-
1
-
-
0004115996
-
-
Prentice Hall, Englewood Cliffs
-
Ahuja, R., Magnanti, T., Orlin, J., 1993. Network Flows. Prentice Hall, Englewood Cliffs.
-
(1993)
Network Flows
-
-
Ahuja, R.1
Magnanti, T.2
Orlin, J.3
-
2
-
-
34250094949
-
Scheduling project networks with resource constraints and time windows
-
Bartusch, M., Möhring, R.H., Radermacher, F.-J., 1988. Scheduling project networks with resource constraints and time windows. Annals of Operations Research, 16, 201-240.
-
(1988)
Annals of Operations Research
, vol.16
, pp. 201-240
-
-
Bartusch, M.1
Möhring, R.H.2
Radermacher, F.-J.3
-
4
-
-
0032736579
-
Resource-constrained project scheduling
-
Brucker, P., Drexl, A., Möhring, R.H., Neumann, K., Pesch, E., 1999. Resource-constrained project scheduling: Notation, classification, models, and methods. European Journal of Operational Research, 112, 3-41.
-
(1999)
European Journal of Operational Research
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.H.3
Neumann, K.4
Pesch, E.5
-
5
-
-
34250120655
-
Erfahrungen mit einem Simulationsmodell in einer Aluminiumgießerei
-
Fleischmann, B., Jess, H., 1985. Erfahrungen mit einem Simulationsmodell in einer Aluminiumgießerei. OR Spektrum, 7, 175-185.
-
(1985)
OR Spektrum
, vol.7
, pp. 175-185
-
-
Fleischmann, B.1
Jess, H.2
-
7
-
-
0035890549
-
A decomposition approach for the scheduling of a steel plant production
-
Harjunkoski, I., Grossmann, I., 2001. A decomposition approach for the scheduling of a steel plant production. Computers & Chemical Engineering, 25, 1647-1660.
-
(2001)
Computers & Chemical Engineering
, vol.25
, pp. 1647-1660
-
-
Harjunkoski, I.1
Grossmann, I.2
-
9
-
-
0031699840
-
Scheduling a single batch processing machine with secondary resource constraints
-
Kempf, K.G., Uzsoy, R., Wang, C.S., 1998. Scheduling a single batch processing machine with secondary resource constraints. Journal of Manufacturing Systems, 17, 37-51.
-
(1998)
Journal of Manufacturing Systems
, vol.17
, pp. 37-51
-
-
Kempf, K.G.1
Uzsoy, R.2
Wang, C.S.3
-
10
-
-
0036461438
-
Project scheduling with inventory constraints
-
Neumann, K., Schwindt, C., 2002. Project scheduling with inventory constraints. Mathematical Methods of Operations Research, 56, 513-33.
-
(2002)
Mathematical Methods of Operations Research
, vol.56
, pp. 513-533
-
-
Neumann, K.1
Schwindt, C.2
-
11
-
-
0012361022
-
-
Lecture Notes in Economics and Mathematical Systems, Springer, Berlin
-
Neumann, K., Schwindt, C., Zimmermann, J., 2001. Project Scheduling with Time Windows and Scarce Resources. Lecture Notes in Economics and Mathematical Systems, Vol. 508. Springer, Berlin.
-
(2001)
Project Scheduling with Time Windows and Scarce Resources
, vol.508
-
-
Neumann, K.1
Schwindt, C.2
Zimmermann, J.3
-
12
-
-
0442264225
-
Advanced production scheduling for batch plants in process industries
-
Neumann, K., Schwindt, C., Trautmann, N., 2002. Advanced production scheduling for batch plants in process industries. OR Spectrum, 24, 251-279.
-
(2002)
OR Spectrum
, vol.24
, pp. 251-279
-
-
Neumann, K.1
Schwindt, C.2
Trautmann, N.3
-
14
-
-
0033895628
-
Scheduling with batching
-
Potts, C., Kovalyov, M., 2000. Scheduling with batching: A review. European Journal of Operational Research, 120, 228-249.
-
(2000)
European Journal of Operational Research
, vol.120
, pp. 228-249
-
-
Potts, C.1
Kovalyov, M.2
-
15
-
-
0001775820
-
Batch scheduling in process industries
-
Schwindt, C., Trautmann, N., 2000. Batch scheduling in process industries: An application of resource-constrained project scheduling. OR Spektrum, 22, 501-524.
-
(2000)
OR Spektrum
, vol.22
, pp. 501-524
-
-
Schwindt, C.1
Trautmann, N.2
-
17
-
-
0029387205
-
Scheduling batch processing machines with incompatible job families
-
Uzsoy, R., 1995. Scheduling batch processing machines with incompatible job families. International Journal of Production Research, 33, 2685-2708.
-
(1995)
International Journal of Production Research
, vol.33
, pp. 2685-2708
-
-
Uzsoy, R.1
|