Volumn 131, Issue 12, 2005, Pages 1257-1262

Using Weibull analysis for evaluation of cost and schedule performance

Author keywords

Construction management; Cost analysis; Scheduling

Indexed keywords

CONSTRUCTION MANAGEMENT; COST ANALYSIS;

EID: 29044442114     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:12(1257)     Document Type: Article
Times cited : (37)

References (13)
  • 2
    • 0026913088 scopus 로고
    • Statistical properties of construction duration data
    • AbouRizk, S. M., and Halpin, D. W. (1992). "Statistical properties of construction duration data." J. Constr. Eng. Manage., 118(3), 525-544.
    • (1992) J. Constr. Eng. Manage. , vol.118 , Issue.3 , pp. 525-544
    • Abourizk, S.M.1    Halpin, D.W.2
  • 3
    • 0035279228 scopus 로고    scopus 로고
    • Defining cost/schedule performance indices and their ranges for design projects
    • Chang, A. S. (2001)."Defining cost/schedule performance indices and their ranges for design projects." J. Manage. Eng., 17(2), 122-130.
    • (2001) J. Manage. Eng. , vol.17 , Issue.2 , pp. 122-130
    • Chang, A.S.1
  • 4
    • 29044440952 scopus 로고    scopus 로고
    • Using Excel for data analysis
    • Dorner, W. W. (1997). "Using Excel for data analysis." Quality Dig., 4(10), 42-46.
    • (1997) Quality Dig. , vol.4 , Issue.10 , pp. 42-46
    • Dorner, W.W.1
  • 5
    • 11144256300 scopus 로고    scopus 로고
    • Using microsoft excel for Weibull analysis
    • Dorner, W. W. (1999). "Using Microsoft Excel for Weibull analysis." Quality Dig., 6(1), 15-19.
    • (1999) Quality Dig. , vol.6 , Issue.1 , pp. 15-19
    • Dorner, W.W.1
  • 11
    • 29044447976 scopus 로고    scopus 로고
    • Earned value method and customer earned value
    • Kim, Y., and Ballard, G. (2002). "Earned value method and customer earned value." J. Constr. Res., 3(1), 55-66.
    • (2002) J. Constr. Res. , vol.3 , Issue.1 , pp. 55-66
    • Kim, Y.1    Ballard, G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.