1
-
-
0029214414
-
A discrete-event simulation approach for scheduling batch processes
-
Baudet, P., Assaro-Pantel, C., Domenech, S. and Pibouleau, L. (1995) A discrete-event simulation approach for scheduling batch processes. Comput. Chem. Engng. 19 (suppl.), S633-S638.
-
(1995)
Comput. Chem. Engng.
, vol.19
, Issue.SUPPL.
-
-
Baudet, P.1
Assaro-Pantel, C.2
Domenech, S.3
Pibouleau, L.4
-
2
-
-
0029277453
-
Optimal feedback control design for discrete-event systems using simulated annealing
-
Boissel, O. and Kantor, J. (1995) Optimal feedback control design for discrete-event systems using simulated annealing. Comput. Chem. Engng. 19, 253-266.
-
(1995)
Comput. Chem. Engng.
, vol.19
, pp. 253-266
-
-
Boissel, O.1
Kantor, J.2
-
4
-
-
0001499525
-
Minimizing the effects of batch process variability using online schedule modification
-
Cott, B. and Macchietto, S. (1989) Minimizing the effects of batch process variability using online schedule modification. Comput. Chem. Engng. 13, 105-113.
-
(1989)
Comput. Chem. Engng.
, vol.13
, pp. 105-113
-
-
Cott, B.1
Macchietto, S.2
-
5
-
-
0029254356
-
Robust scheduling to hedge against processing time uncertainty in single-stage production
-
Daniels, R.L. and Kouvelis, P. (1995) Robust scheduling to hedge against processing time uncertainty in single-stage production. Management Sci. 41, 363-376.
-
(1995)
Management Sci.
, vol.41
, pp. 363-376
-
-
Daniels, R.L.1
Kouvelis, P.2
-
6
-
-
0020765805
-
Simulation/optimization of a specialties plant
-
Felder, R., McLeod, G. and Moldin, R. (1983) Simulation/optimization of a specialties plant. Chem. Engng. Prog. 6, 84-89.
-
(1983)
Chem. Engng. Prog.
, vol.6
, pp. 84-89
-
-
Felder, R.1
McLeod, G.2
Moldin, R.3
-
7
-
-
0022077459
-
Simulation for the capacity planning of specialty chemicals production
-
Felder, R., McLeod, G. and Moldin, R. (1983) Simulation for the capacity planning of specialty chemicals production. Chem. Engng. Prog. 81, 41-46.
-
(1983)
Chem. Engng. Prog.
, vol.81
, pp. 41-46
-
-
Felder, R.1
McLeod, G.2
Moldin, R.3
-
8
-
-
33444470984
-
Optimal design of a multi-purpose pipeless batch chemical plant
-
Montebello, Canada
-
Hasebe, S. and Hashimoto, I. Optimal design of a multi-purpose pipeless batch chemical plant. Proc. PSE'91, Montebello, Canada (1991).
-
(1991)
Proc. PSE'91
-
-
Hasebe, S.1
Hashimoto, I.2
-
11
-
-
0030083915
-
A process-variability-based online scheduling system in multiproduct batch process
-
Ishii, N. and Muraki, M. (1995) A process-variability-based online scheduling system in multiproduct batch process. Comput. Chem. Engng. 20, 217-234.
-
(1995)
Comput. Chem. Engng.
, vol.20
, pp. 217-234
-
-
Ishii, N.1
Muraki, M.2
-
12
-
-
33646285218
-
Pipeless plants move toward new cpi uses
-
Kamiya, T. and Fouhy, K. (1997) Pipeless plants move toward new cpi uses. Chem. Enging. 104(2), 33-35.
-
(1997)
Chem. Enging.
, vol.104
, Issue.2
, pp. 33-35
-
-
Kamiya, T.1
Fouhy, K.2
-
13
-
-
0021838516
-
Sequencing a generalized two-stage flowshop with finite intermediate storage
-
Knopf, F.C. (1985). Sequencing a generalized two-stage flowshop with finite intermediate storage. Comput. Chem. Engng. 9, 207-221.
-
(1985)
Comput. Chem. Engng.
, vol.9
, pp. 207-221
-
-
Knopf, F.C.1
-
14
-
-
0027545176
-
A general algorithm for short-term scheduling of batch operations, part-1 milp formulation, 1993
-
Kondili, E., Pantelides, C.C. and Sargent, R.W.H. (1993) A general algorithm for short-term scheduling of batch operations, part-1 milp formulation, 1993, Comput. Chem. Engng. 17, 211-227.
-
(1993)
Comput. Chem. Engng.
, vol.17
, pp. 211-227
-
-
Kondili, E.1
Pantelides, C.C.2
Sargent, R.W.H.3
-
15
-
-
30044443668
-
A proposal for decentralized cooperative decision-making in chemical batch operation
-
Kuroda, C. and Ishida, M. (1993) A proposal for decentralized cooperative decision-making in chemical batch operation. Engng. Appl. Artif. Intell. 6, 399-407.
-
(1993)
Engng. Appl. Artif. Intell.
, vol.6
, pp. 399-407
-
-
Kuroda, C.1
Ishida, M.2
-
16
-
-
0029703040
-
A framework for operation strategy of pipeless batch plants
-
Liu, R. and McGreavy, C. (1996) A framework for operation strategy of pipeless batch plants, Comput. Chem. Engng. 20(suppl.), S1161-S1166.
-
(1996)
Comput. Chem. Engng.
, vol.20
, Issue.SUPPL.
-
-
Liu, R.1
McGreavy, C.2
-
17
-
-
0029236537
-
A framework for investigating schedule robustness under uncertainty
-
Mignon, D., Honkomp, S. and Reklaitis, G. (1995) A framework for investigating schedule robustness under uncertainty, Comput Chem. Engng. 19 (suppl.), S615-S620.
-
(1995)
Comput Chem. Engng.
, vol.19
, Issue.SUPPL.
-
-
Mignon, D.1
Honkomp, S.2
Reklaitis, G.3
-
18
-
-
0001918303
-
Pipless plants boost batch processing
-
(June)
-
Niwa, T. (1993) Pipless plants boost batch processing. Chem. Engng. (June), 102-107.
-
(1993)
Chem. Engng.
, pp. 102-107
-
-
Niwa, T.1
-
19
-
-
0017959332
-
GASP IV and the simulation of batch/semicontinuous operations: Single train processes
-
Overturf, B.W., Reklaitis, G.V. and Woods, J.M. (1978) GASP IV and the simulation of batch/semicontinuous operations: single train processes, Ind. Eng. Chem. Process. Des. Dev. 17, 161-165.
-
(1978)
Ind. Eng. Chem. Process. Des. Dev.
, vol.17
, pp. 161-165
-
-
Overturf, B.W.1
Reklaitis, G.V.2
Woods, J.M.3
-
20
-
-
0029303852
-
Short term scheduling of pipeless batch chemical plants
-
Pantelides, C.C., Realff, M. J. and Shah, N. (1995) Short term scheduling of pipeless batch chemical plants. Trans. Inst. Chem. Engrs. 73(A4), 431-444.
-
(1995)
Trans. Inst. Chem. Engrs.
, vol.73
, Issue.A4
, pp. 431-444
-
-
Pantelides, C.C.1
Realff, M.J.2
Shah, N.3
-
22
-
-
0030174162
-
Simultaneous design, layout and scheduling of pipeless batch plants
-
Realff, M.J., Shah, N. and Pantelides, C.C. (1990) Simultaneous design, layout and scheduling of pipeless batch plants. Comput. Chem. Engng. 20, 869-883.
-
(1990)
Comput. Chem. Engng.
, vol.20
, pp. 869-883
-
-
Realff, M.J.1
Shah, N.2
Pantelides, C.C.3
-
23
-
-
0010241788
-
Pipeless batch chemical plants offer a new approach
-
Shimatami, K. and Okuda, O. (1992). Pipeless batch chemical plants offer a new approach. Chem. Engng. 99, 181-182.
-
(1992)
Chem. Engng.
, vol.99
, pp. 181-182
-
-
Shimatami, K.1
Okuda, O.2
-
24
-
-
33646285552
-
Moving tank type batch plant operation and evaluation
-
(September/October)
-
Takahasi, K. (1990) Moving tank type batch plant operation and evaluation. Intl. Chem. Engng. (September/October).
-
(1990)
Intl. Chem. Engng.
-
-
Takahasi, K.1
-
25
-
-
0010243955
-
New concept for batchwise specialty chemical production plant
-
(September/October)
-
Takahasi, K. and Fujii, H. (1990) New concept for batchwise specialty chemical production plant. Intl. Chem. Engng. (September/October.)
-
(1990)
Intl. Chem. Engng.
-
-
Takahasi, K.1
Fujii, H.2
-
26
-
-
38249024270
-
Productivity analysis of a large multiproduct batch processing facility
-
White, C.H. (1989) Productivity analysis of a large multiproduct batch processing facility. Comput. Chem. Engng. 13, 239-245.
-
(1989)
Comput. Chem. Engng.
, vol.13
, pp. 239-245
-
-
White, C.H.1
-
27
-
-
33847469477
-
RSCP+ + a scheduling system for the chemical process industry
-
Kyongju, South Korea
-
Zentner, M.G., Pekriy, J.F., Miller, D.L. and Reklaitis, G.V. RSCP+ + a scheduling system for the chemical process industry. Proc. FSE'94, Kyongju, South Korea (1994).
-
(1994)
Proc. FSE'94
-
-
Zentner, M.G.1
Pekriy, J.F.2
Miller, D.L.3
Reklaitis, G.V.4
|