메뉴 건너뛰기




Volumn 12, Issue 2, 2000, Pages 150-162

Selecting Scheduling Heuristics Using Neural Networks

Author keywords

Genetic algorithms; Heuristic selection; Hybrid flowshop scheduling; Parallel machines; Two tier neural networks

Indexed keywords


EID: 0000210782     PISSN: 10919856     EISSN: None     Source Type: Journal    
DOI: 10.1287/ijoc.12.2.150.11893     Document Type: Article
Times cited : (28)

References (17)
  • 1
    • 0028791125 scopus 로고
    • Efficiency of Modified Backpropagation and Optimization Methods on a Real-World Medical Problem
    • D. ALPSAN, M. TOWNSEY, O. OLDAMAR, A.C. TSOI, and D.N. GHISTA, 1995. Efficiency of Modified Backpropagation and Optimization Methods on a Real-World Medical Problem, Neural Networks 8, 945-962.
    • (1995) Neural Networks , vol.8 , pp. 945-962
    • Alpsan, D.1    Townsey, M.2    Oldamar, O.3    Tsoi, A.C.4    Ghista, D.N.5
  • 2
  • 3
    • 84952507313 scopus 로고
    • Genetic Algorithms for Estimation Problems with Multiple Optima, Non-Differentiability, and Other Irregular Features
    • R.E. DORSEY and W.J. MAYER, 1995. Genetic Algorithms for Estimation Problems with Multiple Optima, Non-Differentiability, and Other Irregular Features, Journal of Business and Economic Statistics 13, 53-66.
    • (1995) Journal of Business and Economic Statistics , vol.13 , pp. 53-66
    • Dorsey, R.E.1    Mayer, W.J.2
  • 4
    • 0040587537 scopus 로고
    • The Genetic Adaptive Neural Network Training (GANNT) for Generic Feed-forward Artificial Neural Systems
    • School of Business Administration, University of Mississippi, University, MS
    • R.E. DORSEY, J.D. JOHNSON, and W.J. MAYER, 1992. The Genetic Adaptive Neural Network Training (GANNT) for Generic Feed-forward Artificial Neural Systems, Working Paper, School of Business Administration, University of Mississippi, University, MS.
    • (1992) Working Paper
    • Dorsey, R.E.1    Johnson, J.D.2    Mayer, W.J.3
  • 5
    • 0024866495 scopus 로고
    • On the Approximate Realization of Continuous Mappings by Neural Networks
    • K.-I. FUNAHASHI, 1989. On the Approximate Realization of Continuous Mappings by Neural Networks, Neural Networks 2, 183-192.
    • (1989) Neural Networks , vol.2 , pp. 183-192
    • Funahashi, K.-I.1
  • 6
    • 0000195251 scopus 로고    scopus 로고
    • Comparing Backpropagation with a Genetic Algorithm for Neural Network Training
    • J.N.D. GUPTA and R.S. SEXTON, 1999. Comparing Backpropagation with a Genetic Algorithm for Neural Network Training, OMEGA 27, 679-684.
    • (1999) OMEGA , vol.27 , pp. 679-684
    • Gupta, J.N.D.1    Sexton, R.S.2
  • 8
    • 0342814029 scopus 로고    scopus 로고
    • Neural Networks Approach to Select Scheduling Heuristics for a Two-Stage Hybrid Flowshop
    • J.N.D. GUPTA and E.A. TUNC, 1997. Neural Networks Approach to Select Scheduling Heuristics for a Two-Stage Hybrid Flowshop, International Journal of Management and Systems 13, 283-298.
    • (1997) International Journal of Management and Systems , vol.13 , pp. 283-298
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 9
    • 0024880831 scopus 로고
    • Multilayer Feed-forward Networks are Universal Approximators
    • K. HORNIK, M. STINCHCOMBE, and H. WHITE, 1989. Multilayer Feed-forward Networks are Universal Approximators, Neural Networks 2, 359-366.
    • (1989) Neural Networks , vol.2 , pp. 359-366
    • Hornik, K.1    Stinchcombe, M.2    White, H.3
  • 10
    • 0345901561 scopus 로고
    • Sequencing and Scheduling: Algorithms and Complexity
    • S.C. Graves, A.H.G. Rinnooy Kan, and P.M. Zipkin (eds.), North-Holland, Amsterdam
    • E.L. LAWLER, J.K. LENSTRA, A.H.G. RINNOOY KAN, and D.B. SHMOYS, 1993. Sequencing and Scheduling: Algorithms and Complexity, in Logistics of Production and Inventory, S.C. Graves, A.H.G. Rinnooy Kan, and P.M. Zipkin (eds.), North-Holland, Amsterdam, 445-522.
    • (1993) Logistics of Production and Inventory , pp. 445-522
    • Lawler, E.L.1    Lenstra, J.K.2    Rinnooy Kan, A.H.G.3    Shmoys, D.B.4
  • 12
    • 0000062028 scopus 로고
    • An n Job, One-Machine Sequencing Algorithm for Minimizing the Number of Late Jobs
    • J.M. MOORE, 1968. An n Job, One-Machine Sequencing Algorithm for Minimizing the Number of Late Jobs, Management Science 15, 102-109.
    • (1968) Management Science , vol.15 , pp. 102-109
    • Moore, J.M.1
  • 13
    • 0008547853 scopus 로고
    • Neural Networks for Selecting Vehicle Routing Heuristics
    • K.E. NYGARD, P. JUELL, and N. KABADA, 1990. Neural Networks for Selecting Vehicle Routing Heuristics, ORSA Journal on Computing 4, 485-493.
    • (1990) ORSA Journal on Computing , vol.4 , pp. 485-493
    • Nygard, K.E.1    Juell, P.2    Kabada, N.3
  • 16
    • 0002381070 scopus 로고    scopus 로고
    • Neural Network for Combinatorial Optimization: A Review of More Than a Decade of Research
    • K.A. SMITH, 1999. Neural Network for Combinatorial Optimization: A Review of More Than a Decade of Research, INFORMS Journal on Computing 11, 15-34.
    • (1999) INFORMS Journal on Computing , vol.11 , pp. 15-34
    • Smith, K.A.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.