메뉴 건너뛰기




Volumn 26, Issue 12, 2008, Pages 1291-1302

A bid-unbalancing method for lowering a contractor's financial risk

Author keywords

Bid unbalancing; Cash flow optimization; Entropy; Project profitability

Indexed keywords

CONTRACTORS; CONTRACTS; FINANCE; OPTIMIZATION;

EID: 57749105712     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190802596238     Document Type: Article
Times cited : (30)

References (28)
  • 3
    • 57749083006 scopus 로고    scopus 로고
    • Dynamic resource-constrained scheduling
    • PhD thesis.Polytechnic University, Brooklyn, NY
    • Aslani, P. (2007) Dynamic resource-constrained scheduling, PhD thesis.Polytechnic University, Brooklyn, NY
    • (2007)
    • Aslani, P.1
  • 4
    • 0038183863 scopus 로고    scopus 로고
    • Lower bounds for resource-constrained project scheduling problems
    • Brucker, P. and Knust, S. (2003) Lower bounds for resource-constrained project scheduling problems. European Journal of Operational Research, 149, pp. 302-313.
    • (2003) European Journal of Operational Research , vol.149 , pp. 302-313
    • Brucker, P.1    Knust, S.2
  • 5
    • 0032096810 scopus 로고    scopus 로고
    • A branch and bound algorithm for the resource-constrained project scheduling problem
    • Brucker, P., Knust, S., Schoo, A. and Thiele, O. (1998) A branch and bound algorithm for the resource-constrained project scheduling problem. European Journal of Operational Research, 107, pp. 272-288.
    • (1998) European Journal of Operational Research , vol.107 , pp. 272-288
    • Brucker, P.1    Knust, S.2    Schoo, A.3    Thiele, O.4
  • 8
    • 12344292733 scopus 로고    scopus 로고
    • Long-term entropy and profitability change of United States public construction firms
    • Choi, J. and Russell, J. S. (2005) Long-term entropy and profitability change of United States public construction firms. Journal of Management in Engineering, 21, pp. 17-26.
    • (2005) Journal of Management in Engineering , vol.21 , pp. 17-26
    • Choi, J.1    Russell, J.S.2
  • 9
    • 57749110277 scopus 로고    scopus 로고
    • Ant colony optimization in construction scheduling
    • Christodoulou, S. (2005) Ant colony optimization in construction scheduling.
    • (2005)
    • Christodoulou, S.1
  • 10
    • 58949095140 scopus 로고    scopus 로고
    • Resource-constrained scheduling using ant colony optimization
    • Christodoulou, S. (2007) Resource-constrained scheduling using ant colony optimization.
    • (2007)
    • Christodoulou, S.1
  • 11
    • 84955240346 scopus 로고    scopus 로고
    • Resource constrained project scheduling: A hybrid neural approach
    • Springer, USA
    • Colak, S., Agarwal, A. and Erenguc, S. (2006) Resource constrained project scheduling: A hybrid neural approach. Perspectives in Modern Project Scheduling, 92, pp. 297-318. Springer, USA
    • (2006) Perspectives in Modern Project Scheduling , vol.92 , pp. 297-318
    • Colak, S.1    Agarwal, A.2    Erenguc, S.3
  • 13
    • 0002907360 scopus 로고
    • A branch-and-bound procedure for the multiple resource-constrained project scheduling problem
    • Demeulemeester, E. and Herroelen, W. (1992) A branch-and-bound procedure for the multiple resource-constrained project scheduling problem. Management Science, 38, pp. 1803-1818.
    • (1992) Management Science , vol.38 , pp. 1803-1818
    • Demeulemeester, E.1    Herroelen, W.2
  • 14
    • 0031272722 scopus 로고    scopus 로고
    • New benchmark results for the resource-constrained project scheduling problem
    • Demeulemeester, E. L. and Herroelen, W. S. (1997) New benchmark results for the resource-constrained project scheduling problem. Management Science, 43, pp. 1485-1492.
    • (1997) Management Science , vol.43 , pp. 1485-1492
    • Demeulemeester, E.L.1    Herroelen, W.S.2
  • 15
    • 0001748017 scopus 로고
    • A competitive bidding strategy
    • Friedman, L. (1956) A competitive bidding strategy. Operations Research, 4, pp. 104-112.
    • (1956) Operations Research , vol.4 , pp. 104-112
    • Friedman, L.1
  • 16
  • 17
    • 0032642926 scopus 로고    scopus 로고
    • Optimization of resource allocation and leveling using genetic algorithms
    • Hegazy, T. (1999) Optimization of resource allocation and leveling using genetic algorithms. ASCE Journal of Construction Engineering and Management, 125, pp. 167-175.
    • (1999) ASCE Journal of Construction Engineering and Management , vol.125 , pp. 167-175
    • Hegazy, T.1
  • 21
    • 0032070635 scopus 로고    scopus 로고
    • An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation
    • Mingozzi, A., Maniezzo, V., Ricciardelli, S. and Bianco, L. (1998) An exact algorithm for the resource-constrained project scheduling problem based on a new mathematical formulation. Management Science, 44, pp. 714-729.
    • (1998) Management Science , vol.44 , pp. 714-729
    • Mingozzi, A.1    Maniezzo, V.2    Ricciardelli, S.3    Bianco, L.4
  • 22
    • 0021460636 scopus 로고
    • A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem
    • Patterson, J. H. (1984) A comparison of exact approaches for solving the multiple constrained resource, project scheduling problem. Management Science, 30, pp. 854-867.
    • (1984) Management Science , vol.30 , pp. 854-867
    • Patterson, J.H.1
  • 24
    • 7544238250 scopus 로고    scopus 로고
    • Project time-cost analysis under generalised precedence relations
    • Sakellaropoulos, S. and Chassiakos, A. P. (2004) Project time-cost analysis under generalised precedence relations. Advances in Engineering Software, 35, pp. 715-724.
    • (2004) Advances in Engineering Software , vol.35 , pp. 715-724
    • Sakellaropoulos, S.1    Chassiakos, A.P.2
  • 25
    • 13944251756 scopus 로고    scopus 로고
    • Use of genetic algorithms in resource scheduling of construction projects
    • Senouci, A. B. and Eldin, N. N. (2004) Use of genetic algorithms in resource scheduling of construction projects. Journal of Construction Engineering and Management, 130, pp. 869-877.
    • (2004) Journal of Construction Engineering and Management , vol.130 , pp. 869-877
    • Senouci, A.B.1    Eldin, N.N.2
  • 27
    • 0343596633 scopus 로고
    • Unbalanced bidding on contracts with variation trends in client-provided quantities
    • Tong, Y. and Lu, Y. (1992) Unbalanced bidding on contracts with variation trends in client-provided quantities. Journal of Construction Management and Economics, 10, pp. 69-80.
    • (1992) Journal of Construction Management and Economics , vol.10 , pp. 69-80
    • Tong, Y.1    Lu, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.