-
1
-
-
0028424243
-
Flow shop scheduling with resource flexibility
-
Daniels R.L., and Mazzolla J.B. Flow shop scheduling with resource flexibility. Operations Research 42 3 (1994) 504-522
-
(1994)
Operations Research
, vol.42
, Issue.3
, pp. 504-522
-
-
Daniels, R.L.1
Mazzolla, J.B.2
-
2
-
-
0029369394
-
Optimization and heuristic models to integrate project task and manpower scheduling
-
Bailey J., Alfares H., and Lin W. Optimization and heuristic models to integrate project task and manpower scheduling. Computers and Industrial Engineering 29 (1995) 473-476
-
(1995)
Computers and Industrial Engineering
, vol.29
, pp. 473-476
-
-
Bailey, J.1
Alfares, H.2
Lin, W.3
-
3
-
-
0001691215
-
Scheduling parallel manufacturing cells with resource flexibility
-
Daniels R.L., Hoopes B.J., and Mazzolla J.B. Scheduling parallel manufacturing cells with resource flexibility. Management Science 42 (1996) 1260-1276
-
(1996)
Management Science
, vol.42
, pp. 1260-1276
-
-
Daniels, R.L.1
Hoopes, B.J.2
Mazzolla, J.B.3
-
4
-
-
0031223441
-
Integrated project task and manpower scheduling
-
Alfares H., and Bailey J. Integrated project task and manpower scheduling. IIE Transactions 29 9 (1997) 711-717
-
(1997)
IIE Transactions
, vol.29
, Issue.9
, pp. 711-717
-
-
Alfares, H.1
Bailey, J.2
-
5
-
-
3042840546
-
Simultaneous job scheduling and resource allocation on parallel machines
-
Chen Z. Simultaneous job scheduling and resource allocation on parallel machines. Annals of Operations Research 129 (2004) 135-153
-
(2004)
Annals of Operations Research
, vol.129
, pp. 135-153
-
-
Chen, Z.1
-
6
-
-
0346307242
-
Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study
-
Huq F., Cutright K., and Martin C. Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. Omega 32 (2004) 121-129
-
(2004)
Omega
, vol.32
, pp. 121-129
-
-
Huq, F.1
Cutright, K.2
Martin, C.3
-
7
-
-
2942562347
-
Flow shop scheduling with partial resource flexibility
-
Daniels R.L., Mazzolla J.B., and Shi D. Flow shop scheduling with partial resource flexibility. Management Science 50 5 (2004) 658-669
-
(2004)
Management Science
, vol.50
, Issue.5
, pp. 658-669
-
-
Daniels, R.L.1
Mazzolla, J.B.2
Shi, D.3
-
8
-
-
0020504118
-
Routing and scheduling of vehicles ad crews the state of the art
-
Bodin L., Golden B., Assad A., and Ball M. Routing and scheduling of vehicles ad crews the state of the art. Computers and Operations Research 10 2 (1983) 63-211
-
(1983)
Computers and Operations Research
, vol.10
, Issue.2
, pp. 63-211
-
-
Bodin, L.1
Golden, B.2
Assad, A.3
Ball, M.4
-
9
-
-
0002127739
-
A unified framework for deterministic time constrained vehicle routing and crew scheduling problems
-
Crainic T., and Laporte G. (Eds), Kluwer, Dordrecht
-
Desaulniers G., Desrosiers J., Ioachim I., Solomon M.M., Soumis F., and Villeneuve D. A unified framework for deterministic time constrained vehicle routing and crew scheduling problems. In: Crainic T., and Laporte G. (Eds). Fleet management and logistics (1998), Kluwer, Dordrecht 57-93
-
(1998)
Fleet management and logistics
, pp. 57-93
-
-
Desaulniers, G.1
Desrosiers, J.2
Ioachim, I.3
Solomon, M.M.4
Soumis, F.5
Villeneuve, D.6
-
12
-
-
0036687075
-
Airline crew scheduling with time windows and plane count constraints
-
Klabjan D., Johnson E.L., and Nemhauser G.L. Airline crew scheduling with time windows and plane count constraints. Transportation Science 36 (2002) 337-348
-
(2002)
Transportation Science
, vol.36
, pp. 337-348
-
-
Klabjan, D.1
Johnson, E.L.2
Nemhauser, G.L.3
-
13
-
-
0142125550
-
Models and algorithms for integration of vehicle and crew scheduling
-
Freling R., Huisman D., and Wagelmanss A. Models and algorithms for integration of vehicle and crew scheduling. Journal of Scheduling 6 1 (2003) 63-65
-
(2003)
Journal of Scheduling
, vol.6
, Issue.1
, pp. 63-65
-
-
Freling, R.1
Huisman, D.2
Wagelmanss, A.3
-
14
-
-
9544258275
-
A computational study of benders decomposition for the integrated aircraft routing and crew scheduling problem
-
Mercier A., Cordeau J.-F., and Soumis F. A computational study of benders decomposition for the integrated aircraft routing and crew scheduling problem. Computers and Operations Research 32 (2005) 1451-1476
-
(2005)
Computers and Operations Research
, vol.32
, pp. 1451-1476
-
-
Mercier, A.1
Cordeau, J.-F.2
Soumis, F.3
-
16
-
-
58549099126
-
-
Demassey S, Pesant G, Rousseau L-M. Constraint programming based column generation for employee timetabling. In: 7th international conference on integration of AI and OR techniques in constraint programming for combinatorial optimization problems (CPAIOR'05), Prague, 2005.
-
Demassey S, Pesant G, Rousseau L-M. Constraint programming based column generation for employee timetabling. In: 7th international conference on integration of AI and OR techniques in constraint programming for combinatorial optimization problems (CPAIOR'05), Prague, 2005.
-
-
-
-
18
-
-
79961182183
-
-
Drezetm L-E, Billaut J-C. Predictive and proactive approaches for RCPSP with labour constraints. In: Twelfth IFAC symposium on information control problems in manufacturing (INCOM06), Saint-Etienne, 2006.
-
Drezetm L-E, Billaut J-C. Predictive and proactive approaches for RCPSP with labour constraints. In: Twelfth IFAC symposium on information control problems in manufacturing (INCOM06), Saint-Etienne, 2006.
-
-
-
-
19
-
-
58549115961
-
-
Haït A, Baptiste P, Brauner N, Finke G. Approches intégrées à court terme. In: Baptiste P, Giard V, Haït A, Soumis F, editors. Gestion de production et ressources humaines. In: Presses internationales polytechnique, 2005 [chapter 6].
-
Haït A, Baptiste P, Brauner N, Finke G. Approches intégrées à court terme. In: Baptiste P, Giard V, Haït A, Soumis F, editors. Gestion de production et ressources humaines. In: Presses internationales polytechnique, 2005 [chapter 6].
-
-
-
-
21
-
-
58549089931
-
-
Focacci F, Laborie P, Nuijten W. Solving scheduling problems with setup times and alternative resources. In: AIPS, 2000. p. 92-111.
-
Focacci F, Laborie P, Nuijten W. Solving scheduling problems with setup times and alternative resources. In: AIPS, 2000. p. 92-111.
-
-
-
-
22
-
-
27244439802
-
A hybrid method for planning and scheduling
-
Hooker J.N. A hybrid method for planning and scheduling. Constraints 10 (2005) 385-401
-
(2005)
Constraints
, vol.10
, pp. 385-401
-
-
Hooker, J.N.1
-
23
-
-
84957361605
-
Cost-based domain filtering
-
Springer, Berlin
-
Focacci F., Lodi A., and Milano M. Cost-based domain filtering. Fifth international conference on the principles and practice of constraint programming CP'99. Lecture notes in computer science vol. 1713 (1999), Springer, Berlin 189-203
-
(1999)
Fifth international conference on the principles and practice of constraint programming CP'99. Lecture notes in computer science
, vol.1713
, pp. 189-203
-
-
Focacci, F.1
Lodi, A.2
Milano, M.3
-
25
-
-
0036437102
-
Linear relaxations and reduced-cost based propagation of continuous variable subscripts
-
Thorsteinsson E.S., and Ottoson G. Linear relaxations and reduced-cost based propagation of continuous variable subscripts. Annals of Operations Research 115 (2002) 15-29
-
(2002)
Annals of Operations Research
, vol.115
, pp. 15-29
-
-
Thorsteinsson, E.S.1
Ottoson, G.2
-
26
-
-
0030354253
-
Generalized arc consistency for global cardinality constraint
-
AAAI Press, MIT Press, Cambridge, MA
-
Régin J.-C. Generalized arc consistency for global cardinality constraint. AAAI/IAAI (1996), AAAI Press, MIT Press, Cambridge, MA 209-215
-
(1996)
AAAI/IAAI
, pp. 209-215
-
-
Régin, J.-C.1
-
29
-
-
33750348054
-
Revisiting the sequence constraint
-
Springer, Berlin
-
van Hoeve W.-J., Pesant G., Rousseau L.-M., and Sabharwal A. Revisiting the sequence constraint. Twelfth international conference on principles and practice of constraint programming CP'06. Lecture notes in computer science vol. 4204 (2006), Springer, Berlin 620-634
-
(2006)
Twelfth international conference on principles and practice of constraint programming CP'06. Lecture notes in computer science
, vol.4204
, pp. 620-634
-
-
van Hoeve, W.-J.1
Pesant, G.2
Rousseau, L.-M.3
Sabharwal, A.4
-
30
-
-
58549100518
-
-
Erschler J, Lopez P, Thuriot C. Scheduling under time and resource constraints. In: Proceedings of workshop on manufacturing scheduling, 11th IJCAI, Detroit, USA, 1989.
-
Erschler J, Lopez P, Thuriot C. Scheduling under time and resource constraints. In: Proceedings of workshop on manufacturing scheduling, 11th IJCAI, Detroit, USA, 1989.
-
-
-
|