메뉴 건너뛰기




Volumn 4, Issue , 1999, Pages 37-52

A modularised integrated computer environment for the construction industry: Space

Author keywords

Computer Integrated Construction; Integration; Project Model

Indexed keywords

COMPUTER PROGRAMMING; DECISION MAKING; INFORMATION TECHNOLOGY; INTELLIGENT AGENTS; LIFE CYCLE; PRODUCT DESIGN; PROJECT MANAGEMENT; SOFTWARE PROTOTYPING; STRATEGIC PLANNING;

EID: 2142811113     PISSN: 14006529     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Review
Times cited : (17)

References (37)
  • 1
    • 0031223649 scopus 로고    scopus 로고
    • A structured concept for objects life cycle in integrated environments
    • Blackwell, 1997
    • Alshawi M., C.W. Putra and Faraj I. (1997). A structured concept for objects life cycle in integrated environments, Microcomputers in Civil Engineering, Blackwell, Vol. 12, 1997, pp 339-351.
    • (1997) Microcomputers in Civil Engineering , vol.12 , pp. 339-351
    • Alshawi, M.1    Putra, C.W.2    Faraj, I.3
  • 7
    • 0041694822 scopus 로고
    • ICON (Integration of Construction Information): Integrated databases for the design, procurement and management of construction
    • University of Salford, Department of Surveying & Information Technology Institute
    • Aouad G., Betts M., Brandon P., Brown F., Child T., Cooper G., Ford S., Kirkham J., Oxman, R., Sarshar M. and Young B (1994). ICON (Integration of Construction Information): Integrated databases for the design, procurement and management of construction, Final Report, University of Salford, Department of Surveying & Information Technology Institute.
    • (1994) Final Report
    • Aouad, G.1    Betts, M.2    Brandon, P.3    Brown, F.4    Child, T.5    Cooper, G.6    Ford, S.7    Kirkham, J.8    Oxman, R.9    Sarshar, M.10    Young, B.11
  • 8
    • 3442880853 scopus 로고
    • Architecture, methodology and tools for computer integrated large scale engineering - ESPRIT Project 7280
    • General Project Overview
    • ATLAS (1992). Architecture, methodology and tools for computer integrated large scale engineering - ESPRIT Project 7280, Technical Annex Part 1, General Project Overview.
    • (1992) Technical Annex Part 1
  • 10
    • 0024626029 scopus 로고
    • Basic structure of a proposed building product model
    • March
    • Bjork B C (1989). Basic structure of a proposed building product model, Computer Aided Design, vol. 21 number 2, March, pp 71-78.
    • (1989) Computer Aided Design , vol.21 , Issue.2 , pp. 71-78
    • Bjork, B.C.1
  • 11
    • 3042540840 scopus 로고
    • Integrated construction information
    • London
    • Brandon P. and Betts M. (1995). Integrated construction information, E & FN Span, London.
    • (1995) E & FN Span
    • Brandon, P.1    Betts, M.2
  • 12
    • 0043191778 scopus 로고
    • Conceptual modelling approaches in the COMBINE project
    • Dublin
    • Dubois A.M., (1995). Conceptual modelling approaches in the COMBINE project, presented in the COMBINE seminar, Dublin.
    • (1995) COMBINE Seminar
    • Dubois, A.M.1
  • 15
    • 3442900912 scopus 로고    scopus 로고
    • Virtual reality in an integrated construction environment
    • Glasgow, 14-16 August, 1996
    • Faraj I. and Alshawi M. (1996b). Virtual reality in an integrated construction environment, The ITCSED'96 Conference, Glasgow, 14-16 August, 1996.
    • (1996) The ITCSED'96 Conference
    • Faraj, I.1    Alshawi, M.2
  • 17
    • 3442893397 scopus 로고
    • Core process models and application areas in construction
    • Stanford University, California, August
    • Froese T. (1995a). Core process models and application areas in construction, CIB Workshop on Computers and Information in Construction, Stanford University, California, August, pp 427-436.
    • (1995) CIB Workshop on Computers and Information in Construction , pp. 427-436
    • Froese, T.1
  • 18
    • 0029217025 scopus 로고
    • Models of construction process information
    • September
    • nd Congress AEC, September, pp 5-12.
    • (1995) nd Congress AEC , vol.1 , pp. 5-12
    • Froese, T.1
  • 19
    • 84988168725 scopus 로고
    • OPIS: An object model-based project information system
    • Froese T. and Paulson B.C (1994). OPIS: an object model-based project information system, Microcomputers in Civil Engineering, 9(1), pp 13-28.
    • (1994) Microcomputers in Civil Engineering , vol.9 , Issue.1 , pp. 13-28
    • Froese, T.1    Paulson, B.C.2
  • 21
    • 3442889767 scopus 로고    scopus 로고
    • IFC object model, release 2.0
    • IAI Members CD, International Alliance for Interoperability
    • IAI (1999). IFC Object Model, Release 2.0, In: CD-ROM, Industry Foundation Classes Release 2.0 - IAI Members CD, International Alliance for Interoperability.
    • (1999) CD-ROM, Industry Foundation Classes Release 2.0
  • 22
    • 84884708306 scopus 로고    scopus 로고
    • KAPPA-PC, accessed 11 November 1999
    • IntelliCorp (1999). KAPPA-PC, Web Document, http://198.95.16.4/kappa-pc/ ,accessed 11 November 1999.
    • (1999) Web Document
  • 23
    • 3442878805 scopus 로고
    • EXPRESS language reference manual
    • ISO 10303 Part 11, April, 1991
    • ISO (1991). ISO 10303 Part 11, EXPRESS Language Reference Manual, ISO TC184/SC4/WG5, April, 1991.
    • (1991) ISO TC184/SC4/WG5
  • 24
    • 0006444306 scopus 로고
    • ISICAD: Interactive system for integrating CAD and computer-based construction systems
    • Kartam N.A. (1994). ISICAD: Interactive system for integrating CAD and computer-based construction systems, In: Microcomputers in civil engineering, Vol. 9, pp. 41-51.
    • (1994) Microcomputers in Civil Engineering , vol.9 , pp. 41-51
    • Kartam, N.A.1
  • 27
    • 0001582375 scopus 로고
    • Knowledge - Based system for construction planning of high - Rise buildings
    • June
    • Shaked O. and Warszawski A. (1995). Knowledge - based system for construction planning of high - rise buildings, Journal Or Construction Engineering and Management, Vol.121, No. 2, June.
    • (1995) Journal or Construction Engineering and Management , vol.121 , Issue.2
    • Shaked, O.1    Warszawski, A.2
  • 31
    • 3442890697 scopus 로고    scopus 로고
    • Data & process models for project estimating and monthly interim valuation within an integrated construction environment
    • accepted for publication
    • Underwood J. and Alshawi M. (1996). Data & process models for project estimating and monthly interim valuation within an integrated construction environment, Microcomputers in Civil Engineering, accepted for publication.
    • (1996) Microcomputers in Civil Engineering
    • Underwood, J.1    Alshawi, M.2
  • 32
    • 3442886634 scopus 로고    scopus 로고
    • The generation of project estimates and monthly interim valuation certificates within an integrated construction environment
    • July, Queensland, Australia, July, 1997
    • Underwood J. and Alshawi M. (1997a). The generation of project estimates and monthly interim valuation certificates within an integrated construction environment, Proceedings of the International Conference on Construction Process Re-engineering, CPR97, July, Queensland, Australia, July, 1997, pp 635-646.
    • (1997) Proceedings of the International Conference on Construction Process Re-engineering, CPR97 , pp. 635-646
    • Underwood, J.1    Alshawi, M.2
  • 33
    • 3442901476 scopus 로고    scopus 로고
    • An integrated application for forecasting building element maintenance, send for publication
    • July
    • Underwood J. and Alshawi M. (1997b). An integrated application for forecasting building element maintenance, send for publication, The Journal of Civil Engineering Systems, July.
    • (1997) The Journal of Civil Engineering Systems
    • Underwood, J.1    Alshawi, M.2
  • 34
    • 0343349035 scopus 로고
    • Wessex Wessex Electronic Publishing Ltd, Poole, UK
    • Wessex (1991). Wessex SMM7 building price book, Wessex Electronic Publishing Ltd, Poole, UK.
    • (1991) Wessex SMM7 Building Price Book
  • 37
    • 0009270751 scopus 로고
    • An integrated construction planning system using object-oriented product and process modelling
    • September
    • Yamazaki Y. (1995). An integrated construction planning system using object-oriented product and process modelling, Construction Management and Economic, Vol.13, No.5, September, pp 427-434.
    • (1995) Construction Management and Economic , vol.13 , Issue.5 , pp. 427-434
    • Yamazaki, Y.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.