-
1
-
-
34249921014
-
Scheduling tasks and vehicles in a flexible manufacturing system
-
Blazewicz, J., Eiselt, H., Finke, G., Laporte, G. and Weglarz, J., 1991, Scheduling tasks and vehicles in a flexible manufacturing system. International Journal of Flexible Manufacturing Systems, 4, 5-16.
-
(1991)
International Journal of Flexible Manufacturing Systems
, vol.4
, pp. 5-16
-
-
Blazewicz, J.1
Eiselt, H.2
Finke, G.3
Laporte, G.4
Weglarz, J.5
-
2
-
-
0041582118
-
-
Division of Research, School of Business Administration, The University of Michigan
-
Blazewicz, J., Dror, M., Pawlak, G. and Stecke, K., 1992, Scheduling parts through a two-stage tandem flexible flow shop. Working paper 699, Division of Research, School of Business Administration, The University of Michigan
-
(1992)
Scheduling Parts through a Two-Stage Tandem Flexible Flow Shop. Working Paper 699
-
-
Blazewicz, J.1
Dror, M.2
Pawlak, G.3
Stecke, K.4
-
3
-
-
0023995996
-
Two-stage, hybrid flowshop scheduling problem
-
Gupta, J. N. D., 1988, Two-stage, hybrid flowshop scheduling problem. Journal of the Operational Research Society, 39, 359-364.
-
(1988)
Journal of the Operational Research Society
, vol.39
, pp. 359-364
-
-
Gupta, J.N.D.1
-
4
-
-
0026190509
-
Schedules for a two-stage hybrid flowshop with parallel machines at the second stage
-
Gupta, J. and Tunc, E., 1991, Schedules for a two-stage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research, 29, 1489-1502.
-
(1991)
International Journal of Production Research
, vol.29
, pp. 1489-1502
-
-
Gupta, J.1
Tunc, E.2
-
5
-
-
3342951457
-
Minimizing makespan in a multiprocessor flowshop is strongly NP-hard
-
Eindhoven University of Technology, Netherlands
-
Hoogeveen, J., Lenstra, J. and Veltman, B., 1992, Minimizing makespan in a multiprocessor flowshop is strongly NP-hard. Working paper, Eindhoven University of Technology, Netherlands.
-
(1992)
Working Paper
-
-
Hoogeveen, J.1
Lenstra, J.2
Veltman, B.3
-
6
-
-
0002463140
-
Postindustrial manufacturing
-
Jaikumar, R., 1986, Postindustrial manufacturing. Harvard Business Review, 64, 69-76.
-
(1986)
Harvard Business Review
, vol.64
, pp. 69-76
-
-
Jaikumar, R.1
-
7
-
-
0003075019
-
Optimal two- and three-stage production schedules with set-up times included
-
Johnson, S., 1954, Optimal two- and three-stage production schedules with set-up times included. Naval Research Logistics Quarterly, 1, 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.1
-
8
-
-
0023379505
-
Interstage transportation planning in the deterministic, flowshop environment
-
Langston, M., 1987, Interstage transportation planning in the deterministic, flowshop environment. Operations Research, 35, 556-564.
-
(1987)
Operations Research
, vol.35
, pp. 556-564
-
-
Langston, M.1
-
9
-
-
84985846638
-
A comparison of sequencing rules for a two-stage hybrid flow shop
-
Narasimhan, S. and Mangiameli, P., 1987, A comparison of sequencing rules for a two-stage hybrid flow shop. Decision Sciences, 18, 250-265.
-
(1987)
Decision Sciences
, vol.18
, pp. 250-265
-
-
Narasimhan, S.1
Mangiameli, P.2
-
10
-
-
0021466086
-
Scheduling in a two-stage manufacturing process
-
Narasimhan, S. and Panwalkar, S., 1984, Scheduling in a two-stage manufacturing process. International Journal of Production Research, 22, 555-564.
-
(1984)
International Journal of Production Research
, vol.22
, pp. 555-564
-
-
Narasimhan, S.1
Panwalkar, S.2
-
11
-
-
0002643827
-
Scheduling with deadlines and loss functions
-
Naughton, R., 1959, Scheduling with deadlines and loss functions. Management Science, 6, 1-12.
-
(1959)
Management Science
, vol.6
, pp. 1-12
-
-
Naughton, R.1
-
12
-
-
0018444331
-
A production scheduling problem in the glass container industry
-
Paul, R., 1979, A production scheduling problem in the glass container industry. Operations Research, 27, 290-302.
-
(1979)
Operations Research
, vol.27
, pp. 290-302
-
-
Paul, R.1
-
13
-
-
0024769054
-
Scheduling algorithms for flexible flow-shops: Worst and average performance
-
Srikandarajah, C. and Sethi, S., 1989, Scheduling algorithms for flexible flow-shops: worst and average performance. European Journal of Operational Research, 43, 143-160.
-
(1989)
European Journal of Operational Research
, vol.43
, pp. 143-160
-
-
Srikandarajah, C.1
Sethi, S.2
-
14
-
-
6144290203
-
-
INSEAD Working paper 92/53/TM
-
Van Wassenhove, L., Potts, C., Sevastjanov, S., Strusevich, V. and Zwaneveld, C., 1992, The two-stage assembly scheduling problem: complexity and approximation. INSEAD Working paper 92/53/TM.
-
(1992)
The Two-Stage Assembly Scheduling Problem: Complexity and Approximation.
-
-
Van Wassenhove, L.1
Potts, C.2
Sevastjanov, S.3
Strusevich, V.4
Zwaneveld, C.5
|