메뉴 건너뛰기




Volumn 38, Issue 3, 2011, Pages 1931-1941

A hybrid scheduling decision support model for minimizing job tardiness in a make-to-order based mould manufacturing environment

Author keywords

Genetic Algorithm; Make to order; Operation management; Production planning; Scheduling

Indexed keywords

COMPLETE SOLUTIONS; COMPLEX SCHEDULING; COST EFFECTIVE; GENERATION TIME; HYBRID SCHEDULING; JOB PERFORMANCE; JOB SHOP ENVIRONMENT; JOB TARDINESS; MAKE TO ORDER; MOULD MANUFACTURING; OPERATION MANAGEMENT; OPTIMISATIONS; PRODUCTION COST; PRODUCTION FLOWS; PRODUCTION JOBS; PRODUCTION PLANNING; PRODUCTION PROCESS; PRODUCTION SCHEDULE; PRODUCTION TIME; SCHEDULING PROBLEM; SIMULATION RESULT;

EID: 78049529306     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2010.07.125     Document Type: Article
Times cited : (20)

References (28)
  • 1
    • 58549111372 scopus 로고    scopus 로고
    • Solving and integrated employee timetabling and job-shop scheduling problem via hybrid branch and bound
    • 10.1016/j.cor.2008.08.013
    • C. Artigues, M. Gendreau, L.M. Rousseau, and A. Vergnaud Solving and integrated employee timetabling and job-shop scheduling problem via hybrid branch and bound Computer & Operations Research 2008 10.1016/j.cor.2008.08. 013
    • (2008) Computer & Operations Research
    • Artigues, C.1    Gendreau, M.2    Rousseau, L.M.3    Vergnaud, A.4
  • 2
    • 53349118245 scopus 로고    scopus 로고
    • An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem
    • F. Ballestine, and N. Trautmann An iterated-local-search heuristic for the resource-constrained weighted earliness-tardiness project scheduling problem International Journal of Production Research 46 22 2008 6231 6249
    • (2008) International Journal of Production Research , vol.46 , Issue.22 , pp. 6231-6249
    • Ballestine, F.1    Trautmann, N.2
  • 3
    • 51749114425 scopus 로고    scopus 로고
    • A hybrid genetic algorithm with dominance properties for single machine scheduling with dependent penalties
    • P.C. Chang, S.H. Chen, and V. Mani A hybrid genetic algorithm with dominance properties for single machine scheduling with dependent penalties Applied Mathematical Modelling 33 2009 579 596
    • (2009) Applied Mathematical Modelling , vol.33 , pp. 579-596
    • Chang, P.C.1    Chen, S.H.2    Mani, V.3
  • 4
    • 50349092766 scopus 로고    scopus 로고
    • Minimizing number of tardy jobs on a single machine subject to periodic maintenance
    • W.J. Chen Minimizing number of tardy jobs on a single machine subject to periodic maintenance Omega 37 2009 591 599
    • (2009) Omega , vol.37 , pp. 591-599
    • Chen, W.J.1
  • 5
    • 0032187945 scopus 로고    scopus 로고
    • HOP: A software tool for production scheduling at bridgestone/firestone off-the-road
    • Z. Degraeve, and L. Schrage HOP: A software tool for production scheduling at bridgestone/firestone off-the-road European Journal of Operational Research 110 1998 188 198
    • (1998) European Journal of Operational Research , vol.110 , pp. 188-198
    • Degraeve, Z.1    Schrage, L.2
  • 7
    • 0032628965 scopus 로고    scopus 로고
    • Pricing and lead time decisions for make-to-order firms with contingent orders
    • F.F. Easton, and D.R. Moodie Pricing and lead time decisions for make-to-order firms with contingent orders European Journal of Operational Research 116 1999 305 318
    • (1999) European Journal of Operational Research , vol.116 , pp. 305-318
    • Easton, F.F.1    Moodie, D.R.2
  • 10
    • 0024961857 scopus 로고
    • Production planning systems and their applicability to make-to-order companies
    • L.C. Hendry, and B.G. Kingsman Production planning systems and their applicability to make-to-order companies European Journal of Operational Research 40 1989 1 15
    • (1989) European Journal of Operational Research , vol.40 , pp. 1-15
    • Hendry, L.C.1    Kingsman, B.G.2
  • 11
    • 56549108207 scopus 로고    scopus 로고
    • Minimizing total completion time in two-machine flow shops with exact delays
    • Y. Huo, H. Li, and H. Zhao Minimizing total completion time in two-machine flow shops with exact delays Computers & Operations Research 36 2009 2018 2030
    • (2009) Computers & Operations Research , vol.36 , pp. 2018-2030
    • Huo, Y.1    Li, H.2    Zhao, H.3
  • 12
    • 0042021869 scopus 로고    scopus 로고
    • Job-shop scheduling with processing alternatives
    • T. Kis Job-shop scheduling with processing alternatives European Journal of Operational Research 151 2003 307 323
    • (2003) European Journal of Operational Research , vol.151 , pp. 307-323
    • Kis, T.1
  • 13
    • 50349092518 scopus 로고    scopus 로고
    • A heuristic to minimise total flow time in permutation flow shop
    • D. Laha, and S.C. Sarin A heuristic to minimise total flow time in permutation flow shop Omega 37 2009 734 739
    • (2009) Omega , vol.37 , pp. 734-739
    • Laha, D.1    Sarin, S.C.2
  • 15
    • 77649234793 scopus 로고    scopus 로고
    • A scatter search approach to sequence-dependent setup times job shop scheduling
    • A. Manikas, and Y.L. Chang A scatter search approach to sequence-dependent setup times job shop scheduling International Journal of Production Research 1 2008 1 20 (iFirst)
    • (2008) International Journal of Production Research , vol.1 , pp. 1-20
    • Manikas, A.1    Chang, Y.L.2
  • 16
    • 44849088760 scopus 로고    scopus 로고
    • A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming
    • C.H. Martin A hybrid genetic algorithm/mathematical programming approach to the multi-family flowshop scheduling problem with lot streaming Omega 37 2009 126 137
    • (2009) Omega , vol.37 , pp. 126-137
    • Martin, C.H.1
  • 17
    • 0032484459 scopus 로고    scopus 로고
    • Determination of optimal production rates on a single facility with dependent mold lifespan
    • D.H. Moon, and D.P. Christy Determination of optimal production rates on a single facility with dependent mold lifespan International Journal Production Economics 54 1998 29 40
    • (1998) International Journal Production Economics , vol.54 , pp. 29-40
    • Moon, D.H.1    Christy, D.P.2
  • 19
    • 30344483654 scopus 로고    scopus 로고
    • Production optimization for continuously operated processes with optimal operation and scheduling of multiple units
    • R.H. Nystrom, I. Harjunkoski, and A. Kroll Production optimization for continuously operated processes with optimal operation and scheduling of multiple units Computers and Chemical Engineering 30 2006 392 406
    • (2006) Computers and Chemical Engineering , vol.30 , pp. 392-406
    • Nystrom, R.H.1    Harjunkoski, I.2    Kroll, A.3
  • 20
    • 1242287612 scopus 로고    scopus 로고
    • Genetic-algorithm-based real-time task scheduling with multiple goals
    • J. Oh, and C. Wu Genetic-algorithm-based real-time task scheduling with multiple goals The Journal of Systems and Software 71 2004 245 258
    • (2004) The Journal of Systems and Software , vol.71 , pp. 245-258
    • Oh, J.1    Wu, C.2
  • 21
    • 4944222768 scopus 로고    scopus 로고
    • Parallel machine scheduling models with fuzzy processing times
    • J. Peng, and B. Liu Parallel machine scheduling models with fuzzy processing times Information Sciences 166 2004 48 66
    • (2004) Information Sciences , vol.166 , pp. 48-66
    • Peng, J.1    Liu, B.2
  • 22
    • 0037063279 scopus 로고    scopus 로고
    • Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products
    • P. Pongcharoen, C. Hicks, P.M. Braiden, and D.J. Stewardson Determining optimum genetic algorithm parameters for scheduling the manufacturing and assembly of complex products International Journal Production Economics 78 2002 322
    • (2002) International Journal Production Economics , vol.78 , pp. 322
    • Pongcharoen, P.1    Hicks, C.2    Braiden, P.M.3    Stewardson, D.J.4
  • 24
    • 34249295218 scopus 로고    scopus 로고
    • An integrated Petri net and GA based approach for scheduling of hybrid plants
    • S.A. Sadrieh, M. Ghaeli, P.A. Bahri, and P.L. Lee An integrated Petri net and GA based approach for scheduling of hybrid plants Computers in Industry 58 2007 519 530
    • (2007) Computers in Industry , vol.58 , pp. 519-530
    • Sadrieh, S.A.1    Ghaeli, M.2    Bahri, P.A.3    Lee, P.L.4
  • 25
    • 33749578069 scopus 로고    scopus 로고
    • MAPP-A web-based decision support system for the mould industry
    • C. Silva, L. Roque, and A. Almeida MAPP-A web-based decision support system for the mould industry Decision Support System 42 2006 999 1014
    • (2006) Decision Support System , vol.42 , pp. 999-1014
    • Silva, C.1    Roque, L.2    Almeida, A.3
  • 27
    • 56549092634 scopus 로고    scopus 로고
    • A population-based variable neighborhood search for the single machine total weighted tardiness problem
    • X. Wang, and L. Tang A population-based variable neighborhood search for the single machine total weighted tardiness problem Computers & Operations Research 36 2009 2105 2110
    • (2009) Computers & Operations Research , vol.36 , pp. 2105-2110
    • Wang, X.1    Tang, L.2
  • 28
    • 0030124979 scopus 로고
    • Single-machine earliness-tardiness scheduling about a common due date with tolerances
    • M.X. Weng, and J.A. Ventura Single-machine earliness-tardiness scheduling about a common due date with tolerances International Journal Production Economics 42 1995 217 227
    • (1995) International Journal Production Economics , vol.42 , pp. 217-227
    • Weng, M.X.1    Ventura, J.A.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.