-
3
-
-
84878605703
-
Pipeless batch plant with operating robots for a multiproduct production system
-
H. Asama, H. Kurokawa, J. Ota, and K. Sekiyama, Eds. New York: Springer
-
S. Hoshino, H. Seki, and Y. Naka, "Pipeless batch plant with operating robots for a multiproduct production system", in Distributed Autonomous Robotic Systems, H. Asama, H. Kurokawa, J. Ota, and K. Sekiyama, Eds. New York: Springer, 2008, vol. 8.
-
(2008)
Distributed Autonomous Robotic Systems
, vol.8
-
-
Hoshino, S.1
Seki, H.2
Naka, Y.3
-
4
-
-
0002877121
-
Current state of the art in distributed autonomous mobile robotics
-
G. B. Lynne, E. Parker, and J. Barhen, Eds. Knoxville, TN: Springer
-
L. E. Parker, "Current state of the art in distributed autonomous mobile robotics", in Distributed Autonomous Robotic Systems, G. B. Lynne, E. Parker, and J. Barhen, Eds. Knoxville, TN: Springer, 2000, vol. 4, pp. 3-12.
-
(2000)
Distributed Autonomous Robotic Systems
, vol.4
, pp. 3-12
-
-
Parker, L.E.1
-
5
-
-
0032162859
-
Continuous-time modeling for short-term scheduling of multipurpose pipeless plants
-
J.-W. Bok and S. Park, "Continuous-time modeling for short-term scheduling of multipurpose pipeless plants", Ind. Eng. Chem. Res., vol. 37, no. 9, pp. 3652-3659, 1998.
-
(1998)
Ind. Eng. Chem. Res.
, vol.37
, Issue.9
, pp. 3652-3659
-
-
Bok, J.-W.1
Park, S.2
-
6
-
-
0035482784
-
Continuous time formulation of short-term scheduling for pipeless batch plants
-
K.-H. Lee, S. Chung, H.-K. Lee, and I.-B. Lee, "Continuous time formulation of short-term scheduling for pipeless batch plants", J. Chem. Eng. Jpn., vol. 34, no. 10, pp. 1267-1278, 2001.
-
(2001)
J. Chem. Eng. Jpn.
, vol.34
, Issue.10
, pp. 1267-1278
-
-
Lee, K.-H.1
Chung, S.2
Lee, H.-K.3
Lee, I.-B.4
-
7
-
-
0030174162
-
Simultaneous design, layout and scheduling of pipeless batch plants
-
M. J. Realff, N. Shah, and C. C. Pantelides, "Simultaneous design, layout and scheduling of pipeless batch plants", Comput. Chem. Eng., vol. 20, no. 6, pp. 869-883, 1996.
-
(1996)
Comput. Chem. Eng.
, vol.20
, Issue.6
, pp. 869-883
-
-
Realff, M.J.1
Shah, N.2
Pantelides, C.C.3
-
8
-
-
37849187375
-
Scheduling of batch plants: Constraint-based approach and performance investigation
-
W. Huang and B. Chen, "Scheduling of batch plants: Constraint-based approach and performance investigation", Int. J. Prod. Econ., vol. 105, no. 2, pp. 425-444, 2007.
-
(2007)
Int. J. Prod. Econ.
, vol.105
, Issue.2
, pp. 425-444
-
-
Huang, W.1
Chen, B.2
-
9
-
-
0034660721
-
Scheduling of pipeless batch plants using constraint satisfaction techniques
-
W. Huang and P. W. H. Chung, "Scheduling of pipeless batch plants using constraint satisfaction techniques", Comput. Chem. Eng., vol. 24, no. 2, pp. 377-383, 2000.
-
(2000)
Comput. Chem. Eng.
, vol.24
, Issue.2
, pp. 377-383
-
-
Huang, W.1
Chung, P.W.H.2
-
10
-
-
15744386860
-
Integrating routing and scheduling for pipeless plants in different layouts
-
W. Huang and P. W. H. Chung, "Integrating routing and scheduling for pipeless plants in different layouts", Comput. Chem. Eng., vol. 29, no. 5, pp. 1069-1081, 2005.
-
(2005)
Comput. Chem. Eng.
, vol.29
, Issue.5
, pp. 1069-1081
-
-
Huang, W.1
Chung, P.W.H.2
-
11
-
-
0032634115
-
Development of a robotic system which assists unmanned production based on cooperation between off-line robots and on-line robots: Concept, analysis and related technology
-
H.-Z. Yang, K. Yamafuji, K. Arita, and N. Ohara, "Development of a robotic system which assists unmanned production based on cooperation between off-line robots and on-line robots: Concept, analysis and related technology", Int. J. Adv. Manuf. Technol., vol. 15, no. 6, pp. 432-437, 1999.
-
(1999)
Int. J. Adv. Manuf. Technol.
, vol.15
, Issue.6
, pp. 432-437
-
-
Yang, H.-Z.1
Yamafuji, K.2
Arita, K.3
Ohara, N.4
-
12
-
-
0032551502
-
Operation of pipeless batch plants - I. MILP schedules
-
DOI 10.1016/S0098-1354(98)00005-2, PII S0098135498000052
-
R. Gonzalez and M. J. Realff, "Operation of pipeless batch plants - I. MILP schedules", Comput. Chem. Eng., vol. 22, no. 7, pp. 841-855, 1998. (Pubitemid 28456602)
-
(1998)
Computers and Chemical Engineering
, vol.22
, Issue.7-8
, pp. 841-855
-
-
Gonzalez, R.1
Realff, M.J.2
-
13
-
-
0028734044
-
Throughput analysis of manufacturing cells using timed Petri nets
-
W. M. Zuberek and W. Kubiak, "Throughput analysis of manufacturing cells using timed Petri nets", in Proc. IEEE Int. Conf. Syst., Man, Cybern., 1994, pp. 1328-1333.
-
(1994)
Proc. IEEE Int. Conf. Syst., Man, Cybern.
, pp. 1328-1333
-
-
Zuberek, W.M.1
Kubiak, W.2
-
14
-
-
0032637928
-
Modelling and evaluation of manufacturing systems using dedicated Petri nets
-
A. Zimmermann and G. Hommel, "Modelling and evaluation of manufacturing systems using dedicated Petri nets", Int. J. Adv. Manuf. Technol., vol. 15, no. 2, pp. 132-138, 1999.
-
(1999)
Int. J. Adv. Manuf. Technol.
, vol.15
, Issue.2
, pp. 132-138
-
-
Zimmermann, A.1
Hommel, G.2
-
15
-
-
33847705667
-
Improved design methodology for an existing automated transportation system with automated guided vehicles in a seaport container terminal
-
S. Hoshino, J. Ota, A. Shinozaki, and H. Hashimoto, "Improved design methodology for an existing automated transportation system with automated guided vehicles in a seaport container terminal", Adv. Robot., vol. 21, no. 3-4, pp. 371-394, 2007.
-
(2007)
Adv. Robot.
, vol.21
, Issue.3-4
, pp. 371-394
-
-
Hoshino, S.1
Ota, J.2
Shinozaki, A.3
Hashimoto, H.4
-
16
-
-
34547456129
-
Hybrid design methodology and cost-effectiveness evaluation of AGV transportation systems
-
S. Hoshino, J. Ota, A. Shinozaki, and H. Hashimoto, "Hybrid design methodology and cost-effectiveness evaluation of AGV transportation systems", IEEE Trans. Autom. Sci. Eng., vol. 4, pp. 360-372, 2007.
-
(2007)
IEEE Trans. Autom. Sci. Eng.
, vol.4
, pp. 360-372
-
-
Hoshino, S.1
Ota, J.2
Shinozaki, A.3
Hashimoto, H.4
-
17
-
-
0024065468
-
A simulation study of multiple-load carrying automated guided vehicles in a flexible manufacturing system
-
M. Ozden, "A simulation study of multiple-load carrying automated guided vehicles in a flexible manufacturing system", Int. J. Prod. Res., vol. 26, no. 8, pp. 1353-1366, 1988.
-
(1988)
Int. J. Prod. Res.
, vol.26
, Issue.8
, pp. 1353-1366
-
-
Ozden, M.1
-
18
-
-
1642518638
-
Comparison of bottleneck detection methods for AGV systems
-
C. Roser, M. Nakano, and M. Tanaka, "Comparison of bottleneck detection methods for AGV systems", in Proc. 2003 Winter Simulation Conf., 2003, pp. 1192-1198.
-
(2003)
Proc. 2003 Winter Simulation Conf.
, pp. 1192-1198
-
-
Roser, C.1
Nakano, M.2
Tanaka, M.3
-
19
-
-
35949005957
-
Cluster effectininitially homogeneous traffic flow
-
B. S. Kerner and P. Konhäuser, "Cluster effectininitially homogeneous traffic flow", Phys. Rev. E, vol. 48, no. 4, pp. 2335-2338, 1993.
-
(1993)
Phys. Rev. E
, vol.48
, Issue.4
, pp. 2335-2338
-
-
Kerner, B.S.1
Konhäuser, P.2
-
20
-
-
26344440071
-
Dynamical model of traffic congestion and numerical simulation
-
M. Bando, K. Hasebe, A. Nakayama, A. Shibata, and Y. Sugiyama, "Dynamical model of traffic congestion and numerical simulation", Phys. Rev. E, vol. 51, no. 2, pp. 1035-1042, 1995.
-
(1995)
Phys. Rev. E
, vol.51
, Issue.2
, pp. 1035-1042
-
-
Bando, M.1
Hasebe, K.2
Nakayama, A.3
Shibata, A.4
Sugiyama, Y.5
-
21
-
-
46249106807
-
Traffic jams without bottlenecks - Experimental evidence for the physical mechanism of the formation of a jam
-
Y. Sugiyama, M. Fukui, M. Kikuchi, K. Hasebe, A. Nakayama, K. Nishinari, S. Tadaki, and S. Yukawa, "Traffic jams without bottlenecks - Experimental evidence for the physical mechanism of the formation of a jam", New J. Phys., vol. 10, p. 033001, 2008.
-
(2008)
New J. Phys.
, vol.10
, pp. 033001
-
-
Sugiyama, Y.1
Fukui, M.2
Kikuchi, M.3
Hasebe, K.4
Nakayama, A.5
Nishinari, K.6
Tadaki, S.7
Yukawa, S.8
-
22
-
-
0031200370
-
Integrated facility layout and material handling system design in semiconductor fabrication facilities
-
B. A. Peters and T. Yang, "Integrated facility layout and material handling system design in semiconductor fabrication facilities", IEEE Trans. Semiconduct. Manuf., vol. 10, pp. 360-369, 1997.
-
(1997)
IEEE Trans. Semiconduct. Manuf.
, vol.10
, pp. 360-369
-
-
Peters, B.A.1
Yang, T.2
-
23
-
-
0029755055
-
The segmented bidirectional single-loop topology for material flow systems
-
D. Sinriech, J. M. A. Tanchoco, and Y. T. Herer, "The segmented bidirectional single-loop topology for material flow systems", IIE Trans., vol. 28, no. 1, pp. 40-54, 1996.
-
(1996)
IIE Trans.
, vol.28
, Issue.1
, pp. 40-54
-
-
Sinriech, D.1
Tanchoco, J.M.A.2
Herer, Y.T.3
-
24
-
-
0031198968
-
Complexity of the AGV shortest path and single-loop guide path layout problems
-
M. C. De Guzman, N. Prabhu, and J. M. A. Tanchoco, "Complexity of the AGV shortest path and single-loop guide path layout problems", Int. J. Prod. Res., vol. 35, no. 8, pp. 2083-2092, 1997.
-
(1997)
Int. J. Prod. Res.
, vol.35
, Issue.8
, pp. 2083-2092
-
-
De Guzman, M.C.1
Prabhu, N.2
Tanchoco, J.M.A.3
-
25
-
-
0028426537
-
Routing, scheduling and product mix optimization by minimax algebra models
-
Q. Xia and S. Macchietto, "Routing, scheduling and product mix optimization by minimax algebra models", Chem. Eng. Res. Design, vol. 72, no. 3, pp. 408-414, 1994.
-
(1994)
Chem. Eng. Res. Design
, vol.72
, Issue.3
, pp. 408-414
-
-
Xia, Q.1
Macchietto, S.2
-
26
-
-
22844457499
-
Design of pipeless chemical batch plants with queueing networks
-
D. J. Yoo, I.-B. Lee, and J. H. Jung, "Design of pipeless chemical batch plants with queueing networks", Ind. Eng. Chem. Res., vol. 44, pp. 5630-5644, 2005.
-
(2005)
Ind. Eng. Chem. Res.
, vol.44
, pp. 5630-5644
-
-
Yoo, D.J.1
Lee, I.-B.2
Jung, J.H.3
-
27
-
-
34249921014
-
Scheduling tasks and vehicles in a flexible manufacturing system
-
J. Blazewicz, H. A. Eiselt, G. Finke, G. Laporte, and J. Weglarz, "Scheduling tasks and vehicles in a flexible manufacturing system", Int. J. Flexible Manuf. Syst., vol. 4, no. 1, pp. 5-16, 1991.
-
(1991)
Int. J. Flexible Manuf. Syst.
, vol.4
, Issue.1
, pp. 5-16
-
-
Blazewicz, J.1
Eiselt, H.A.2
Finke, G.3
Laporte, G.4
Weglarz, J.5
-
28
-
-
3242715937
-
Increasing throughput for robotic cells with parallel machines and multiple robots
-
H. N. Geismar, C. Sriskandarajah, and N. Ramanan, "Increasing throughput for robotic cells with parallel machines and multiple robots", IEEE Trans. Autom. Sci. Eng., vol. 1, pp. 84-89, 2004.
-
(2004)
IEEE Trans. Autom. Sci. Eng.
, vol.1
, pp. 84-89
-
-
Geismar, H.N.1
Sriskandarajah, C.2
Ramanan, N.3
-
29
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
M. Dawande, N. Geismar, S. Sethi, and C. Srishkandarajah, "Sequencing and scheduling in robotic cells: Recent developments", J. Scheduling, vol. 8, no. 5, pp. 387-426, 2005.
-
(2005)
J. Scheduling
, vol.8
, Issue.5
, pp. 387-426
-
-
Dawande, M.1
Geismar, N.2
Sethi, S.3
Srishkandarajah, C.4
-
30
-
-
48649083942
-
Development of a multifunctional robot end-effector system for automated manufacture of textile preforms
-
M. T. Kordi, M. Hüsing, and B. Corves, "Development of a multifunctional robot end-effector system for automated manufacture of textile preforms", in Proc. IEEE/ASME Int. Conf. Adv. Intel. Mech., 2007, pp. 1-6.
-
(2007)
Proc. IEEE/ASME Int. Conf. Adv. Intel. Mech.
, pp. 1-6
-
-
Kordi, M.T.1
Hüsing, M.2
Corves, B.3
-
31
-
-
54949086790
-
Robot control cell production system of senju (thousand-handed) kannon model that demonstrated optimality to the multi-product production in varying volumes for eight years
-
T. Fujita, N. Higuchi, Y. Sugano, H. Hayashi, K. Ida, T. Takagi, M. Shinino, W. Tokimoto, H. Yonezawa, and T. Nishiki, "Robot control cell production system of senju (thousand-handed) kannon model that demonstrated optimality to the multi-product production in varying volumes for eight years", in Proc. IEEE Int. Conf. Autom. Sci. Eng., 2008, pp. 478-485.
-
(2008)
Proc. IEEE Int. Conf. Autom. Sci. Eng.
, pp. 478-485
-
-
Fujita, T.1
Higuchi, N.2
Sugano, Y.3
Hayashi, H.4
Ida, K.5
Takagi, T.6
Shinino, M.7
Tokimoto, W.8
Yonezawa, H.9
Nishiki, T.10
-
33
-
-
0027928264
-
On sign-board based inter-robot communication in distributed robotic systems
-
J. Wang, "On sign-board based inter-robot communication in distributed robotic systems", in Proc. IEEE Int. Conf. Robot. Autom., 1994, pp. 1045-1050.
-
(1994)
Proc. IEEE Int. Conf. Robot. Autom.
, pp. 1045-1050
-
-
Wang, J.1
-
34
-
-
0025590732
-
A combination of centralized and distributed methods for multi-agent planning and scheduling
-
C. Le Pape, "A combination of centralized and distributed methods for multi-agent planning and scheduling", in Proc. IEEE Int. Conf. Robot. Autom., 1990, pp. 488-493.
-
(1990)
Proc. IEEE Int. Conf. Robot. Autom.
, pp. 488-493
-
-
Le Pape, C.1
-
36
-
-
0021423836
-
Characterization of automatic guided vehicle dispatching rules
-
P. J. Egbelu and J. M. A. Tanchoco, "Characterization of automatic guided vehicle dispatching rules", Int. J. Prod. Res., vol. 22, no. 3, pp. 359-374, 1984.
-
(1984)
Int. J. Prod. Res.
, vol.22
, Issue.3
, pp. 359-374
-
-
Egbelu, P.J.1
Tanchoco, J.M.A.2
-
37
-
-
0032551501
-
Operation of pipeless batch plants - II. Vessel dispatch rules
-
DOI 10.1016/S0098-1354(98)80008-2, PII S0098135497000064
-
R. Gonzalez and M. J. Realff, "Operation of pipeless batch plants - II. Vessel dispatch rules", Comput. Chem. Eng., vol. 22, no. 7, pp. 857-866, 1998. (Pubitemid 28463477)
-
(1998)
Computers and Chemical Engineering
, vol.22
, Issue.7-8
, pp. 857-866
-
-
Gonzalez, R.1
Realff, M.J.2
-
38
-
-
4444338336
-
A formal analysis and taxonomy of task allocation in multi-robot systems
-
B. P. Gerkey and M. J. Matarić, "A formal analysis and taxonomy of task allocation in multi-robot systems", Int. J. Robot. Res., vol. 23, no. 9, pp. 939-954, 2004.
-
(2004)
Int. J. Robot. Res.
, vol.23
, Issue.9
, pp. 939-954
-
-
Gerkey, B.P.1
Matarić, M.J.2
-
39
-
-
54949083525
-
Distributed multi-robot work load partition in manufacturing automation
-
G. S. Tewolde, C. H. Wu, Y. Wang, and W. H. Sheng, "Distributed multi-robot work load partition in manufacturing automation", in Proc. IEEE Conf. Autom. Sci. Eng., 2008, pp. 504-509.
-
(2008)
Proc. IEEE Conf. Autom. Sci. Eng.
, pp. 504-509
-
-
Tewolde, G.S.1
Wu, C.H.2
Wang, Y.3
Sheng, W.H.4
-
40
-
-
0022688781
-
A robust layered control system for a mobile robot
-
R. Brooks, "A robust layered control system for a mobile robot", IEEE J. Robot. Autom., vol. 2, no. 1, pp. 14-23, 1986. (Pubitemid 16576274)
-
(1986)
IEEE journal of robotics and automation
, vol.RA-2
, Issue.1
, pp. 14-23
-
-
Brooks, R.1
-
41
-
-
0029537980
-
Issues and approaches in design of collective autonomous agents
-
M. J. Matarić, "Issues and approaches in design of collective autonomous agents", Robot. Autonomous Syst., vol. 16, no. 2-4, pp. 321-331, 1995.
-
(1995)
Robot. Autonomous Syst.
, vol.16
, Issue.2-4
, pp. 321-331
-
-
Matarić, M.J.1
-
42
-
-
79961020139
-
Development of a flexible and agile multi-robot manufacturing system
-
S. Hoshino, H. Seki, and Y. Naka, "Development of a flexible and agile multi-robot manufacturing system", in Proc. 17th IFAC World Congr., 2008, pp. 15786-15791.
-
(2008)
Proc. 17th IFAC World Congr.
, pp. 15786-15791
-
-
Hoshino, S.1
Seki, H.2
Naka, Y.3
-
43
-
-
0027699922
-
Autonomous intelligent cruise control
-
P. A. Ioannou and C. C. Chien, "Autonomous intelligent cruise control", IEEE Trans. Veh. Technol., vol. 42, pp. 657-672, 1993.
-
(1993)
IEEE Trans. Veh. Technol.
, vol.42
, pp. 657-672
-
-
Ioannou, P.A.1
Chien, C.C.2
-
44
-
-
0344546784
-
Motion planning of multiple mobile robots using virtual impedance
-
T. Arai and J. Ota, "Motion planning of multiple mobile robots using virtual impedance", J. Robot. Mech., vol. 8, no. 1, pp. 67-74, 1996.
-
(1996)
J. Robot. Mech.
, vol.8
, Issue.1
, pp. 67-74
-
-
Arai, T.1
Ota, J.2
-
45
-
-
0030196183
-
Dwarf intelligence - A large object carriedbyseven dwarves
-
T. Arai and J. Ota, "Dwarf intelligence - A large object carriedbyseven dwarves", Robot. Autonomous Syst., vol. 18, no. 1-2, pp. 149-155, 1996.
-
(1996)
Robot. Autonomous Syst.
, vol.18
, Issue.1-2
, pp. 149-155
-
-
Arai, T.1
Ota, J.2
-
46
-
-
15844414895
-
Impedance control for a vehicle platoon system
-
S.-Y. Yi and K.-T. Chong, "Impedance control for a vehicle platoon system", Mechatronics, vol. 15, no. 5, pp. 627-638, 2005.
-
(2005)
Mechatronics
, vol.15
, Issue.5
, pp. 627-638
-
-
Yi, S.-Y.1
Chong, K.-T.2
-
47
-
-
0034543030
-
Impedance control for truck collision avoidance
-
A. Gorjestani, C. Shankwitz, and M. Donath, "Impedance control for truck collision avoidance", in Proc. Amer. Control Conf., 2000, pp. 1519-1524.
-
(2000)
Proc. Amer. Control Conf.
, pp. 1519-1524
-
-
Gorjestani, A.1
Shankwitz, C.2
Donath, M.3
|