메뉴 건너뛰기




Volumn 14, Issue 7, 2003, Pages 575-585

GA-driven part e-manufacturing scheduling via an online e-service platform

Author keywords

Bills of materials; Computer aided manufacturing; Manufacturing systems; Production scheduling; Programming and algorithm theory

Indexed keywords

COMPETITION; GENETIC ALGORITHMS; PROGRAMMING THEORY; SCHEDULING; WORLD WIDE WEB;

EID: 0344981423     PISSN: 09576061     EISSN: None     Source Type: Journal    
DOI: 10.1108/09576060310491937     Document Type: Article
Times cited : (16)

References (16)
  • 1
    • 0034326008 scopus 로고    scopus 로고
    • Genetic algorithms using multi-objectives in a multi-agent system
    • Cardon, A., Galinho, T. and Vacher, J.P. (2000), "Genetic algorithms using multi-objectives in a multi-agent system", Robotics and Autonomous Systems, Vol. 33 No. 2/3, pp. 179-90.
    • (2000) Robotics and Autonomous Systems , vol.33 , Issue.2-3 , pp. 179-190
    • Cardon, A.1    Galinho, T.2    Vacher, J.P.3
  • 2
    • 0032592184 scopus 로고    scopus 로고
    • A tutorial survey of job-shop-scheduling problems using genetic algorithms, part II: Hybrid genetic search strategies
    • Chenga, R., Genb, M. and Tsujimura, Y. (1999), "A tutorial survey of job-shop-scheduling problems using genetic algorithms, part II: hybrid genetic search strategies", Computers & Industrial Engineering, Vol. 36, pp. 343-64.
    • (1999) Computers & Industrial Engineering , vol.36 , pp. 343-364
    • Chenga, R.1    Genb, M.2    Tsujimura, Y.3
  • 4
    • 0010844051 scopus 로고    scopus 로고
    • An exchange heuristic imbedded with simulated annealing for due-dates job-shop scheduling
    • He, Z.S., Yang, T. and Tiger, A. (1996), "An exchange heuristic imbedded with simulated annealing for due-dates job-shop scheduling", European Journal of Operational Research, Vol. 91 No. 2, pp. 99-117.
    • (1996) European Journal of Operational Research , vol.91 , Issue.2 , pp. 99-117
    • He, Z.S.1    Yang, T.2    Tiger, A.3
  • 5
    • 0036377322 scopus 로고    scopus 로고
    • ASP-based e-service platform for web-based online manufacturing
    • Jiang, P.Y., Zhou, G.H. and Liu, Y. (2002), "ASP-based e-service platform for Web-based online manufacturing", Integrated Manufacturing Systems, Vol. 13, No. 5, pp. 306-18.
    • (2002) Integrated Manufacturing Systems , vol.13 , Issue.5 , pp. 306-318
    • Jiang, P.Y.1    Zhou, G.H.2    Liu, Y.3
  • 7
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence, S.R. and Sewell, E.C. (1997), "Heuristic, optimal, static, and dynamic schedules when processing times are uncertain", Journal of Operations Management, Vol. 15, pp. 71-82.
    • (1997) Journal of Operations Management , vol.15 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 8
    • 0031210823 scopus 로고    scopus 로고
    • A parallel genetic-neuro scheduler for job-shop-scheduling problems
    • Lee, H.C. and Dagli, C.H. (1997), "A parallel genetic-neuro scheduler for job-shop-scheduling problems", International Journal of Production Economics, Vol. 51, pp. 115-22.
    • (1997) International Journal of Production Economics , vol.51 , pp. 115-122
    • Lee, H.C.1    Dagli, C.H.2
  • 9
    • 0031101538 scopus 로고    scopus 로고
    • Object-oriented job-shop scheduling using genetic algorithms
    • Maturana, F., Gu, P., Naumann, A. and Norrie, D.H. (1997), "Object-oriented job-shop scheduling using genetic algorithms", Computers in Industry, Vol. 32, pp. 281-94.
    • (1997) Computers in Industry , vol.32 , pp. 281-294
    • Maturana, F.1    Gu, P.2    Naumann, A.3    Norrie, D.H.4
  • 10
    • 0031554836 scopus 로고    scopus 로고
    • A generic framework for an online scheduling and control system in batch process management
    • Nobuaki, I. and Masaaki, M. (1997), "A generic framework for an online scheduling and control system in batch process management", Computers & Chemical Engineering, Vol. 21 No. 11, pp. 1291-310.
    • (1997) Computers & Chemical Engineering , vol.21 , Issue.11 , pp. 1291-1310
    • Nobuaki, I.1    Masaaki, M.2
  • 11
    • 0032592176 scopus 로고    scopus 로고
    • An efficient genetic algorithm for job-shop-scheduling problems with fuzzy processing time and fuzzy due date
    • Sakawa, M. and Mori, T. (1999), "An efficient genetic algorithm for job-shop-scheduling problems with fuzzy processing time and fuzzy due date", Computers & Industrial Engineering, Vol. 36, pp. 325-41.
    • (1999) Computers & Industrial Engineering , vol.36 , pp. 325-341
    • Sakawa, M.1    Mori, T.2
  • 13
    • 0000086539 scopus 로고
    • A genetic algorithm applicable to large-scale job problems
    • Yamada, T. and Nakano, R. (1992), "A genetic algorithm applicable to large-scale job problems", Parallel Problem Solving from Nature, Vol. 2, pp. 281-90.
    • (1992) Parallel Problem Solving from Nature , vol.2 , pp. 281-290
    • Yamada, T.1    Nakano, R.2
  • 14
    • 0035452563 scopus 로고    scopus 로고
    • A new adaptive neural network and heuristics hybrid approach for job-shop scheduling
    • Yang, S.X. and Wang, D.W. (2002), "A new adaptive neural network and heuristics hybrid approach for job-shop scheduling", Computers & Operations Research, Vol. 28, pp. 325-41.
    • (2002) Computers & Operations Research , vol.28 , pp. 325-341
    • Yang, S.X.1    Wang, D.W.2
  • 15
    • 0035725417 scopus 로고    scopus 로고
    • The comparison of multi-reproduction groups of genetic algorithms and its application in the optimization schedule
    • Yao, Z.H., Zhao, G.W. and Han, B. (2001), "The comparison of multi-reproduction groups of genetic algorithms and its application in the optimization schedule", Control Theory and Applications, Vol. 18, No. 6, pp. 882-6.
    • (2001) Control Theory and Applications , vol.18 , Issue.6 , pp. 882-886
    • Yao, Z.H.1    Zhao, G.W.2    Han, B.3
  • 16
    • 0036721680 scopus 로고    scopus 로고
    • Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop-scheduling problems
    • Yun, S.Y. (2002), "Genetic algorithm with fuzzy logic controller for preemptive and non-preemptive job-shop-scheduling problems", Computers and Industrial Engineering, Vol. 43, pp. 623-44.
    • (2002) Computers and Industrial Engineering , vol.43 , pp. 623-644
    • Yun, S.Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.