메뉴 건너뛰기




Volumn 166, Issue 1-4, 2004, Pages 49-66

Parallel machine scheduling models with fuzzy processing times

Author keywords

Fuzzy programming; Genetic algorithm; Scheduling

Indexed keywords

COMPUTER SIMULATION; FUZZY SETS; GENETIC ALGORITHMS; MATHEMATICAL MODELS; PARALLEL PROCESSING SYSTEMS; PARAMETER ESTIMATION; SCHEDULING; UNCERTAIN SYSTEMS;

EID: 4944222768     PISSN: 00200255     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ins.2003.05.012     Document Type: Article
Times cited : (102)

References (31)
  • 1
    • 0033102073 scopus 로고    scopus 로고
    • Tabu search for total tardiness minimization in flow shop scheduling problems
    • Armentano V.A., Ronconi D.P. Tabu search for total tardiness minimization in flow shop scheduling problems. Computers and Operations Research. 26:1999;219-235.
    • (1999) Computers and Operations Research , vol.26 , pp. 219-235
    • Armentano, V.A.1    Ronconi, D.P.2
  • 2
    • 0030170675 scopus 로고    scopus 로고
    • Single machine scheduling using dominance relation to minimize earliness subject to ready and due times
    • Asano M., Ohta H. Single machine scheduling using dominance relation to minimize earliness subject to ready and due times. International Journal of Production Economics. 44:1996;35-43.
    • (1996) International Journal of Production Economics , vol.44 , pp. 35-43
    • Asano, M.1    Ohta, H.2
  • 4
    • 38149147738 scopus 로고
    • Fuzzy genetic algorithm and applications
    • Buckley J.J., Hayashi Y. Fuzzy genetic algorithm and applications. Fuzzy Sets and Systems. 61:1994;129-136.
    • (1994) Fuzzy Sets and Systems , vol.61 , pp. 129-136
    • Buckley, J.J.1    Hayashi, Y.2
  • 5
    • 0001788426 scopus 로고    scopus 로고
    • Evolutionary algorithm solution to fuzzy problems: Fuzzy linear programming
    • Buckley J.J., Feuring T. Evolutionary algorithm solution to fuzzy problems: fuzzy linear programming. Fuzzy Sets and Systems. 109:2000;35-53.
    • (2000) Fuzzy Sets and Systems , vol.109 , pp. 35-53
    • Buckley, J.J.1    Feuring, T.2
  • 9
    • 0030286425 scopus 로고    scopus 로고
    • Fuzzy priority heuristics for project scheduling
    • Hapke M., Slowinski R. Fuzzy priority heuristics for project scheduling. Fuzzy Sets and Systems. 83:1996;291-299.
    • (1996) Fuzzy Sets and Systems , vol.83 , pp. 291-299
    • Hapke, M.1    Slowinski, R.2
  • 11
    • 0028523480 scopus 로고
    • Genetic algorithms and neighborhood search algorithms for fuzzy flow shop scheduling problems
    • Ishibuchi H., Yamamoto N., Murata T., Tanaka H. Genetic algorithms and neighborhood search algorithms for fuzzy flow shop scheduling problems. Fuzzy Sets and Systems. 67:1994;81-100.
    • (1994) Fuzzy Sets and Systems , vol.67 , pp. 81-100
    • Ishibuchi, H.1    Yamamoto, N.2    Murata, T.3    Tanaka, H.4
  • 12
    • 0000996580 scopus 로고
    • Two scheduling problems with fuzzy due-dates
    • Ishii H., Tada M., Masuda T. Two scheduling problems with fuzzy due-dates. Fuzzy Sets and Systems. 46:1992;339-347.
    • (1992) Fuzzy Sets and Systems , vol.46 , pp. 339-347
    • Ishii, H.1    Tada, M.2    Masuda, T.3
  • 14
    • 0033078591 scopus 로고    scopus 로고
    • Some new results on simulated annealing applied to the job shop scheduling problem
    • Kolonko M. Some new results on simulated annealing applied to the job shop scheduling problem. European Journal of Operational Research. 113:1999;123-136.
    • (1999) European Journal of Operational Research , vol.113 , pp. 123-136
    • Kolonko, M.1
  • 15
    • 0039330850 scopus 로고    scopus 로고
    • An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint
    • Konno T., Ishii H. An open shop scheduling problem with fuzzy allowable time and fuzzy resource constraint. Fuzzy Sets and Systems. 109:2000;141-147.
    • (2000) Fuzzy Sets and Systems , vol.109 , pp. 141-147
    • Konno, T.1    Ishii, H.2
  • 17
    • 0035215629 scopus 로고    scopus 로고
    • Real-time task scheduling with fuzzy deadlines and processing times
    • Litoiu M., Tadei R. Real-time task scheduling with fuzzy deadlines and processing times. Fuzzy Sets and Systems. 117:2001;35-45.
    • (2001) Fuzzy Sets and Systems , vol.117 , pp. 35-45
    • Litoiu, M.1    Tadei, R.2
  • 18
    • 0000804474 scopus 로고    scopus 로고
    • Chance constrained programming with fuzzy parameters
    • Liu B., Iwamura K. Chance constrained programming with fuzzy parameters. Fuzzy Sets and Systems. 94:1998;227-237.
    • (1998) Fuzzy Sets and Systems , vol.94 , pp. 227-237
    • Liu, B.1    Iwamura, K.2
  • 19
    • 0000058741 scopus 로고    scopus 로고
    • A note on chance constrained programming with fuzzy coefficients
    • Liu B., Iwamura K. A note on chance constrained programming with fuzzy coefficients. Fuzzy Sets and Systems. 100:1998;229-233.
    • (1998) Fuzzy Sets and Systems , vol.100 , pp. 229-233
    • Liu, B.1    Iwamura, K.2
  • 21
    • 0032625741 scopus 로고    scopus 로고
    • Dependent-chance programming with fuzzy decisions
    • Liu B. Dependent-chance programming with fuzzy decisions. IEEE Transactions on Fuzzy Systems. 7:1999;354-360.
    • (1999) IEEE Transactions on Fuzzy Systems , vol.7 , pp. 354-360
    • Liu, B.1
  • 22
    • 0003113255 scopus 로고    scopus 로고
    • Dependent-chance programming in fuzzy environments
    • Liu B. Dependent-chance programming in fuzzy environments. Fuzzy Sets and Systems. 109:2000;97-106.
    • (2000) Fuzzy Sets and Systems , vol.109 , pp. 97-106
    • Liu, B.1
  • 24
    • 0036529906 scopus 로고    scopus 로고
    • Random fuzzy dependent-chance programming and its hybrid intelligent algorithm
    • Liu B. Random fuzzy dependent-chance programming and its hybrid intelligent algorithm. Information Sciences. 141:2002;259-271.
    • (2002) Information Sciences , vol.141 , pp. 259-271
    • Liu, B.1
  • 25
    • 0036685786 scopus 로고    scopus 로고
    • Expected value of fuzzy variable and fuzzy expected value models
    • Liu B., Liu Y.-K. Expected value of fuzzy variable and fuzzy expected value models. IEEE Transactions on Fuzzy Systems. 10:2002;445-450.
    • (2002) IEEE Transactions on Fuzzy Systems , vol.10 , pp. 445-450
    • Liu, B.1    Liu, Y.-K.2
  • 29
    • 0001497209 scopus 로고
    • Using fuzzy set theory in a scheduling problem: A case study
    • Prade H. Using fuzzy set theory in a scheduling problem: a case study. Fuzzy Sets and Systems. 2:1979;153-165.
    • (1979) Fuzzy Sets and Systems , vol.2 , pp. 153-165
    • Prade, H.1
  • 30
    • 0033881797 scopus 로고    scopus 로고
    • Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms
    • Sakawa M., Kubota R. Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy duedate through genetic algorithms. European Journal of Operational Research. 120:2000;393-407.
    • (2000) European Journal of Operational Research , vol.120 , pp. 393-407
    • Sakawa, M.1    Kubota, R.2
  • 31
    • 49349133217 scopus 로고
    • Fuzzy set as a basis for a theory of possibility
    • Zadeh L.A. Fuzzy set as a basis for a theory of possibility. Fuzzy Sets and Systems. 1:1978;3-28.
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 3-28
    • Zadeh, L.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.