메뉴 건너뛰기




Volumn 24, Issue 2-7, 2000, Pages 377-383

Scheduling of pipeless batch plants using constraint satisfaction techniques

Author keywords

Constraint satisfaction technique; Pipeless batch plants; Scheduling

Indexed keywords

ALGORITHMS; CONSTRAINT THEORY; INTEGER PROGRAMMING; LINEAR PROGRAMMING; MATHEMATICAL MODELS; RESOURCE ALLOCATION; SCHEDULING; SEARCH ENGINES;

EID: 0034660721     PISSN: 00981354     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0098-1354(00)00483-X     Document Type: Conference Paper
Times cited : (16)

References (5)
  • 1
    • 77956758599 scopus 로고    scopus 로고
    • Scheduling of multistage multiproduct chemical batch plants using a constraint-based approach
    • Huang, W., & Chung, P. W. H. (1999). Scheduling of multistage multiproduct chemical batch plants using a constraint-based approach. Computers and Chemical Engineering, 23(Suppl.), S511-S514.
    • (1999) Computers and Chemical Engineering , vol.23 , Issue.SUPPL.
    • Huang, W.1    Chung, P.W.H.2
  • 3
    • 0001918303 scopus 로고
    • Pipeless plants boost batch processing
    • Niwa, T. (1993). Pipeless plants boost batch processing. Chemical Engineering, 100(6), 102-108.
    • (1993) Chemical Engineering , vol.100 , Issue.6 , pp. 102-108
    • Niwa, T.1
  • 5
    • 0030174162 scopus 로고    scopus 로고
    • Simultaneous design, layout and scheduling of pipeless batch plants
    • Realff, M. J., Shah, N., & Pantelides, C. C. (1996). Simultaneous design, layout and scheduling of pipeless batch plants. Computers and Chemical Engineering, 20(6/7), 869-883.
    • (1996) Computers and Chemical Engineering , vol.20 , Issue.6-7 , pp. 869-883
    • Realff, M.J.1    Shah, N.2    Pantelides, C.C.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.