Volumn 184, Issue 3, 2008, Pages 962-980

Integration of equipment planning and project scheduling

Author keywords

Binary switching operation; Crashing activities; Enhanced forward loading; Heuristics; Idle time; Mixed integer programming; Transition cost

Indexed keywords

COST EFFECTIVENESS; HEURISTIC METHODS; INTEGER PROGRAMMING; INTEGRATION; PROBLEM SOLVING; PROJECT MANAGEMENT; STRATEGIC PLANNING;

EID: 34548576885     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2006.09.104     Document Type: Article
Times cited : (22)

References (15)
  • 4
    • 0035501860 scopus 로고    scopus 로고
    • Integrated project scheduling and material planning with variable activity duration and rewards
    • Dodin B., and Elimam A.A. Integrated project scheduling and material planning with variable activity duration and rewards. IIE Transactions 33 11 (2001) 1005-1018
    • (2001) IIE Transactions , vol.33 , Issue.11 , pp. 1005-1018
    • Dodin, B.1    Elimam, A.A.2
  • 7
    • 0029635345 scopus 로고
    • Activity nets: A guided tour through some recent developments
    • Elmaghraby S.E. Activity nets: A guided tour through some recent developments. European Journal of Operational Research 82 (1995) 383-408
    • (1995) European Journal of Operational Research , vol.82 , pp. 383-408
    • Elmaghraby, S.E.1
  • 9
    • 0022786644 scopus 로고
    • An optimal solution method for large-scale multiple traveling salesmen problems
    • Gavish B., and Srikanth K. An optimal solution method for large-scale multiple traveling salesmen problems. Operations Research 34 5 (1986) 698-717
    • (1986) Operations Research , vol.34 , Issue.5 , pp. 698-717
    • Gavish, B.1    Srikanth, K.2
  • 10
  • 11
  • 13
    • 0026880159 scopus 로고
    • The traveling salesman problem: An overview of exact and approximate algorithms
    • Laporte G. The traveling salesman problem: An overview of exact and approximate algorithms. European Journal of Operational Research 59 (1992) 231-247
    • (1992) European Journal of Operational Research , vol.59 , pp. 231-247
    • Laporte, G.1
  • 14
    • 0029393209 scopus 로고
    • A survey on the resource constrained project scheduling problem
    • Ozdamar L., and Ulusoy G. A survey on the resource constrained project scheduling problem. IIE Transactions 27 (1995) 574-586
    • (1995) IIE Transactions , vol.27 , pp. 574-586
    • Ozdamar, L.1    Ulusoy, G.2
  • 15
    • 0017268482 scopus 로고
    • Scheduling a project under multiple resource constraints: A 0-1 programming approach
    • Patterson J.H., and Roth G.W. Scheduling a project under multiple resource constraints: A 0-1 programming approach. AIIE Transactions 8 (1976) 449-455
    • (1976) AIIE Transactions , vol.8 , pp. 449-455
    • Patterson, J.H.1    Roth, G.W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.