODS; INTEGER PROGRAMMING; JOB ANALYSIS; MACHINE SHOPS; MACHINING CENTERS; PERFORMANCE; PRODUCTION ENGINEERING; RESOURCE ALLOCATION; SCHEDULING;

EID: 0030149222     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207549608904972     Document Type: Article
Times cited : (79)

References (14)
  • 4
    • 0026190509 scopus 로고
    • Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
    • Gupta, J. and Tunc, E., 1991, Schedules for a two-stage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research, 29, 1489-1502.
    • (1991) International Journal of Production Research , vol.29 , pp. 1489-1502
    • Gupta, J.1    Tunc, E.2
  • 5
    • 3342951457 scopus 로고
    • Minimizing makespan in a multiprocessor flowshop is strongly NP-hard
    • Eindhoven University of Technology, Netherlands
    • Hoogeveen, J., Lenstra, J. and Veltman, B., 1992, Minimizing makespan in a multiprocessor flowshop is strongly NP-hard. Working paper, Eindhoven University of Technology, Netherlands.
    • (1992) Working Paper
    • Hoogeveen, J.1    Lenstra, J.2    Veltman, B.3
  • 6
    • 0002463140 scopus 로고
    • Postindustrial manufacturing
    • Jaikumar, R., 1986, Postindustrial manufacturing. Harvard Business Review, 64, 69-76.
    • (1986) Harvard Business Review , vol.64 , pp. 69-76
    • Jaikumar, R.1
  • 7
    • 0003075019 scopus 로고
    • Optimal two- and three-stage production schedules with set-up times included
    • Johnson, S., 1954, Optimal two- and three-stage production schedules with set-up times included. Naval Research Logistics Quarterly, 1, 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.1
  • 8
    • 0023379505 scopus 로고
    • Interstage transportation planning in the deterministic, flowshop environment
    • Langston, M., 1987, Interstage transportation planning in the deterministic, flowshop environment. Operations Research, 35, 556-564.
    • (1987) Operations Research , vol.35 , pp. 556-564
    • Langston, M.1
  • 9
    • 84985846638 scopus 로고
    • A comparison of sequencing rules for a two-stage hybrid flow shop
    • Narasimhan, S. and Mangiameli, P., 1987, A comparison of sequencing rules for a two-stage hybrid flow shop. Decision Sciences, 18, 250-265.
    • (1987) Decision Sciences , vol.18 , pp. 250-265
    • Narasimhan, S.1    Mangiameli, P.2
  • 11
    • 0002643827 scopus 로고
    • Scheduling with deadlines and loss functions
    • Naughton, R., 1959, Scheduling with deadlines and loss functions. Management Science, 6, 1-12.
    • (1959) Management Science , vol.6 , pp. 1-12
    • Naughton, R.1
  • 12
    • 0018444331 scopus 로고
    • A production scheduling problem in the glass container industry
    • Paul, R., 1979, A production scheduling problem in the glass container industry. Operations Research, 27, 290-302.
    • (1979) Operations Research , vol.27 , pp. 290-302
    • Paul, R.1
  • 13
    • 0024769054 scopus 로고
    • Scheduling algorithms for flexible flow-shops: Worst and average performance
    • Srikandarajah, C. and Sethi, S., 1989, Scheduling algorithms for flexible flow-shops: worst and average performance. European Journal of Operational Research, 43, 143-160.
    • (1989) European Journal of Operational Research , vol.43 , pp. 143-160
    • Srikandarajah, C.1    Sethi, S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.