-
1
-
-
21144478540
-
Computers that criticize 'you: Stimulus-based decision support systems'
-
Angehm, A.A. (1993) 'Computers that criticize 'you: stimulus-based decision support systems', Interfaces, Vol. 23, No. 3, pp.3-16.
-
(1993)
Interfaces
, vol.23
, Issue.3
, pp. 3-16
-
-
Angehm, A.A.1
-
2
-
-
0030393993
-
Intelligent agents framework for developing knowledge-based decision support systems for collaborative organizational processes
-
Bose, R. (1996) 'Intelligent agents framework for developing knowledge-based decision support systems for collaborative organizational processes', Expert Systems with Applications, Vol. 11, No.3, pp.247-261.
-
(1996)
Expert Systems with Applications
, vol.11
, Issue.3
, pp. 247-261
-
-
Bose, R.1
-
3
-
-
0033907504
-
The development of intelligent decision support tools to aid the design of flexible manufacturing systems
-
Chan, F.T.S., Jiang, B. and Tang, N.K.H. (2000) 'The development of intelligent decision support tools to aid the design of flexible manufacturing systems', International Journal of Production Economics, Vol. 65, No. 1, pp.73-84.
-
(2000)
International Journal of Production Economics
, vol.65
, Issue.1
, pp. 73-84
-
-
Chan, F.T.S.1
Jiang, B.2
Tang, N.K.H.3
-
4
-
-
0030081775
-
R&D project selection and scheduling with a filtered beam search approach
-
Coffin, M.A. and Taylor in, B.W. (1996) 'R&D project selection and scheduling with a filtered beam search approach', IEE Transactions, Vol. 28, pp. 167-176.
-
(1996)
IEE Transactions
, vol.28
, pp. 167-176
-
-
Coffin, M.A.1
Taylor in, B.W.2
-
5
-
-
4043168553
-
Efficient dispatching rules for dynamic job shop scheduling
-
Dominic, P.D.D., Kaliyamoorthy, S. and Kumar, M.S. (2004) 'Efficient dispatching rules for dynamic job shop scheduling', International Journal of Advanced Manufacturing Technology, Vol. 24, Nos. 1-2, pp.70-75.
-
(2004)
International Journal of Advanced Manufacturing Technology
, vol.24
, Issue.1-2
, pp. 70-75
-
-
Dominic, P.D.D.1
Kaliyamoorthy, S.2
Kumar, M.S.3
-
6
-
-
0442294401
-
Strategic decision support through comprehensive situational mapping: A multi-agent systems approach
-
Washington DC, USA, pp
-
Druckenmiller, D. (2003) 'Strategic decision support through comprehensive situational mapping: a multi-agent systems approach', Proceedings - Annual Meeting of the Decision Sciences Institute, Washington DC, USA, pp. 151-156.
-
(2003)
Proceedings - Annual Meeting of the Decision Sciences Institute
, pp. 151-156
-
-
Druckenmiller, D.1
-
7
-
-
0031220048
-
Framework for decision support systems for scheduling problems
-
Ecker, K., Gupta, J.N.D. and Schmidt, G. (1997) 'Framework for decision support systems for scheduling problems', European Journal of Operational Research, Vol. 101, No. 3, pp.452-462.
-
(1997)
European Journal of Operational Research
, vol.101
, Issue.3
, pp. 452-462
-
-
Ecker, K.1
Gupta, J.N.D.2
Schmidt, G.3
-
8
-
-
0033682027
-
Multi-agent decision support system incorporating fuzzy logic
-
Atlanta, GA, USA, pp
-
Fazlollahi, B. and Vahidov, R. (2000) 'Multi-agent decision support system incorporating fuzzy logic', Annual Conference of the North American Fuzzy Information Processing Society - NAFIPS, Atlanta, GA, USA, pp.246-250.
-
(2000)
Annual Conference of the North American Fuzzy Information Processing Society - NAFIPS
, pp. 246-250
-
-
Fazlollahi, B.1
Vahidov, R.2
-
9
-
-
0035007472
-
A rule-based support for work flows
-
Goh, A., Koh, Y-K. and Domazet, D.S. (2000) 'A rule-based support for work flows', Artificial Intelligence in Engineerings, Vol. 15, No. 1, pp.37-46.
-
(2000)
Artificial Intelligence in Engineerings
, vol.15
, Issue.1
, pp. 37-46
-
-
Goh, A.1
Koh, Y.-K.2
Domazet, D.S.3
-
10
-
-
0030782894
-
Efficient dispatching rules for scheduling in a job shop
-
Holthaus, O. and Rajendran, C (1997) 'Efficient dispatching rules for scheduling in a job shop', International Journal of Production Economics, Vol. 48, No. 1, pp.87-105.
-
(1997)
International Journal of Production Economics
, vol.48
, Issue.1
, pp. 87-105
-
-
Holthaus, O.1
Rajendran, C.2
-
11
-
-
0029772740
-
Integrated decision support systems for FMS production planning and scheduling problems
-
Jang, S.Y. and Park, J. (1996) 'Integrated decision support systems for FMS production planning and scheduling problems', International Journal of Advanced Manufacturing Technology, Vol. 11, No. 2, pp. 101-110.
-
(1996)
International Journal of Advanced Manufacturing Technology
, vol.11
, Issue.2
, pp. 101-110
-
-
Jang, S.Y.1
Park, J.2
-
12
-
-
4944236911
-
-
Kapanoglu, M. and Miller, W.A. (2004) 'An evolutionary algorithm-based decision support system for managing flexible manufacturing', Robotics and Computer-Integrated Manufacturing, 20, No. 6, Spec. Iss.,pp.529-539.
-
Kapanoglu, M. and Miller, W.A. (2004) 'An evolutionary algorithm-based decision support system for managing flexible manufacturing', Robotics and Computer-Integrated Manufacturing, Vol. 20, No. 6, Spec. Iss.,pp.529-539.
-
-
-
-
13
-
-
0031073978
-
Fuzzy integrated decision-making support system for scheduling of FMS using simulation
-
Kazerooni, A., Chan F.T.S. and Abhary K. (1997) 'Fuzzy integrated decision-making support system for scheduling of FMS using simulation', Computer Integrated Manufacturing Systems, Vol. 10, No. 1, pp.27-34.
-
(1997)
Computer Integrated Manufacturing Systems
, vol.10
, Issue.1
, pp. 27-34
-
-
Kazerooni, A.1
Chan, F.T.S.2
Abhary, K.3
-
14
-
-
1242332512
-
An intelligent fuzzy agent for meeting scheduling decision support system
-
Lee, C.S. and Pan, C-Y. (2004) 'An intelligent fuzzy agent for meeting scheduling decision support system', Fuzzy Sets and Systems, Vol. 142, No. 3, pp.467-488.
-
(2004)
Fuzzy Sets and Systems
, vol.142
, Issue.3
, pp. 467-488
-
-
Lee, C.S.1
Pan, C.-Y.2
-
15
-
-
0025416939
-
Analsis of scheduling rules for an FMS
-
Montazeri, M. and Wassenhove, L.N. (1990) 'Analsis of scheduling rules for an FMS', International Journal of Production Research, Vol. 28, No. 4, pp.785-802.
-
(1990)
International Journal of Production Research
, vol.28
, Issue.4
, pp. 785-802
-
-
Montazeri, M.1
Wassenhove, L.N.2
-
16
-
-
0037621969
-
A knowledge-based decision support system for the management of parts and tools in FMS
-
Ozbayrak, M. and Bell, R. (2003) 'A knowledge-based decision support system for the management of parts and tools in FMS', Decision Support Systems, Vol. 35, No. 4, pp.487-515.
-
(2003)
Decision Support Systems
, vol.35
, Issue.4
, pp. 487-515
-
-
Ozbayrak, M.1
Bell, R.2
-
17
-
-
0027699991
-
Efficient dynamic dispatching rule for scheduling in a job shop
-
Raghu, T.S. and Rajendran, C. (1993) 'Efficient dynamic dispatching rule for scheduling in a job shop', International Journal of Production Economics, Vol. 32, No. 3, pp.301-313.
-
(1993)
International Journal of Production Economics
, vol.32
, Issue.3
, pp. 301-313
-
-
Raghu, T.S.1
Rajendran, C.2
-
18
-
-
0032649737
-
A comparative study of dispatching rules in dynamic flow shops and job shops
-
Rajendran, C. and Holthaus, O. (1999) 'A comparative study of dispatching rules in dynamic flow shops and job shops', European Journal of Operational Research, Vol. 116, No. 1, pp. 156-170.
-
(1999)
European Journal of Operational Research
, vol.116
, Issue.1
, pp. 156-170
-
-
Rajendran, C.1
Holthaus, O.2
-
19
-
-
0028485248
-
An active intelligent decision support system
-
Rao, H.R., Sridhar, R. and Narain, S. (1994) 'An active intelligent decision support system', Decision Support Systems, Vol. 12, No. 1,pp.79-91.
-
(1994)
Decision Support Systems
, vol.12
, Issue.1
, pp. 79-91
-
-
Rao, H.R.1
Sridhar, R.2
Narain, S.3
-
20
-
-
0033357382
-
Job shop scheduling with beam search
-
Sabuncuoglu, I. and Bayiz, M. (1999) 'Job shop scheduling with beam search', European Journal of Operational Research, Vol. 118,No.2,pp.390-412.
-
(1999)
European Journal of Operational Research
, vol.118
, Issue.2
, pp. 390-412
-
-
Sabuncuoglu, I.1
Bayiz, M.2
-
21
-
-
0024673709
-
Some solution methodologies for loading problems in a flexible manufacturing system
-
Shanker, K. and Srinivasulu, A. (1989) 'Some solution methodologies for loading problems in a flexible manufacturing system', International Journal of Production Research, Vol. 27, No. 6, pp. 1010-1034.
-
(1989)
International Journal of Production Research
, vol.27
, Issue.6
, pp. 1010-1034
-
-
Shanker, K.1
Srinivasulu, A.2
-
22
-
-
4344584596
-
Multi-criteria dynamic scheduling methodology for controlling a flexible manufacturing system
-
Shnits, B., Rubinovitz, J. and Sinreich, D. (2004) 'Multi-criteria dynamic scheduling methodology for controlling a flexible manufacturing system', International Journal of Production Research, Vol. 42, No. 17, pp.3457-3472.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.17
, pp. 3457-3472
-
-
Shnits, B.1
Rubinovitz, J.2
Sinreich, D.3
-
23
-
-
0034800102
-
An intelligent decision support system for part launching in a flexible manufacturing system
-
Shukla, C.S. and Chen, F.F. (2001) 'An intelligent decision support system for part launching in a flexible manufacturing system', International Journal of Advanced Manufacturing Technology, Vol. 18, No. 6, pp.422-433.
-
(2001)
International Journal of Advanced Manufacturing Technology
, vol.18
, Issue.6
, pp. 422-433
-
-
Shukla, C.S.1
Chen, F.F.2
-
24
-
-
0006367415
-
Intelligent agents as a basis for decision support systems
-
Whinston, A. (1997) 'Intelligent agents as a basis for decision support systems', Decision Support Systems, Vol. 20, No. 1, pp.35-51.
-
(1997)
Decision Support Systems
, vol.20
, Issue.1
, pp. 35-51
-
-
Whinston, A.1
-
25
-
-
0142154202
-
The application of adaptive genetic algorithms in FMS dynamic rescheduling
-
Yang, H. and Wu, Z. (2003) 'The application of adaptive genetic algorithms in FMS dynamic rescheduling', Int. J. Computer Integrated Manufacturing, Vol. 16, No. 6, pp.382-397.
-
(2003)
Int. J. Computer Integrated Manufacturing
, vol.16
, Issue.6
, pp. 382-397
-
-
Yang, H.1
Wu, Z.2
-
26
-
-
0028408210
-
A comparison of job shop dispatching rules using a total cost criterion
-
Yang, K.K. and Sum, C.C. (1994) 'A comparison of job shop dispatching rules using a total cost criterion', International Journal of Production Research, Vol. 32, No. 4, pp.807-820.
-
(1994)
International Journal of Production Research
, vol.32
, Issue.4
, pp. 807-820
-
-
Yang, K.K.1
Sum, C.C.2
-
27
-
-
0036767274
-
Beam search-based algorithm for flexible manufacturing system scheduling
-
Zhou, B.H., Zhou, X.J. and Cai, J.G. (2002) 'Beam search-based algorithm for flexible manufacturing system scheduling', Journal of Dong Hua University, Vol. 19, No. 3, pp. 13-18.
-
(2002)
Journal of Dong Hua University
, vol.19
, Issue.3
, pp. 13-18
-
-
Zhou, B.H.1
Zhou, X.J.2
Cai, J.G.3
|