Lower bounds for resource-constrained project scheduling problems
-
EJORDT 0377-2217,. 10.1016/S0377-2217(02)00762-2
-
Brucker, P., and Knust, S. (2003). " Lower bounds for resource-constrained project scheduling problems." Eur. J. Oper. Res. EJORDT 0377-2217, 149, 302-313. 10.1016/S0377-2217(02)00762-2
-
(2003)
Eur. J. Oper. Res.
, vol.149
, pp. 302-313
-
-
Brucker, P.1
Knust, S.2
-
3
-
-
0032096810
-
A branch and bound algorithm for the resource-constrained project scheduling problem
-
EJORDT 0377-2217,. 10.1016/S0377-2217(97)00335-4
-
Brucker, P., Knust, S., Schoo, A., and Thiele, O. (1998). " A branch and bound algorithm for the resource-constrained project scheduling problem." Eur. J. Oper. Res. EJORDT 0377-2217, 107, 272-288. 10.1016/S0377-2217(97)00335-4
-
(1998)
Eur. J. Oper. Res.
, vol.107
, pp. 272-288
-
-
Brucker, P.1
Knust, S.2
Schoo, A.3
Thiele, O.4
-
4
-
-
0042613489
-
Advances in critical path methods
-
OPREAI 0030-364X,. 10.1057/jors.1966.72
-
Carruthers, J. A., and Battersby, A. (1966). " Advances in critical path methods." Oper. Res. OPREAI 0030-364X, 17, 359-380. 10.1057/jors.1966.72
-
(1966)
Oper. Res.
, vol.17
, pp. 359-380
-
-
Carruthers, J.A.1
Battersby, A.2
-
5
-
-
12344292733
-
Long-term entropy and profitability change of United States public construction firms
-
DOI 10.1061/(ASCE)0742-597X(2005)21:1(17)
-
Choi, J., and Russell, J. S. (2005). " Long-term entropy and profitability change of United States public construction firms." J. Manage. Eng. JMENEA 0742-597X, 21 (1), 17-26. 10.1061/(ASCE)0742-597X(2005)21: 1(17) (Pubitemid 40135187)
-
(2005)
Journal of Management in Engineering
, vol.21
, Issue.1
, pp. 17-26
-
-
Choi, J.1
Russell, J.S.2
-
7
-
-
58949095140
-
Resource-constrained scheduling using ant colony optimization
-
Civil-ComPress, St. Julian's, Malta
-
Christodoulou, S. (2007). " Resource-constrained scheduling using ant colony optimization." Proc., 9th Int. Conf. on the Application of Artificial Intelligence to Civil, Structural and Environmental Engineering (AICC07), Civil-Comp Press, St. Julian's, Malta.
-
(2007)
Proc., 9th Int. Conf. on the Application of Artificial Intelligence to Civil, Structural and Environmental Engineering (AICC07)
-
-
Christodoulou, S.1
-
8
-
-
57749105712
-
A bid-unbalancing method for lowering a contractor's financial risk
-
CMECF3 0144-6193. 10.1080/01446190802596238
-
Christodoulou, S. (2008). " A bid-unbalancing method for lowering a contractor's financial risk." Constr. Manage. Econom. CMECF3 0144-6193, 26 (12), 1291-1302. 10.1080/01446190802596238
-
(2008)
Constr. Manage. Econom.
, vol.26
, Issue.12
, pp. 1291-1302
-
-
Christodoulou, S.1
-
9
-
-
67650306188
-
Disorder considerations in resource-constrained scheduling
-
CMECF3 0144-6193. 10.1080/01446190802635416
-
Christodoulou, S., Ellinas, G., and Aslani, P. (2009). " Disorder considerations in resource-constrained scheduling." Constr. Manage. Econom. CMECF3 0144-6193, 27 (3), 229-240. 10.1080/01446190802635416
-
(2009)
Constr. Manage. Econom.
, vol.27
, Issue.3
, pp. 229-240
-
-
Christodoulou, S.1
Ellinas, G.2
Aslani, P.3
-
10
-
-
84955240346
-
Resource constrained project scheduling: A hybrid neural approach
-
J. Józefowska, and J. Weglarz, eds., Springer
-
Colak, S., Agarwal, A., and Erenguc, S. (2006). " Resource constrained project scheduling: A hybrid neural approach." Perspectives in modern project scheduling, J. Józefowska, and, J. Weglarz, eds., Springer, 297-318.
-
(2006)
Perspectives in modern project scheduling
, pp. 297-318
-
-
Colak, S.1
Agarwal, A.2
Erenguc, S.3
-
11
-
-
0003352726
-
An approach to resource constrained project scheduling
-
Association for the Advancement of Artificial Intelligence (AAAI), Calif
-
Crawford, J. (1996). " An approach to resource constrained project scheduling." Proc., 1996 AI and Manufacturing Research Planning Workshop, Association for the Advancement of Artificial Intelligence (AAAI), Calif.
-
(1996)
Proc., 1996 AI and Manufacturing Research Planning Workshop
-
-
Crawford, J.1
-
12
-
-
0002907360
-
A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
-
MSCIAM 0025-1909,. 10.1287/mnsc.38.12.1803
-
Demeulemeester, E., and Herroelen, W. (1992). " A branch-and-bound procedure for the multiple resource-constrained project scheduling problem." Manage. Sci. MSCIAM 0025-1909, 38, 1803-1818. 10.1287/mnsc.38.12.1803
-
(1992)
Manage. Sci.
, vol.38
, pp. 1803-1818
-
-
Demeulemeester, E.1
Herroelen, W.2
-
13
-
-
0031272722
-
New benchmark results for the resource-constrained project scheduling problem
-
MSCIAM 0025-1909,. 10.1287/mnsc.43.11.1485
-
Demeulemeester, E. L., and Herroelen, W. S. (1997). " New benchmark results for the resource-constrained project scheduling problem." Manage. Sci. MSCIAM 0025-1909, 43, 1485-1492. 10.1287/mnsc.43.11.1485
-
(1997)
Manage. Sci.
, vol.43
, pp. 1485-1492
-
-
Demeulemeester, E.L.1
Herroelen, W.S.2
-
14
-
-
0001491336
-
Resource constrained scheduling as generalized bin packing
-
10.1016/0097-3165(76)90001-7 0097-3165
-
Garey, M. R., Graham, R. L., Johnson, D. S., and Yao, A. C. C. (1976). " Resource constrained scheduling as generalized bin packing." J. Comb. Theory Ser. A, 21, 257-298. 10.1016/0097-3165(76)90001-7 0097-3165
-
(1976)
J. Comb. Theory Ser. A
, vol.21
, pp. 257-298
-
-
Garey, M.R.1
Graham, R.L.2
Johnson, D.S.3
Yao, A.C.C.4
-
16
-
-
0025444361
-
Packing method for resource leveling (pack)
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1990)116:2(331)
-
Harris, R. B. (1990). " Packing method for resource leveling (pack)." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (2), 331-350. 10.1061/(ASCE)0733-9364(1990)116:2(331)
-
(1990)
J. Constr. Eng. Manage.
, vol.116
, Issue.2
, pp. 331-350
-
-
Harris, R.B.1
-
17
-
-
0032642926
-
Optimization of resource allocation and leveling using genetic algorithms
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
Hegazy, T. (1999). " Optimization of resource allocation and leveling using genetic algorithms." J. Constr. Eng. Manage. JCEMD4 0733-9364, 125 (3), 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.3
, pp. 167-175
-
-
Hegazy, T.1
-
19
-
-
0034227663
-
Modification of minimum moment approach in resource leveling
-
JCEMD4 0733-9364. 10.1061/(ASCE)0733-9364(2000)126:4(278)
-
Hiyassat, M. A. S. (2000). " Modification of minimum moment approach in resource leveling." J. Constr. Eng. Manage. JCEMD4 0733-9364, 126 (4), 278-284. 10.1061/(ASCE)0733-9364(2000)126:4(278)
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.4
, pp. 278-284
-
-
Hiyassat, M.A.S.1
-
20
-
-
0035335134
-
Applying modified minimum moment method to multiple resource leveling
-
DOI 10.1061/(ASCE)0733-9364(2001)127:3(192), Reportnr 22212
-
Hiyassat, M. A. S. (2001). " Applying modified minimum moment method to multiple resource leveling." J. Constr. Eng. Manage. JCEMD4 0733-9364, 127 (3), 192-198. 10.1061/(ASCE)0733-9364(2001)127:3(192) (Pubitemid 32508537)
-
(2001)
Journal of Construction Engineering and Management
, vol.127
, Issue.3
, pp. 192-198
-
-
Hiyassat, M.A.S.1
-
21
-
-
0021408930
-
Is equilibrium always an entropy maximum?
-
JSTPBS 0022-4715,. 10.1007/BF01017372
-
Landsberg, P. (1984). " Is equilibrium always an entropy maximum? " J. Stat. Phys. JSTPBS 0022-4715, 35, 159-169. 10.1007/BF01017372
-
(1984)
J. Stat. Phys.
, vol.35
, pp. 159-169
-
-
Landsberg, P.1
-
22
-
-
28444479514
-
Optimization of resource allocation in construction using genetic algorithms
-
Vol., IEEE, Guangzhou, China
-
Liu, Y., Zhao, S. -L., Du, X. -K., and Li, S. -Q. (2005). " Optimization of resource allocation in construction using genetic algorithms." Proc., 2005 Int. Conf. on Machine Learning and Cybernetics, Vol. 6, IEEE, Guangzhou, China, 3428-3432.
-
(2005)
Proc., 2005 Int. Conf. on Machine Learning and Cybernetics
, vol.6
, pp. 3428-3432
-
-
Liu, Y.1
Zhao, S.-L.2
Du, X.-K.3
Li, S.-Q.4
-
23
-
-
0027308352
-
Resource leveling based on the modified minimum moment heuristic
-
ASCE, New York
-
Martinez, J., and Ioannou, P. (1993). " Resource leveling based on the modified minimum moment heuristic." Computing in civil and building engineering, ASCE, New York, 287-294.
-
(1993)
Computing in civil and building engineering
, pp. 287-294
-
-
Martinez, J.1
Ioannou, P.2
-
24
-
-
77951286233
-
CPMlevel, resource leveling using the generalized minimum moment algorithm
-
Univ. of Michigan
-
Martinez, J. C., and Ioannou, P. G. (1992). " CPMlevel, resource leveling using the generalized minimum moment algorithm." User's guide, Univ. of Michigan.
-
(1992)
User's guide
-
-
Martinez, J.C.1
Ioannou, P.G.2
-
25
-
-
77951278786
-
-
Microsoft project electronic manual, v2000 edition. Microsoft, Redmond, Wash
-
Microsoft project electronic manual, v2000 edition. (2000). Microsoft, Redmond, Wash.
-
(2000)
-
-
-
26
-
-
0032070635
-
An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
-
MSCIAM 0025-1909,. 10.1287/mnsc.44.5.714
-
Mingozzi, A., Maniezzo, V., Ricciardelli, S., and Bianco, L. (1998). " An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation." Manage. Sci. MSCIAM 0025-1909, 44, 714-729. 10.1287/mnsc.44.5.714
-
(1998)
Manage. Sci.
, vol.44
, pp. 714-729
-
-
Mingozzi, A.1
Maniezzo, V.2
Ricciardelli, S.3
Bianco, L.4
-
27
-
-
0021460636
-
A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
-
MSCIAM 0025-1909,. 10.1287/mnsc.30.7.854
-
Patterson, J. H. (1984). " A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem." Manage. Sci. MSCIAM 0025-1909, 30, 854-867. 10.1287/mnsc.30.7.854
-
(1984)
Manage. Sci.
, vol.30
, pp. 854-867
-
-
Patterson, J.H.1
-
28
-
-
77951260126
-
-
Primavera Project Planner electronic manual; v3.1 edition. Primavera Systems Inc., Bala Cynwyd, Pa
-
Primavera Project Planner electronic manual; v3.1 edition. (2001). Primavera Systems Inc., Bala Cynwyd, Pa.
-
(2001)
-
-
-
29
-
-
7544238250
-
Project time-cost analysis under generalised precedence relations
-
10.1016/j.advengsoft.2004.03.017 0965-9978
-
Sakellaropoulos, S., and Chassiakos, A. P. (2004). " Project time-cost analysis under generalised precedence relations." Adv. Eng. Softw., 35, 715-724. 10.1016/j.advengsoft.2004.03.017 0965-9978
-
(2004)
Adv. Eng. Softw.
, vol.35
, pp. 715-724
-
-
Sakellaropoulos, S.1
Chassiakos, A.P.2
-
30
-
-
13944251756
-
Use of genetic algorithms in resource scheduling of construction projects
-
DOI 10.1061/(ASCE)0733-9364(2004)130:6(869)
-
Senouci, A. B., and Eldin, N. N. (2004). " Use of genetic algorithms in resource scheduling of construction projects." J. Constr. Eng. Manage. JCEMD4 0733-9364, 130 (6), 869-877. 10.1061/(ASCE)0733-9364(2004)130:6(869) (Pubitemid 40265320)
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.6
, pp. 869-877
-
-
Senouci, A.B.1
Eldin, N.N.2
-
31
-
-
0003982378
-
-
4th Ed., Thomson-Brooks/Cole, Pacific Grove, Calif
-
Winston, W. L., and Venkataramanan, M. (2002). Introduction to mathematical programming, 4th Ed., Thomson-Brooks/Cole, Pacific Grove, Calif.
-
(2002)
Introduction to mathematical programming
-
-
Winston, W.L.1
Venkataramanan, M.2
|