메뉴 건너뛰기




Volumn , Issue , 2009, Pages 273-298

A performance comparison between efficiency and pheromone approaches in dynamic manufacturing scheduling

Author keywords

[No Author keywords available]

Indexed keywords


EID: 77951575899     PISSN: None     EISSN: None     Source Type: Book    
DOI: 10.4018/978-1-60566-798-0.ch012     Document Type: Chapter
Times cited : (4)

References (42)
  • 1
    • 36048943650 scopus 로고    scopus 로고
    • Using ant colony optimization to solve hybrid flow shop scheduling problems
    • doi:10.1007/s00170-007-1048-2
    • Alaykýran, K., Engin, O., & Döyen, A. (2007). Using ant colony optimization to solve hybrid flow shop scheduling problems. International Journal of Advanced Manufacturing Technology, 35, 541-550. doi:10.1007/s00170-007-1048-2
    • (2007) International Journal of Advanced Manufacturing Technology , vol.35 , pp. 541-550
    • Alaykýran, K.1    Engin, O.2    Döyen, A.3
  • 2
    • 4944232011 scopus 로고    scopus 로고
    • A simulated annealing algorithm for multi-agent systems: A job shop scheduling application
    • doi:10.1023/B:JIMS.0000042665.10086.cf
    • Aydin, M. E., & Fogarty, T. C. (2004). A simulated annealing algorithm for multi-agent systems: A job shop scheduling application. Journal of Intelligent Manufacturing, 15, 805-814. doi:10.1023/B:JIMS.0000042665.10086.cf
    • (2004) Journal of Intelligent Manufacturing , vol.15 , pp. 805-814
    • Aydin, M.E.1    Fogarty, T.C.2
  • 3
    • 9344232811 scopus 로고    scopus 로고
    • Ant colony optimization techniques for the vehicle routing problem
    • doi:10.1016/j.aei.2004.07.001
    • Bell, J. E., & McMullen, P. R. (2004). Ant colony optimization techniques for the vehicle routing problem. Advanced Engineering Informatics, 1(8), 41-48. doi:10.1016/j.aei.2004.07.001
    • (2004) Advanced Engineering Informatics , vol.1 , Issue.8 , pp. 41-48
    • Bell, J.E.1    McMullen, P.R.2
  • 5
  • 6
    • 0029404744 scopus 로고
    • A learning based methodology for dynamic scheduling in distributed manufacturing systems
    • doi:10.1080/00207549508904870
    • Chiuc, C., & Yih, Y. (1995). A learning based methodology for dynamic scheduling in distributed manufacturing systems. International Journal of Production Research, 33(11), 3217-3232. doi:10.1080/00207549508904870
    • (1995) International Journal of Production Research , vol.33 , Issue.11 , pp. 3217-3232
    • Chiuc, C.1    Yih, Y.2
  • 7
    • 0036604832 scopus 로고    scopus 로고
    • Using real time information for effective dynamic scheduling
    • doi:10.1016/S0377-2217(01)00355-1
    • Cowling, P. I., & Johansson, M. (2002). Using real time information for effective dynamic scheduling. European Journal of Operational Research, 139(2), 230-244. doi:10.1016/S0377-2217(01)00355-1
    • (2002) European Journal of Operational Research , vol.139 , Issue.2 , pp. 230-244
    • Cowling, P.I.1    Johansson, M.2
  • 9
    • 0141919583 scopus 로고    scopus 로고
    • A multi-agent architecture for dynamic scheduling of steel hot rolling
    • doi:10.1023/A:1025701325275
    • Cowling, P. I., Ouelhadj, D., & Petrovic, S. (2003). A multi-agent architecture for dynamic scheduling of steel hot rolling. Journal of Intelligent Manufacturing, 14, 457-470. doi:10.1023/A:1025701325275
    • (2003) Journal of Intelligent Manufacturing , vol.14 , pp. 457-470
    • Cowling, P.I.1    Ouelhadj, D.2    Petrovic, S.3
  • 10
    • 2442695353 scopus 로고    scopus 로고
    • Dynamic scheduling of steel casting and milling using multi-agents
    • doi:10.1080/09537280410001662466
    • Cowling, P. I., Ouelhadj, D., & Petrovic, S. (2004). Dynamic scheduling of steel casting and milling using multi-agents. Journal of Production Planning and Control, 15(2), 178-188. doi:10.1080/09537280410001662466
    • (2004) Journal of Production Planning and Control , vol.15 , Issue.2 , pp. 178-188
    • Cowling, P.I.1    Ouelhadj, D.2    Petrovic, S.3
  • 13
    • 0027146758 scopus 로고
    • Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling
    • doi:10.1080/00207549308956713
    • MacCarthy, B. L., & Liu, J. (1993). Addressing the gap in scheduling research: A review of optimization and heuristic methods in production scheduling. International Journal of Production Research, 31(1), 59-79. doi:10.1080/00207549308956713
    • (1993) International Journal of Production Research , vol.31 , Issue.1 , pp. 59-79
    • Maccarthy, B.L.1    Liu, J.2
  • 16
    • 13844249860 scopus 로고    scopus 로고
    • Contract net protocol for cooperative optimisation and dynamic scheduling of steel production
    • In A. Ibraham, K. Franke, & M. Koppen (Eds.), Berlin, Germany, Springer-Verlag
    • Ouelhadj, D., Cowling, P. I., & Petrovic, S. (2003a). Contract net protocol for cooperative optimisation and dynamic scheduling of steel production. In A. Ibraham, K. Franke, & M. Koppen (Eds.), Intelligent systems design and applications (pp. 457-470). Berlin, Germany: Springer-Verlag.
    • (2003) Intelligent Systems Design and Applications , pp. 457-470
    • Ouelhadj, D.1    Cowling, P.I.2    Petrovic, S.3
  • 20
    • 15344338961 scopus 로고    scopus 로고
    • Two ant-colony algorithms for minimizing total flowtime in permutation flowshops
    • doi:10.1016/j.cie.2004.12.009
    • Rajendran, C., & Ziegler, H. (2005). Two ant-colony algorithms for minimizing total flowtime in permutation flowshops. Computers & Industrial Engineering, 48(4), 789-797. doi:10.1016/j.cie.2004.12.009
    • (2005) Computers & Industrial Engineering , vol.48 , Issue.4 , pp. 789-797
    • Rajendran, C.1    Ziegler, H.2
  • 22
    • 0344843994 scopus 로고    scopus 로고
    • A new decision making strategy for distributed control of cellular manufacturing systems
    • In C. H. Dagli et al. (Eds.), New York, ASME Press
    • Renna, P., Perrone, G., Amico, M., & Bruccoleri, M. (2001). A new decision making strategy for distributed control of cellular manufacturing systems. In C. H. Dagli et al. (Eds.), Intelligent engineering through artificial neural networks (pp. 975-980). New York: ASME Press.
    • (2001) Intelligent Engineering through Artificial Neural Networks , pp. 975-980
    • Renna, P.1    Perrone, G.2    Amico, M.3    Bruccoleri, M.4
  • 24
    • 34247624966 scopus 로고    scopus 로고
    • Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method
    • doi:10.1016/j.rcim.2006.06.004
    • Rossi, A., & Dini, G. (2007). Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation method. Robotics and Computer-integrated Manufacturing, 23(5), 503-516. doi:10.1016/j.rcim.2006.06.004
    • (2007) Robotics and Computer-integrated Manufacturing , vol.23 , Issue.5 , pp. 503-516
    • Rossi, A.1    Dini, G.2
  • 27
    • 0034205722 scopus 로고    scopus 로고
    • Metaphor II: An agent-based architecture for distributed intelligent design and manufacturing
    • doi:10.1023/A:1008915208259
    • Shen, W., Maturana, F., & Norrie, D. (2000). Metaphor II: An agent-based architecture for distributed intelligent design and manufacturing. Journal of Intelligent Manufacturing, 11(3), 237-251. doi:10.1023/A:1008915208259
    • (2000) Journal of Intelligent Manufacturing , vol.11 , Issue.3 , pp. 237-251
    • Shen, W.1    Maturana, F.2    Norrie, D.3
  • 29
    • 0036200385 scopus 로고    scopus 로고
    • Distributed manufacturing scheduling using intelligent agents
    • doi:10.1109/5254.988492
    • Shen, W. M. (2002). Distributed manufacturing scheduling using intelligent agents. IEEE Intelligent Systems, 17(1), 88-94. doi:10.1109/5254.988492
    • (2002) IEEE Intelligent Systems , vol.17 , Issue.1 , pp. 88-94
    • Shen, W.M.1
  • 30
    • 1342287300 scopus 로고    scopus 로고
    • Auction-based distributed scheduling and control scheme for flexible manufacturing systems
    • doi:10.1080/00207540310001613683
    • Siwamogsatham, V., & Saygin, C. (2004). Auction-based distributed scheduling and control scheme for flexible manufacturing systems. International Journal of Production Research, 42, 547-572. doi:10.1080/00207540310001613683
    • (2004) International Journal of Production Research , vol.42 , pp. 547-572
    • Siwamogsatham, V.1    Saygin, C.2
  • 31
    • 0019180974 scopus 로고
    • The contract net protocol: High level communication and control in a distributed problem solver
    • doi:10.1109/TC.1980.1675516
    • Smith, R. G. (1980). The contract net protocol: High level communication and control in a distributed problem solver. IEEE Transactions on Computers, 29(12), 1104-1113. doi:10.1109/TC.1980.1675516
    • (1980) IEEE Transactions on Computers , vol.29 , Issue.12 , pp. 1104-1113
    • Smith, R.G.1
  • 32
    • 0032624359 scopus 로고    scopus 로고
    • A distributed architecture and negotiation protocol for scheduling in manufacturing systems
    • doi:10.1016/S0166-3615(98)00112-2
    • Sousa, P., & Ramos, C. (1999). A distributed architecture and negotiation protocol for scheduling in manufacturing systems. Computers in Industry, 38(2), 103-113. doi:10.1016/S0166-3615(98)00112-2
    • (1999) Computers in Industry , vol.38 , Issue.2 , pp. 103-113
    • Sousa, P.1    Ramos, C.2
  • 35
    • 0342906527 scopus 로고    scopus 로고
    • An agent model for incentive-based production scheduling
    • doi:10.1016/S0166-3615(00)00066-X
    • Vancza, J., & Markus, A. (2000). An agent model for incentive-based production scheduling. Computers in Industry, 43, 173-187. doi:10.1016/S0166-3615(00)00066-X
    • (2000) Computers in Industry , vol.43 , pp. 173-187
    • Vancza, J.1    Markus, A.2
  • 36
    • 0142247355 scopus 로고    scopus 로고
    • A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems
    • doi:10.1080/713804987
    • Wang, Y. H., Yin, C. W., & Zhang, Y. (2003). A multi-agent and distributed ruler based approach to production scheduling of agile manufacturing systems. International Journal of Computer Integrated Manufacturing, 16(2), 81-92. doi:10.1080/713804987
    • (2003) International Journal of Computer Integrated Manufacturing , vol.16 , Issue.2 , pp. 81-92
    • Wang, Y.H.1    Yin, C.W.2    Zhang, Y.3
  • 37
    • 33744827670 scopus 로고    scopus 로고
    • Dynamic shop floor scheduling in multi-agent manufacturing systems
    • doi:10.1016/j.eswa.2005.09.073
    • Wonga, T. N., Leunga, C. W., Maka, K. L., & Fungb, R. Y. K. (2006). Dynamic shop floor scheduling in multi-agent manufacturing systems. Expert Systems with Applications, 31(3), 486-494. doi:10.1016/j.eswa.2005.09.073
    • (2006) Expert Systems with Applications , vol.31 , Issue.3 , pp. 486-494
    • Wonga, T.N.1    Leunga, C.W.2    Maka, K.L.3    Fungb, R.Y.K.4
  • 38
    • 36249018423 scopus 로고    scopus 로고
    • Ant colony intelligence in multi-agent dynamic manufacturing scheduling
    • doi:10.1016/j.engappai.2007.03.008
    • Xiang, W., & Lee, H. P. (2008). Ant colony intelligence in multi-agent dynamic manufacturing scheduling. Engineering Applications of Artificial Intelligence, 21, 73-85. doi:10.1016/j.engappai.2007.03.008
    • (2008) Engineering Applications of Artificial Intelligence , vol.21 , pp. 73-85
    • Xiang, W.1    Lee, H.P.2
  • 39
    • 38849110113 scopus 로고    scopus 로고
    • Ant colony optimization for multi-objective flow shop scheduling problem
    • doi:10.1016/j.cie.2007.08.003
    • Yagmahana, B., & Yeniseyb, M. M. (2008). Ant colony optimization for multi-objective flow shop scheduling problem. Computers & Industrial Engineering, 54(3), 411-420. doi:10.1016/j.cie.2007.08.003
    • (2008) Computers & Industrial Engineering , vol.54 , Issue.3 , pp. 411-420
    • Yagmahana, B.1    Yeniseyb, M.M.2
  • 40
    • 0942269532 scopus 로고    scopus 로고
    • An ant colony system for permutation flow-shop sequencing
    • doi:10.1016/S0305-0548(03)00038-8
    • Ying, K.-C., & Liao, C.-J. (2004). An ant colony system for permutation flow-shop sequencing. Computers & Operations Research, 31, 791-801. doi:10.1016/S0305-0548(03)00038-8
    • (2004) Computers & Operations Research , vol.31 , pp. 791-801
    • Ying, K.-C.1    Liao, C.-J.2
  • 41
    • 33749556446 scopus 로고    scopus 로고
    • Bio-inspired scheduling for dynamic job shops with flexible routing and sequence-dependent setups
    • doi:10.1080/00207540600621094
    • Yu, X., & Ram, B. (2006). Bio-inspired scheduling for dynamic job shops with flexible routing and sequence-dependent setups. International Journal of Production Research, 44(22), 4793-4813. doi:10.1080/00207540600621094
    • (2006) International Journal of Production Research , vol.44 , Issue.22 , pp. 4793-4813
    • Yu, X.1    Ram, B.2
  • 42
    • 47649125165 scopus 로고    scopus 로고
    • Agent-based decision support system for dynamic scheduling of a flexible manufacturing system
    • doi:10.1504/IJCAT.2008.019489
    • Zhou, B., Wang, S., & Xi, L. (2008). Agent-based decision support system for dynamic scheduling of a flexible manufacturing system. International Journal of Computer Applications in Technology, 32(1), 47-62. doi:10.1504/IJCAT.2008.019489
    • (2008) International Journal of Computer Applications in Technology , vol.32 , Issue.1 , pp. 47-62
    • Zhou, B.1    Wang, S.2    Xi, L.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.