메뉴 건너뛰기




Volumn 6, Issue 3, 2010, Pages 369-380

Profinet IO IRT message scheduling with temporal constraints

Author keywords

Profinet; real time systems; scheduling; TDMA; time triggered Ethernet

Indexed keywords

COMMERCIAL TOOLS; COMMUNICATION CYCLE; COMPUTATIONAL TIME; END-TO-END DEADLINE; INDUSTRIAL ETHERNETS; ISOCHRONOUS REAL TIME; MAKESPAN; MESSAGE SCHEDULING; PROFINET; RELEASE DATE; RESOURCE CONSTRAINED PROJECT SCHEDULING; SCHEDULING PROBLEM; TDMA; TEMPORAL CONSTRAINTS; TIME TRIGGERED;

EID: 77955714804     PISSN: 15513203     EISSN: None     Source Type: Journal    
DOI: 10.1109/TII.2010.2052819     Document Type: Article
Times cited : (78)

References (49)
  • 1
    • 0032736579 scopus 로고    scopus 로고
    • Resource constrained project scheduling: Notation classification models andmethods
    • P. Brucker, A. Drex, R. Mhring, K. Neumann, and E. Pesch, "Resource constrained project scheduling: Notation, classification, models, andmethods," Eur. J. Oper. Res., vol.112, no.1, pp. 3-41, 1999.
    • (1999) Eur. J. Oper. Res. , vol.112 , Issue.1 , pp. 3-41
    • Brucker, P.1    Drex, A.2    Mhring, R.3    Neumann, K.4    Pesch, E.5
  • 3
    • 0033339383 scopus 로고    scopus 로고
    • Real-time fieldbus communications using Profibus networks
    • E. Tovar and F. Vasques, "Real-time fieldbus communications using Profibus networks," IEEE Trans. Ind. Electron., vol.46, no.6, pp. 1241-1251, 1999.
    • (1999) IEEE Trans. Ind. Electron. , vol.46 , Issue.6 , pp. 1241-1251
    • Tovar, E.1    Vasques, F.2
  • 5
    • 19644394449 scopus 로고    scopus 로고
    • Building models of real-time systems from application software
    • J. Sifakis, S. Tripakis, and S. Yovine, "Building models of real-time systems from application software," Proc. IEEE, vol.91, no.1, pp. 100-111, 2003.
    • (2003) Proc. IEEE , vol.91 , Issue.1 , pp. 100-111
    • Sifakis, J.1    Tripakis, S.2    Yovine, S.3
  • 7
    • 0141684229 scopus 로고    scopus 로고
    • The time-triggered architecture
    • H. Kopetz and G. Bauer, "The time-triggered architecture," Proc. IEEE, vol.91, no.1, pp. 112-126, 2003.
    • (2003) Proc. IEEE , vol.91 , Issue.1 , pp. 112-126
    • Kopetz, H.1    Bauer, G.2
  • 10
    • 40149112316 scopus 로고    scopus 로고
    • Timing analysis of the FlexRay communication protocol
    • T. Pop, P. Pop, P. Eles, Z. Peng, and A. Andrei, "Timing analysis of the FlexRay communication protocol," Real-Time Systems, vol.39, no.1-3, pp. 205-235, 2008.
    • (2008) Real-Time Systems , vol.39 , Issue.1-3 , pp. 205-235
    • Pop, T.1    Pop, P.2    Eles, P.3    Peng, Z.4    Andrei, A.5
  • 11
    • 33645672593 scopus 로고    scopus 로고
    • Timeliness of real-time IP communication in switched industrial Ethernet networks
    • Feb.
    • T. Skeie, S. Johannessen, and ø. Holmeide, "Timeliness of real-time IP communication in switched industrial Ethernet networks," IEEE Trans. Ind. Informat., vol.2, no.1, pp. 25-39, Feb. 2006.
    • (2006) IEEE Trans. Ind. Informat. , vol.2 , Issue.1 , pp. 25-39
    • Skeie, T.1    Johannessen, S.2    Holmeide, O.3
  • 12
    • 17444426655 scopus 로고    scopus 로고
    • Communication architectures for electrical drives
    • Feb.
    • F. Benzi, G. Buja, and M. Felser, "Communication architectures for electrical drives," IEEE Trans. Ind. Informat., vol.1, no.1, pp. 47-53, Feb. 2005.
    • (2005) IEEE Trans. Ind. Informat. , vol.1 , Issue.1 , pp. 47-53
    • Benzi, F.1    Buja, G.2    Felser, M.3
  • 13
    • 69249216631 scopus 로고    scopus 로고
    • Hardware acceleration for conditional state-based communication scheduling on real-time Ethernet
    • Aug.
    • S. Fischmeister, R. Trausmuth, and I. Lee, "Hardware acceleration for conditional state-based communication scheduling on real-time Ethernet," IEEE Trans. Ind. Informat., vol.5, no.3, pp. 325-337, Aug. 2009.
    • (2009) IEEE Trans. Ind. Informat. , vol.5 , Issue.3 , pp. 325-337
    • Fischmeister, S.1    Trausmuth, R.2    Lee, I.3
  • 14
    • 56349139095 scopus 로고    scopus 로고
    • Aspects of development and engineering of a migration solution for existing heterogeneous distributed automation systems
    • Sep.
    • C. Hahn, R. Lehmann, and M.Wollschlaeger, "Aspects of development and engineering of a migration solution for existing heterogeneous distributed automation systems," in Proc. IEEE Int. Conf. Emerging Technol. Factory Autom., ETFA 2008, Sep. 2008, pp. 17-20.
    • (2008) Proc. IEEE Int. Conf. Emerging Technol. Factory Autom. ETFA 2008 , pp. 17-20
    • Hahn, C.1    Lehmann, R.2    Wollschlaeger, M.3
  • 15
    • 21644475498 scopus 로고    scopus 로고
    • Real-time Ethernet-Industry prospective
    • M. Felser, "Real-time Ethernet-Industry prospective," Proc. IEEE, vol.93, pp. 1118-1129, 2005.
    • (2005) Proc. IEEE , vol.93 , pp. 1118-1129
    • Felser, M.1
  • 21
    • 26944492655 scopus 로고    scopus 로고
    • Improving the realtime behavior of Ethernet networks using traffic smoothing
    • Aug.
    • L. L. Bello, G. A. Kaczynski, and O. Mirabella, "Improving the realtime behavior of Ethernet networks using traffic smoothing," IEEE Trans. Ind. Informat., vol.1, no.3, pp. 151-161, Aug. 2005.
    • (2005) IEEE Trans. Ind. Informat. , vol.1 , Issue.3 , pp. 151-161
    • Bello, L.L.1    Kaczynski, G.A.2    Mirabella, O.3
  • 26
    • 67349132442 scopus 로고    scopus 로고
    • Analysis of Ethernet powerlink wireless extensions based on the IEEE 802.11 wlan
    • May
    • L. Seno, S. Vitturi, and C. Zunino, "Analysis of Ethernet powerlink wireless extensions based on the IEEE 802.11 wlan," IEEE Trans. Ind. Informat., vol.5, no.2, pp. 86-98, May 2009.
    • (2009) IEEE Trans. Ind. Informat. , vol.5 , Issue.2 , pp. 86-98
    • Seno, L.1    Vitturi, S.2    Zunino, C.3
  • 27
    • 62449153597 scopus 로고    scopus 로고
    • A probabilistic analysis of end-to-end delays on an AFDX avionic network
    • Feb.
    • J.-L. Scharbarg, F. Ridouard, and C. Fraboul, "A probabilistic analysis of end-to-end delays on an AFDX avionic network," IEEE Trans. Ind. Informat., vol.5, no.1, pp. 38-49, Feb. 2009.
    • (2009) IEEE Trans. Ind. Informat. , vol.5 , Issue.1 , pp. 38-49
    • Scharbarg, J.-L.1    Ridouard, F.2    Fraboul, C.3
  • 30
    • 33847325162 scopus 로고    scopus 로고
    • Profinet: An integration platform for heterogeneous industrial communication systems
    • Sep.
    • J. Jasperneite and J. Feld, "Profinet: An integration platform for heterogeneous industrial communication systems," in Proc. 10th IEEE Conf. Emerging Technol. Factory Autom., Sep. 2005, vol.1, pp. 156-164.
    • (2005) Proc. 10th IEEE Conf. Emerging Technol. Factory Autom. , vol.1 , pp. 156-164
    • Jasperneite, J.1    Feld, J.2
  • 31
    • 77955711492 scopus 로고    scopus 로고
    • Isochrone mode function manual. 03/2006
    • Siemens Simatic
    • Siemens Simatic, "Isochrone mode, function manual. 03/2006," Document No. A5E00223279-02.
    • Document No. A5E00223279-02
  • 32
    • 24944471617 scopus 로고    scopus 로고
    • An extremely fast, exact algorithm for finding shortest paths in static networks with geographical background
    • U. Lauther, "An extremely fast, exact algorithm for finding shortest paths in static networks with geographical background," GI-Tage, vol.22, pp. 219-230, 2004.
    • (2004) GI-Tage , vol.22 , pp. 219-230
    • Lauther, U.1
  • 33
    • 33845591616 scopus 로고    scopus 로고
    • A top-down approach for real-time industrial-Ethernet networks using edge-coloring of conflict multigraphs
    • F. Dopatka and R. Wismueller, "A top-down approach for real-time industrial-Ethernet networks using edge-coloring of conflict multigraphs," in Proc. Int. Symp. Power Electronics, El. Drives, Autom. Motion, 2006, pp. S3125-S3132.
    • (2006) Proc. Int. Symp. Power Electronics El. Drives Autom. Motion
    • Dopatka, F.1    Wismueller, R.2
  • 35
    • 0036182335 scopus 로고    scopus 로고
    • A constraint-based method for project scheduling with time windows
    • A. Cesta, A. Oddi, and S. F. Smith, "A constraint-based method for project scheduling with time windows," J. Heuristics, vol.8, no.1, pp. 109-136, 2002.
    • (2002) J. Heuristics , vol.8 , Issue.1 , pp. 109-136
    • Cesta, A.1    Oddi, A.2    Smith, S.F.3
  • 36
    • 0012442701 scopus 로고    scopus 로고
    • Truncated branch-andbound, schedule construction, and schedule-improvement procedures for resource-constrained project scheduling
    • B. Franck, K. Neumann, and C. Schwindt, "Truncated branch-andbound, schedule construction, and schedule-improvement procedures for resource-constrained project scheduling," OR Spektrum, vol.23, pp. 297-324, 2001.
    • (2001) OR Spektrum , vol.23 , pp. 297-324
    • Franck, B.1    Neumann, K.2    Schwindt, C.3
  • 39
    • 77955709041 scopus 로고    scopus 로고
    • Siemens Document No. C79000-G8976-C218-03, available online.
    • Simatic Net CP1616/1604 Operating Instructions, Siemens, 01 2009, Document No. C79000-G8976-C218-03, available online.
    • (2009) Simatic Net CP1616/1604 Operating Instructions , vol.1
  • 41
    • 77955711898 scopus 로고    scopus 로고
    • Document No. 6SL3097-4AB00-0BP0, available online
    • Sinamics S120 Drive Functions Siemens, 11 2009, Document No. 6SL3097-4AB00-0BP0, available online.
    • (2009) Sinamics S120 Drive Functions Siemens , vol.11
  • 46
    • 0028413052 scopus 로고
    • A theory of timed automata
    • R. Alur and D. Dill, "A theory of timed automata," J. Theoret. Comput. Sci., vol.126, pp. 183-235, 1994.
    • (1994) J. Theoret. Comput. Sci. , vol.126 , pp. 183-235
    • Alur, R.1    Dill, D.2
  • 48
    • 0032042933 scopus 로고    scopus 로고
    • Resource constrained project scheduling: A survey of recent developments
    • W. Herroelen, B. D. Reyck, and E. Demeulemeester, "Resource constrained project scheduling: A survey of recent developments," Comput. Oper. Res., vol.25, no.4, pp. 279-302, 1998.
    • (1998) Comput. Oper. Res. , vol.25 , Issue.4 , pp. 279-302
    • Herroelen, W.1    Reyck, B.D.2    Demeulemeester, E.3
  • 49
    • 9644266019 scopus 로고    scopus 로고
    • Scheduling the production of rolling ingots: Industrial context, model and solution method
    • Nov.
    • C. Schwindt and N. Trautmann, "Scheduling the production of rolling ingots: Industrial context, model and solution method," Int. Trans. Oper. Res., vol.10, no.6, pp. 547-563, Nov. 2003.
    • (2003) Int. Trans. Oper. Res. , vol.10 , Issue.6 , pp. 547-563
    • Schwindt, C.1    Trautmann, N.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.