메뉴 건너뛰기




Volumn 4101 LNCS, Issue , 2006, Pages 242-250

Computer-aided modelling, evaluation and management of construction projects according to PLM concept

Author keywords

3D and 4D modelling; Computer aided evaluation and management in construction; Project life cycle management

Indexed keywords

COMPUTER SOFTWARE; CONSTRUCTION; LIFE CYCLE; MATHEMATICAL MODELS; PROBLEM SOLVING; THREE DIMENSIONAL COMPUTER GRAPHICS;

EID: 33749596980     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/11863649_30     Document Type: Conference Paper
Times cited : (24)

References (22)
  • 2
    • 0346008100 scopus 로고    scopus 로고
    • Plausibility in the planning process - Reason and confidence in the computer-aided design and planning of buildings
    • Donath, D., Loemker, T., M., Richter, K.: Plausibility in the planning process - reason and confidence in the computer-aided design and planning of buildings. Automation in Construction, Vol. 13(2), (2004) 159-166
    • (2004) Automation in Construction , vol.13 , Issue.2 , pp. 159-166
    • Donath, D.1    Loemker, T.M.2    Richter, K.3
  • 3
    • 1642618587 scopus 로고    scopus 로고
    • Parametric 3D modeling in building construction with examples from precast concrete
    • Sacks, R., Eastmanand, C.M., Lee, G.: Parametric 3D modeling in building construction with examples from precast concrete. Automation in Construction, Vol. 13(3), (2004) 291-312
    • (2004) Automation in Construction , vol.13 , Issue.3 , pp. 291-312
    • Sacks, R.1    Eastmanand, C.M.2    Lee, G.3
  • 4
    • 33749588925 scopus 로고    scopus 로고
    • Automated management, modeling and choosing of economically effective variant in construction
    • Ustinovičius, L., Popov, V., Migilinskas, D.; Automated management, modeling and choosing of economically effective variant in construction. Transport and Telecommunication, Vol. 6(1), (2005) 183-189
    • (2005) Transport and Telecommunication , vol.6 , Issue.1 , pp. 183-189
    • Ustinovičius, L.1    Popov, V.2    Migilinskas, D.3
  • 5
    • 0033876826 scopus 로고    scopus 로고
    • A concept of space for building classification, product modelling, and design
    • Ekholm, A., Fridqvist, S.: A concept of space for building classification, product modelling, and design. Automation in Construction, Vol. 9(3), (2000) 315-328
    • (2000) Automation in Construction , vol.9 , Issue.3 , pp. 315-328
    • Ekholm, A.1    Fridqvist, S.2
  • 6
    • 4544245972 scopus 로고    scopus 로고
    • New construction management practice based on the virtual reality technology
    • Issa, R.R.A., Flood, I., O'Brien, W.J., A.A. Balkema Publishers, Lisse
    • Leinenen, J.; Kähkönen, K.: New construction management practice based on the virtual reality technology. In: 4D CAD and Visualization in Construction. Issa, R.R.A., Flood, I., O'Brien, W.J., A.A. Balkema Publishers, Lisse, (2003) 75-100
    • (2003) 4D CAD and Visualization in Construction , pp. 75-100
    • Leinenen, J.1    Kähkönen, K.2
  • 7
    • 84993029182 scopus 로고    scopus 로고
    • 4DCAD-Safety: Visualizing project scheduling and safety planning
    • Chantawit, D., Hadikusumo, B.H.W., Charoenngam C., 4DCAD-Safety: visualizing project scheduling and safety planning. Construction Innovation Vol. 5(2), (2005) 99-114
    • (2005) Construction Innovation , vol.5 , Issue.2 , pp. 99-114
    • Chantawit, D.1    Hadikusumo, B.H.W.2    Charoenngam, C.3
  • 11
    • 25444432301 scopus 로고    scopus 로고
    • Investment projects evaluation by simulation and multiple criteria decision aiding procedure
    • Nowak, M.: Investment projects evaluation by simulation and multiple criteria decision aiding procedure. Journal of Civil Engineering and Management, Vol. 11(3) (2005) 193-202
    • (2005) Journal of Civil Engineering and Management , vol.11 , Issue.3 , pp. 193-202
    • Nowak, M.1
  • 12
    • 14544272382 scopus 로고    scopus 로고
    • Distributed object models for collaboration in the construction industry
    • Leeuwen, van J.P., Zee, van der A.: Distributed Object Models for Collaboration in the Construction Industry. Automation in Construction, Vol. 14(4), (2005) 491-499
    • (2005) Automation in Construction , vol.14 , Issue.4 , pp. 491-499
    • Van Leeuwen, J.P.1    Van Der Zee, A.2
  • 13
    • 21244478717 scopus 로고    scopus 로고
    • The influence of normalization methods selection in construction including game theory adaptation
    • Migilinskas, D.: The influence of normalization methods selection in construction including game theory adaptation. Technological and economic development of economy, Vol. 9(2), (2003) 73-79
    • (2003) Technological and Economic Development of Economy , vol.9 , Issue.2 , pp. 73-79
    • Migilinskas, D.1
  • 14
    • 0344494493 scopus 로고    scopus 로고
    • An interactive method for the selection of design criteria and the formulation of optimization problems in computer aided optimal design
    • Maute, K., Raulli, M.: An interactive method for the selection of design criteria and the formulation of optimization problems in computer aided optimal design. Computers & Structures, Vol. 82(1), (2004) 71-79
    • (2004) Computers & Structures , vol.82 , Issue.1 , pp. 71-79
    • Maute, K.1    Raulli, M.2
  • 15
    • 0033309096 scopus 로고    scopus 로고
    • Context management in modeling information systems (IS)
    • Garner, B., Raban, R.: Context management in modeling information systems (IS). Information and Software Technology, Vol. 41(14), (1999) 957-961
    • (1999) Information and Software Technology , vol.41 , Issue.14 , pp. 957-961
    • Garner, B.1    Raban, R.2
  • 16
    • 0037523330 scopus 로고    scopus 로고
    • Evaluating design alternatives using conjoint experiments in virtual reality
    • Dijkstra, J., van Leeuwen, J.P., Timmermans, H.J.P., Evaluating Design Alternatives Using Conjoint Experiments in Virtual Reality. Environment and Planning, Vol.30 (2003) 357-367
    • (2003) Environment and Planning , vol.30 , pp. 357-367
    • Dijkstra, J.1    Van Leeuwen, J.P.2    Timmermans, H.J.P.3
  • 17
    • 33745989316 scopus 로고    scopus 로고
    • Complex usage of 4D information modeling concept for building design, estimation, scheduling and determination of effective variants
    • Popov, V., Mikalauskas, S. Migilinskas, D., Vainiunas, P.: Complex usage of 4D information modeling concept for building design, estimation, scheduling and determination of effective variants. Technological and economic development of economy, Vol. 12, (2006)
    • (2006) Technological and Economic Development of Economy , vol.12
    • Popov, V.1    Mikalauskas, S.2    Migilinskas, D.3    Vainiunas, P.4
  • 19
    • 33749642112 scopus 로고    scopus 로고
    • Computer integrated construction: Recent developments and future directions
    • Topping, B.H.V. (ed.). Saxe-Coburg Publications, UK
    • Aouad, G., Sun, M., Faraj, I. Computer integrated construction: recent developments and future directions. In: Topping, B.H.V. (ed.), Civil and Structural Engineering Computing: 2001. Saxe-Coburg Publications, UK, (2001) 27-54
    • (2001) Civil and Structural Engineering Computing: 2001 , pp. 27-54
    • Aouad, G.1    Sun, M.2    Faraj, I.3
  • 20
    • 33749635182 scopus 로고    scopus 로고
    • An analysis of inaccuracy effect in solving construction technology and economy problems, applying games theory
    • Selected papers (VGTU, Vilnius, Lithuania)
    • Migilinskas, D., Ustinovichius, L.: An analysis of inaccuracy effect in solving construction technology and economy problems, applying games theory. In: The 8th International Conference "Modern building materials, structures and techniques"- Selected papers (VGTU, Vilnius, Lithuania), (2004) 229-235
    • (2004) The 8th International Conference "Modern Building Materials, Structures and Techniques" , pp. 229-235
    • Migilinskas, D.1    Ustinovichius, L.2
  • 21
    • 85024238887 scopus 로고    scopus 로고
    • A decision support system applying multicriteria synthesis methods in construction
    • Sarka, V.: A Decision Support System Applying Multicriteria Synthesis Methods in Construction. Statyba (Civil Engineering and Management), Vol. 6(6), (2000) 464-468
    • (2000) Statyba (Civil Engineering and Management) , vol.6 , Issue.6 , pp. 464-468
    • Sarka, V.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.