메뉴 건너뛰기




Volumn 36, Issue 8, 2009, Pages 2330-2340

Solving an integrated employee timetabling and job-shop scheduling problem via hybrid branch-and-bound

Author keywords

Constraint programming; Employee scheduling; Hybrid methods; Integrated decision problem; Job shop scheduling

Indexed keywords

COMPUTER PROGRAMMING; CONSTRAINT THEORY; HYBRID SENSORS; LINEARIZATION; MULTIOBJECTIVE OPTIMIZATION; OPTIMIZATION; PERSONNEL; SCHEDULING;

EID: 58549111372     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2008.08.013     Document Type: Article
Times cited : (57)

References (30)
  • 1
    • 0028424243 scopus 로고
    • Flow shop scheduling with resource flexibility
    • Daniels R.L., and Mazzolla J.B. Flow shop scheduling with resource flexibility. Operations Research 42 3 (1994) 504-522
    • (1994) Operations Research , vol.42 , Issue.3 , pp. 504-522
    • Daniels, R.L.1    Mazzolla, J.B.2
  • 2
    • 0029369394 scopus 로고
    • Optimization and heuristic models to integrate project task and manpower scheduling
    • Bailey J., Alfares H., and Lin W. Optimization and heuristic models to integrate project task and manpower scheduling. Computers and Industrial Engineering 29 (1995) 473-476
    • (1995) Computers and Industrial Engineering , vol.29 , pp. 473-476
    • Bailey, J.1    Alfares, H.2    Lin, W.3
  • 3
    • 0001691215 scopus 로고    scopus 로고
    • Scheduling parallel manufacturing cells with resource flexibility
    • Daniels R.L., Hoopes B.J., and Mazzolla J.B. Scheduling parallel manufacturing cells with resource flexibility. Management Science 42 (1996) 1260-1276
    • (1996) Management Science , vol.42 , pp. 1260-1276
    • Daniels, R.L.1    Hoopes, B.J.2    Mazzolla, J.B.3
  • 4
    • 0031223441 scopus 로고    scopus 로고
    • Integrated project task and manpower scheduling
    • Alfares H., and Bailey J. Integrated project task and manpower scheduling. IIE Transactions 29 9 (1997) 711-717
    • (1997) IIE Transactions , vol.29 , Issue.9 , pp. 711-717
    • Alfares, H.1    Bailey, J.2
  • 5
    • 3042840546 scopus 로고    scopus 로고
    • Simultaneous job scheduling and resource allocation on parallel machines
    • Chen Z. Simultaneous job scheduling and resource allocation on parallel machines. Annals of Operations Research 129 (2004) 135-153
    • (2004) Annals of Operations Research , vol.129 , pp. 135-153
    • Chen, Z.1
  • 6
    • 0346307242 scopus 로고    scopus 로고
    • Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study
    • Huq F., Cutright K., and Martin C. Employee scheduling and makespan minimization in a flow shop with multi-processor work stations: a case study. Omega 32 (2004) 121-129
    • (2004) Omega , vol.32 , pp. 121-129
    • Huq, F.1    Cutright, K.2    Martin, C.3
  • 7
    • 2942562347 scopus 로고    scopus 로고
    • Flow shop scheduling with partial resource flexibility
    • Daniels R.L., Mazzolla J.B., and Shi D. Flow shop scheduling with partial resource flexibility. Management Science 50 5 (2004) 658-669
    • (2004) Management Science , vol.50 , Issue.5 , pp. 658-669
    • Daniels, R.L.1    Mazzolla, J.B.2    Shi, D.3
  • 8
    • 0020504118 scopus 로고
    • Routing and scheduling of vehicles ad crews the state of the art
    • Bodin L., Golden B., Assad A., and Ball M. Routing and scheduling of vehicles ad crews the state of the art. Computers and Operations Research 10 2 (1983) 63-211
    • (1983) Computers and Operations Research , vol.10 , Issue.2 , pp. 63-211
    • Bodin, L.1    Golden, B.2    Assad, A.3    Ball, M.4
  • 9
    • 0002127739 scopus 로고    scopus 로고
    • A unified framework for deterministic time constrained vehicle routing and crew scheduling problems
    • Crainic T., and Laporte G. (Eds), Kluwer, Dordrecht
    • Desaulniers G., Desrosiers J., Ioachim I., Solomon M.M., Soumis F., and Villeneuve D. A unified framework for deterministic time constrained vehicle routing and crew scheduling problems. In: Crainic T., and Laporte G. (Eds). Fleet management and logistics (1998), Kluwer, Dordrecht 57-93
    • (1998) Fleet management and logistics , pp. 57-93
    • Desaulniers, G.1    Desrosiers, J.2    Ioachim, I.3    Solomon, M.M.4    Soumis, F.5    Villeneuve, D.6
  • 11
  • 12
    • 0036687075 scopus 로고    scopus 로고
    • Airline crew scheduling with time windows and plane count constraints
    • Klabjan D., Johnson E.L., and Nemhauser G.L. Airline crew scheduling with time windows and plane count constraints. Transportation Science 36 (2002) 337-348
    • (2002) Transportation Science , vol.36 , pp. 337-348
    • Klabjan, D.1    Johnson, E.L.2    Nemhauser, G.L.3
  • 13
    • 0142125550 scopus 로고    scopus 로고
    • Models and algorithms for integration of vehicle and crew scheduling
    • Freling R., Huisman D., and Wagelmanss A. Models and algorithms for integration of vehicle and crew scheduling. Journal of Scheduling 6 1 (2003) 63-65
    • (2003) Journal of Scheduling , vol.6 , Issue.1 , pp. 63-65
    • Freling, R.1    Huisman, D.2    Wagelmanss, A.3
  • 14
    • 9544258275 scopus 로고    scopus 로고
    • A computational study of benders decomposition for the integrated aircraft routing and crew scheduling problem
    • Mercier A., Cordeau J.-F., and Soumis F. A computational study of benders decomposition for the integrated aircraft routing and crew scheduling problem. Computers and Operations Research 32 (2005) 1451-1476
    • (2005) Computers and Operations Research , vol.32 , pp. 1451-1476
    • Mercier, A.1    Cordeau, J.-F.2    Soumis, F.3
  • 16
    • 58549099126 scopus 로고    scopus 로고
    • Demassey S, Pesant G, Rousseau L-M. Constraint programming based column generation for employee timetabling. In: 7th international conference on integration of AI and OR techniques in constraint programming for combinatorial optimization problems (CPAIOR'05), Prague, 2005.
    • Demassey S, Pesant G, Rousseau L-M. Constraint programming based column generation for employee timetabling. In: 7th international conference on integration of AI and OR techniques in constraint programming for combinatorial optimization problems (CPAIOR'05), Prague, 2005.
  • 18
    • 79961182183 scopus 로고    scopus 로고
    • Drezetm L-E, Billaut J-C. Predictive and proactive approaches for RCPSP with labour constraints. In: Twelfth IFAC symposium on information control problems in manufacturing (INCOM06), Saint-Etienne, 2006.
    • Drezetm L-E, Billaut J-C. Predictive and proactive approaches for RCPSP with labour constraints. In: Twelfth IFAC symposium on information control problems in manufacturing (INCOM06), Saint-Etienne, 2006.
  • 19
    • 58549115961 scopus 로고    scopus 로고
    • Haït A, Baptiste P, Brauner N, Finke G. Approches intégrées à court terme. In: Baptiste P, Giard V, Haït A, Soumis F, editors. Gestion de production et ressources humaines. In: Presses internationales polytechnique, 2005 [chapter 6].
    • Haït A, Baptiste P, Brauner N, Finke G. Approches intégrées à court terme. In: Baptiste P, Giard V, Haït A, Soumis F, editors. Gestion de production et ressources humaines. In: Presses internationales polytechnique, 2005 [chapter 6].
  • 21
    • 58549089931 scopus 로고    scopus 로고
    • Focacci F, Laborie P, Nuijten W. Solving scheduling problems with setup times and alternative resources. In: AIPS, 2000. p. 92-111.
    • Focacci F, Laborie P, Nuijten W. Solving scheduling problems with setup times and alternative resources. In: AIPS, 2000. p. 92-111.
  • 22
    • 27244439802 scopus 로고    scopus 로고
    • A hybrid method for planning and scheduling
    • Hooker J.N. A hybrid method for planning and scheduling. Constraints 10 (2005) 385-401
    • (2005) Constraints , vol.10 , pp. 385-401
    • Hooker, J.N.1
  • 25
    • 0036437102 scopus 로고    scopus 로고
    • Linear relaxations and reduced-cost based propagation of continuous variable subscripts
    • Thorsteinsson E.S., and Ottoson G. Linear relaxations and reduced-cost based propagation of continuous variable subscripts. Annals of Operations Research 115 (2002) 15-29
    • (2002) Annals of Operations Research , vol.115 , pp. 15-29
    • Thorsteinsson, E.S.1    Ottoson, G.2
  • 26
    • 0030354253 scopus 로고    scopus 로고
    • Generalized arc consistency for global cardinality constraint
    • AAAI Press, MIT Press, Cambridge, MA
    • Régin J.-C. Generalized arc consistency for global cardinality constraint. AAAI/IAAI (1996), AAAI Press, MIT Press, Cambridge, MA 209-215
    • (1996) AAAI/IAAI , pp. 209-215
    • Régin, J.-C.1
  • 30
    • 58549100518 scopus 로고    scopus 로고
    • Erschler J, Lopez P, Thuriot C. Scheduling under time and resource constraints. In: Proceedings of workshop on manufacturing scheduling, 11th IJCAI, Detroit, USA, 1989.
    • Erschler J, Lopez P, Thuriot C. Scheduling under time and resource constraints. In: Proceedings of workshop on manufacturing scheduling, 11th IJCAI, Detroit, USA, 1989.


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.