-
1
-
-
37949021217
-
-
Baosteel Production Planning Department of China, 1994. Baosteel planning management manual, Internal Research Report.
-
-
-
-
2
-
-
0041841602
-
Scheduling a single server in a two-machine flow shop
-
Cheng T.C.E., and Kovalyov M.Y. Scheduling a single server in a two-machine flow shop. Computing 70 2 (2003) 167-180
-
(2003)
Computing
, vol.70
, Issue.2
, pp. 167-180
-
-
Cheng, T.C.E.1
Kovalyov, M.Y.2
-
4
-
-
0034159731
-
Makespan minimization in the two-machine flowshop batch scheduling problem
-
Cheng T.C.E., Lin B.M.T., and Toker A. Makespan minimization in the two-machine flowshop batch scheduling problem. Naval Research Logistics 47 (2000) 128-144
-
(2000)
Naval Research Logistics
, vol.47
, pp. 128-144
-
-
Cheng, T.C.E.1
Lin, B.M.T.2
Toker, A.3
-
5
-
-
37949023929
-
Expert system for manufacturing sequence determination in hot rolling process of seamless steel pipe
-
Fukaya N., and Katagiri T. Expert system for manufacturing sequence determination in hot rolling process of seamless steel pipe. Kawasaki Ironmaking 23 3 (1991) 191-196
-
(1991)
Kawasaki Ironmaking
, vol.23
, Issue.3
, pp. 191-196
-
-
Fukaya, N.1
Katagiri, T.2
-
6
-
-
0009383985
-
A search algorithm for generalized flowshop scheduling problem
-
Gupta J.N.D. A search algorithm for generalized flowshop scheduling problem. Computers and Operations Research 2 (1975) 83-90
-
(1975)
Computers and Operations Research
, vol.2
, pp. 83-90
-
-
Gupta, J.N.D.1
-
7
-
-
0026880377
-
Discrete event sequencing as a traveling salesman problem
-
Kosiba E.D., and Wright J.R. Discrete event sequencing as a traveling salesman problem. Computers in Industry 19 (1992) 317-327
-
(1992)
Computers in Industry
, vol.19
, pp. 317-327
-
-
Kosiba, E.D.1
Wright, J.R.2
-
10
-
-
1642410098
-
Single machine batch scheduling with jointly compressible setup and processing times
-
Ng C.T., Cheng T.C.E., and Kovalyov M.Y. Single machine batch scheduling with jointly compressible setup and processing times. European Journal of Operational Research 153 (2004) 211-219
-
(2004)
European Journal of Operational Research
, vol.153
, pp. 211-219
-
-
Ng, C.T.1
Cheng, T.C.E.2
Kovalyov, M.Y.3
-
11
-
-
0000142257
-
Cooperative scheduling and its application to steelmaking processes
-
Numao M., and Morishita S.I. Cooperative scheduling and its application to steelmaking processes. IEEE Transactions on Industrial Electronics 38 2 (1991) 150-155
-
(1991)
IEEE Transactions on Industrial Electronics
, vol.38
, Issue.2
, pp. 150-155
-
-
Numao, M.1
Morishita, S.I.2
-
15
-
-
0025700701
-
Some efficient heuristic methods for the flow shop sequencing problem
-
Taillard E. Some efficient heuristic methods for the flow shop sequencing problem. European Journal of Operational Research 47 (1990) 65-74
-
(1990)
European Journal of Operational Research
, vol.47
, pp. 65-74
-
-
Taillard, E.1
-
16
-
-
0037050386
-
Steelmaking process scheduling using Lagrangian relaxation
-
Tang L.X., Luh P.B., Liu J.Y., and Fang L. Steelmaking process scheduling using Lagrangian relaxation. International Journal of Production Research 40 1 (2002) 55-70
-
(2002)
International Journal of Production Research
, vol.40
, Issue.1
, pp. 55-70
-
-
Tang, L.X.1
Luh, P.B.2
Liu, J.Y.3
Fang, L.4
-
17
-
-
0033892353
-
A mathematical programming model for scheduling steelmaking-continuous casting production scheduling
-
Tang L.X., Liu J.Y., Rong A.Y., and Yang Z.H. A mathematical programming model for scheduling steelmaking-continuous casting production scheduling. European Journal of Operational Research 120 2 (2002) 423-435
-
(2002)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 423-435
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
-
18
-
-
0033741404
-
A Multiple Traveling Salesman Problem (MTSP) model for the hot rolling scheduling in Baoshan Iron & Steel Complex
-
Tang L.X., Liu J.Y., Rong A.Y., and Yang Z.H. A Multiple Traveling Salesman Problem (MTSP) model for the hot rolling scheduling in Baoshan Iron & Steel Complex. European Journal of Operational Research 124 2 (2000) 267-282
-
(2000)
European Journal of Operational Research
, vol.124
, Issue.2
, pp. 267-282
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
-
19
-
-
0035899628
-
A review of integrated planning & scheduling for the SM-CC-HR Production
-
Tang L.X., Liu J.Y., Rong A.Y., and Yang Z.H. A review of integrated planning & scheduling for the SM-CC-HR Production. European Journal of Operational Research 133 1 (2001) 1-20
-
(2001)
European Journal of Operational Research
, vol.133
, Issue.1
, pp. 1-20
-
-
Tang, L.X.1
Liu, J.Y.2
Rong, A.Y.3
Yang, Z.H.4
-
20
-
-
0024700013
-
A new heuristic method for the flowshop sequencing problem
-
Widmer M., and Hertz A. A new heuristic method for the flowshop sequencing problem. European Journal of Operational Research 41 (1989) 186-193
-
(1989)
European Journal of Operational Research
, vol.41
, pp. 186-193
-
-
Widmer, M.1
Hertz, A.2
|