Network decomposition-based benchmark results for the discrete time-cost tradeoff problem
-
doi:10.1016/j.ejor.2004.04.006
-
Akkan, C.; Drexl, A. and Kimms, A. 2005. Network decomposition-based benchmark results for the discrete time-cost tradeoff problem, European Journal of Operational Research 165: 339-358. doi:10.1016/j.ejor.2004.04.006.
-
(2005)
European Journal of Operational Research
, vol.165
, pp. 339-358
-
-
Akkan, C.1
Drexl, A.2
Kimms, A.3
-
2
-
-
0016544914
-
Analysis of activity network under uncertainty
-
Ang, A. 1975. Analysis of activity network under uncertainty, Journal of Engineering Mechanics 101: 373-387.
-
(1975)
Journal of Engineering Mechanics
, vol.101
, pp. 373-387
-
-
Ang, A.1
-
3
-
-
0002146440
-
The use of fuzzy variables in PERT
-
doi:10.1016/0165-0114(81)90030-0
-
Chanas, S. and Kamburowski, J. 1981. The use of fuzzy variables in PERT, Fuzzy Sets and Systems 5: 11-19. doi:10.1016/0165-0114(81)90030-0.
-
(1981)
Fuzzy Sets and Systems
, vol.5
, pp. 11-19
-
-
Chanas, S.1
Kamburowski, J.2
-
4
-
-
49349096163
-
Integration of cost and schedule using extensive matrix method and spreadsheets
-
doi:10.1016/j.autcon.2008.04.009
-
Chen, P.-H. 2008. Integration of cost and schedule using extensive matrix method and spreadsheets, Automation in Construction 18: 32-41. doi:10.1016/j.autcon.2008.04.009
-
(2008)
Automation in Construction
, vol.18
, pp. 32-41
-
-
Chen, P.-H.1
-
5
-
-
0004374576
-
A time-cost trade-off model with resource consideration using genetic algorithm
-
doi:10.1080/026302597 08970224
-
Chua, D. K. H.; Chan, W. T., and Govindan, K. 1997. A time-cost trade-off model with resource consideration using genetic algorithm, Civil Engineering Systems 14: 291-311. doi:10.1080/026302597 08970224.
-
(1997)
Civil Engineering Systems
, vol.14
, pp. 291-311
-
-
Chua, D.K.H.1
Chan, W.T.2
Govindan, K.3
-
7
-
-
0031185451
-
Using genetic algorithms to solve construction time-cost trade-off problems
-
Feng, C. W.; Liu, L., and Burns, S. A. 1997. Using genetic algorithms to solve construction time-cost trade-off problems, Journal of Computing in Civil Engineering 11: 184-189.
-
(1997)
Journal of Computing in Civil Engineering
, vol.11
, pp. 184-189
-
-
Feng, C.W.1
Liu, L.2
Burns, S.A.3
-
8
-
-
0000181338
-
A network flow computation for project cost curves
-
doi:10.1287/mnsc.7.2.167
-
Fulkerson, D. R. 1961. A network flow computation for project cost curves, Management Science 7: 167-178. doi:10.1287/mnsc.7.2.167.
-
(1961)
Management Science
, vol.7
, pp. 167-178
-
-
Fulkerson, D.R.1
-
9
-
-
0003926816
-
Critical Chain
-
The North River Press, Great Barrington
-
Goldratt, E. 1997. Critical Chain. The North River Press, Great Barrington.
-
(1997)
-
-
Goldratt, E.1
-
11
-
-
0030286425
-
Fuzzy priority heuristics for project scheduling
-
doi:10.1016/0165-0114(95)00338-X
-
Hapke, M. and Słowiński, R. 1996. Fuzzy priority heuristics for project scheduling, Fuzzy Sets and Systems 8: 291-299. doi:10.1016/0165-0114(95)00338-X.
-
(1996)
Fuzzy Sets and Systems
, vol.8
, pp. 291-299
-
-
Hapke, M.1
Słowiński, R.2
-
12
-
-
0005764899
-
An implicit enumeration algorithm for the time/cost tradeoff problem in project network analysis
-
Harvey, R. T., and Patterson, J. H. 1979. An implicit enumeration algorithm for the time/cost tradeoff problem in project network analysis, Foundations of Control Engineering 4: 107-117.
-
(1979)
Foundations of Control Engineering
, vol.4
, pp. 107-117
-
-
Harvey, R.T.1
Patterson, J.H.2
-
13
-
-
0018444440
-
A dynamic programming algorithm for decision CPM networks
-
doi:10.1287/opre.27.2.225
-
Hindelang, T. J., and Muth, J. F. 1979. A dynamic programming algorithm for decision CPM networks, Operations Research 27: 225-241. doi:10.1287/opre.27.2.225.
-
(1979)
Operations Research
, vol.27
, pp. 225-241
-
-
Hindelang, T.J.1
Muth, J.F.2
-
14
-
-
84959802665
-
Stochastic dominance rules for multiattribute utility functions
-
doi:10.2307/2297262
-
Huang, C. C.; Kira, D. and Vertinsky, I. 1978. Stochastic dominance rules for multiattribute utility functions, Review of Economic Studies 41: 611-616. doi:10.2307/2297262.
-
(1978)
Review of Economic Studies
, vol.41
, pp. 611-616
-
-
Huang, C.C.1
Kira, D.2
Vertinsky, I.3
-
16
-
-
0001620447
-
Critical-path planning and scheduling: Mathematical basis
-
doi:10.1287/opre.9.3.296
-
Kelley, J. E. 1961. Critical-path planning and scheduling: Mathematical basis, Operations Research 9: 296-320. doi:10.1287/opre.9.3.296.
-
(1961)
Operations Research
, vol.9
, pp. 296-320
-
-
Kelley, J.E.1
-
17
-
-
0035193271
-
A GA-based fuzzy optimal model for construction time-cost trade-off
-
doi:10.1016/S0263-7863(99)00035-6
-
Leu, S.-S.; Chen, A.-T., and Yang, Ch.-H. 2001. A GA-based fuzzy optimal model for construction time-cost trade-off, International Journal of Project Management 19: 47-58. doi:10.1016/S0263-7863(99)00035-6.
-
(2001)
International Journal of Project Management
, vol.19
, pp. 47-58
-
-
Leu, S.-S.1
Chen, A.-T.2
Yang, C.-H.3
-
18
-
-
0027545671
-
Schedule compression using the direct stiffness method
-
Moselhi, O. 1993. Schedule compression using the direct stiffness method, Canadian Journal of Civil Engineering 20: 65-72.
-
(1993)
Canadian Journal of Civil Engineering
, vol.20
, pp. 65-72
-
-
Moselhi, O.1
-
19
-
-
0002156761
-
Project selection considering risk
-
doi:10.1080/01446199300000063
-
Moselhi, O. and Deb, B. 1993. Project selection considering risk, Construction Management and Economics 11: 45-52. doi:10.1080/01446199300000063.
-
(1993)
Construction Management and Economics
, vol.11
, pp. 45-52
-
-
Moselhi, O.1
Deb, B.2
-
20
-
-
25444432301
-
Investment projects evaluation by simulation and multiple criteria decision aiding procedure
-
Nowak, M. 2005. Investment projects evaluation by simulation and multiple criteria decision aiding procedure, Journal of Civil Engineering and Management 11: 193-202.
-
(2005)
Journal of Civil Engineering and Management
, vol.11
, pp. 193-202
-
-
Nowak, M.1
-
21
-
-
33748920682
-
INSDECM - an interactive procedure for stochastic multicriteria decision problems
-
doi:10.1016/j.ejor.2005.02.016
-
Nowak, M. 2006. INSDECM - an interactive procedure for stochastic multicriteria decision problems, European Journal of Operational Research 175: 1413-1430. doi:10.1016/j.ejor.2005.02.016.
-
(2006)
European Journal of Operational Research
, vol.175
, pp. 1413-1430
-
-
Nowak, M.1
-
22
-
-
0345634198
-
From stochastic dominance to mean-risk models: Semideviations as risk measures
-
doi:10.1016/S0377-2217(98)00167-2
-
Ogryczak, W., and Ruszczyński, A. 1999. From stochastic dominance to mean-risk models: Semideviations as risk measures, European Journal of Operational Research 116: 33-50. doi:10.1016/S0377-2217(98)00167-2.
-
(1999)
European Journal of Operational Research
, vol.116
, pp. 33-50
-
-
Ogryczak, W.1
Ruszczyński, A.2
-
23
-
-
0000508739
-
On consistency of stochastic dominance and mean-semideviation models
-
doi:10.1007/PL00011396
-
Ogryczak, W., and Ruszczyński, A. 2001. On consistency of stochastic dominance and mean-semideviation models, Mathematical Programming 89: 217-232. doi:10.1007/PL00011396.
-
(2001)
Mathematical Programming
, vol.89
, pp. 217-232
-
-
Ogryczak, W.1
Ruszczyński, A.2
-
24
-
-
19244376018
-
A simple CPM time-cost trade-off algorithm
-
doi:10.1287/mnsc.17.6.B354
-
Siemens, N. 1971. A simple CPM time-cost trade-off algorithm, Management Science 17: 354-363. doi:10.1287/mnsc.17.6.B354.
-
(1971)
Management Science
, vol.17
, pp. 354-363
-
-
Siemens, N.1
-
25
-
-
0032208139
-
Approximation algorithms for the discrete time-cost tradeoff problem
-
doi:10.1287/moor.23.4.909
-
Skutella, M. 1998. Approximation algorithms for the discrete time-cost tradeoff problem, Mathematics of Operations Research 23: 195-203. doi:10.1287/moor.23.4.909.
-
(1998)
Mathematics of Operations Research
, vol.23
, pp. 195-203
-
-
Skutella, M.1
-
26
-
-
14544267876
-
A fuzzy stochastic technique for project selection
-
doi:10.1080/01446190050024824
-
Wong, E. T. T.; Norman, G., and Flanagan, R. 2000. A fuzzy stochastic technique for project selection, Construction Management and Economics 18: 407-414. doi:10.1080/01446190050024824.
-
(2000)
Construction Management and Economics
, vol.18
, pp. 407-414
-
-
Wong, E.T.T.1
Norman, G.2
Flanagan, R.3
-
27
-
-
0342357044
-
Multiattribute analysis based on stochastic dominance
-
Munier, B. and Machina, M. J. (Eds.). Kluwer Academic Publishers, Dordrecht
-
Zaras, K. and Martel, J. M. 1994. Multiattribute analysis based on stochastic dominance, in Munier, B. and Machina, M. J. (Eds.). Models and Experiments in Risk and Rationality. Kluwer Academic Publishers, Dordrecht, 225-248.
-
(1994)
Models and Experiments in Risk and Rationality
, pp. 225-248
-
-
Zaras, K.1
Martel, J.M.2
|