Volumn 175, Issue 1, 2006, Pages 338-361

Aversion scheduling in the presence of risky jobs

Author keywords

Adaptive heuristics; Aversion Dynamics; Risk mitigation heuristics; Scheduling

Indexed keywords

HEURISTIC METHODS; SCHEDULING; STRATEGIC PLANNING;

EID: 33749342378     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2005.05.010     Document Type: Article
Times cited : (6)

References (26)
  • 1
    • 0032682389 scopus 로고    scopus 로고
    • Scheduling with time dependent processing times: Review and extensions
    • Alidaee B., and Womer N.K. Scheduling with time dependent processing times: Review and extensions. Journal of the Operational Research Society 50 (1999) 711-720
    • (1999) Journal of the Operational Research Society , vol.50 , pp. 711-720
    • Alidaee, B.1    Womer, N.K.2
  • 2
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • Aytug H., Lawley M.A., McKay K.N., Mohan S., and Uzsoy R. Executing production schedules in the face of uncertainties: A review and some future directions. European Journal of Operations Research 165 1 (2005) 86-110
    • (2005) European Journal of Operations Research , vol.165 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.N.3    Mohan, S.4    Uzsoy, R.5
  • 3
    • 33749320858 scopus 로고    scopus 로고
    • Black, G.W., 2001. Predictive, stochastic and dynamic extensions to Aversion Dynamics scheduling, Ph.D. Dissertation, University of Alabama in Huntsville, Industrial & Systems Engineering and Engineering Management.
  • 4
    • 3042755390 scopus 로고    scopus 로고
    • Predictive, stochastic and dynamic extensions to Aversion Dynamics scheduling
    • Black G.W., McKay K.N., and Messimer S.L. Predictive, stochastic and dynamic extensions to Aversion Dynamics scheduling. Journal of Scheduling 7 4 (2004) 277-292
    • (2004) Journal of Scheduling , vol.7 , Issue.4 , pp. 277-292
    • Black, G.W.1    McKay, K.N.2    Messimer, S.L.3
  • 7
    • 0037410423 scopus 로고    scopus 로고
    • Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
    • Dubois D., Fargier H., and Fortemps P. Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research 147 (2003) 231-252
    • (2003) European Journal of Operational Research , vol.147 , pp. 231-252
    • Dubois, D.1    Fargier, H.2    Fortemps, P.3
  • 8
    • 3042836706 scopus 로고    scopus 로고
    • A weighted modified due date rule for sequencing to minimize weighted tardiness
    • Kanet J.J., and Li X. A weighted modified due date rule for sequencing to minimize weighted tardiness. Journal of Scheduling 7 4 (2004) 263-278
    • (2004) Journal of Scheduling , vol.7 , Issue.4 , pp. 263-278
    • Kanet, J.J.1    Li, X.2
  • 9
    • 0033685372 scopus 로고    scopus 로고
    • Scheduling with inserted idle time: Problem taxonomy and literature review
    • Kanet J.J., and Sridharan V. Scheduling with inserted idle time: Problem taxonomy and literature review. Operations Research 48 1 (2000) 99-110
    • (2000) Operations Research , vol.48 , Issue.1 , pp. 99-110
    • Kanet, J.J.1    Sridharan, V.2
  • 10
    • 0037449249 scopus 로고    scopus 로고
    • Short-term robustness of production management systems: A case study
    • Kleijnen J.P.C., and Gaury E. Short-term robustness of production management systems: A case study. European Journal of Operational Research 148 2 (2003) 452-465
    • (2003) European Journal of Operational Research , vol.148 , Issue.2 , pp. 452-465
    • Kleijnen, J.P.C.1    Gaury, E.2
  • 11
    • 0031069765 scopus 로고    scopus 로고
    • Heuristic, optimal, static, and dynamic schedules when processing times are uncertain
    • Lawrence S.R., and Sewell E.C. Heuristic, optimal, static, and dynamic schedules when processing times are uncertain. Journal of Operations Management 15 1 (1997) 71-82
    • (1997) Journal of Operations Management , vol.15 , Issue.1 , pp. 71-82
    • Lawrence, S.R.1    Sewell, E.C.2
  • 12
    • 33749358798 scopus 로고    scopus 로고
    • McKay, K.N., 1992. Production planning and scheduling: A model for manufacturing decisions requiring judgement, Ph.D. Dissertation, Department of Management Sciences, University of Waterloo.
  • 14
    • 3042704313 scopus 로고
    • A Tutorial on Bottleneck Dynamics: A Heuristic Scheduling Methodology
    • Morton T.E., Narayan V., and Ramnath P. A Tutorial on Bottleneck Dynamics: A Heuristic Scheduling Methodology. Production and Operations Management 4 2 (1995) 94-107
    • (1995) Production and Operations Management , vol.4 , Issue.2 , pp. 94-107
    • Morton, T.E.1    Narayan, V.2    Ramnath, P.3
  • 16
    • 33749321826 scopus 로고    scopus 로고
    • Morton, T.E., Rachamadugu, R.M., 1983. Myopic heuristics for the single machine weighted tardiness problem, Technical Report CMU-RI-TR-83-9, Graduate School of Industrial Administration, Carnegie-Mellon University.
  • 17
  • 18
    • 0033343706 scopus 로고    scopus 로고
    • Predictable scheduling of a single machine with breakdowns and sensitive jobs
    • O'Donovan R., Uzsoy R., and McKay K.N. Predictable scheduling of a single machine with breakdowns and sensitive jobs. International Journal of Production Research 37 18 (1999) 4217-4233
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4217-4233
    • O'Donovan, R.1    Uzsoy, R.2    McKay, K.N.3
  • 19
    • 0028452709 scopus 로고
    • Rolling horizon algorithms for single machine dynamic scheduling problem with sequence dependent set up times
    • Ovackik I.M., and Uzsoy R. Rolling horizon algorithms for single machine dynamic scheduling problem with sequence dependent set up times. International Journal of Production Research 32 (1994) 1243-1263
    • (1994) International Journal of Production Research , vol.32 , pp. 1243-1263
    • Ovackik, I.M.1    Uzsoy, R.2
  • 20
    • 0029404198 scopus 로고
    • Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent set up times
    • Ovackik I.M., and Uzsoy R. Rolling horizon procedures for dynamic parallel machine scheduling with sequence dependent set up times. International Journal of Production Research 33 (1995) 3173-3192
    • (1995) International Journal of Production Research , vol.33 , pp. 3173-3192
    • Ovackik, I.M.1    Uzsoy, R.2
  • 21
    • 0242301584 scopus 로고    scopus 로고
    • Scheduling methods for the statistical setup adjustment problem
    • Pan R., and Del Castillo E. Scheduling methods for the statistical setup adjustment problem. International Journal of Production Research 41 7 (2003) 1467-1481
    • (2003) International Journal of Production Research , vol.41 , Issue.7 , pp. 1467-1481
    • Pan, R.1    Del Castillo, E.2
  • 23
    • 0033226070 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
    • Shafaei R., and Brunn P. Workshop scheduling using practical (inaccurate) data Part 1: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach. International Journal of Production Research 37 17 (1999) 3913-3925
    • (1999) International Journal of Production Research , vol.37 , Issue.17 , pp. 3913-3925
    • Shafaei, R.1    Brunn, P.2
  • 24
    • 0033355662 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment
    • Shafaei R., and Brunn P. Workshop scheduling using practical (inaccurate) data Part 2: An investigation of the robustness of scheduling rules in a dynamic and stochastic environment. International Journal of Production Research 37 18 (1999) 4105-4117
    • (1999) International Journal of Production Research , vol.37 , Issue.18 , pp. 4105-4117
    • Shafaei, R.1    Brunn, P.2
  • 25
    • 0034627943 scopus 로고    scopus 로고
    • Workshop scheduling using practical (inaccurate) data Part 3: A framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule
    • Shafaei R., and Brunn P. Workshop scheduling using practical (inaccurate) data Part 3: A framework to integrate job releasing, routing and scheduling functions to create a robust predictive schedule. International Journal of Production Research 38 1 (2000) 85-99
    • (2000) International Journal of Production Research , vol.38 , Issue.1 , pp. 85-99
    • Shafaei, R.1    Brunn, P.2
  • 26
    • 0023399009 scopus 로고
    • Priority Rules for Job Shops With Weighted Tardiness Costs
    • Vepsalainen A.P., and Morton T.E. Priority Rules for Job Shops With Weighted Tardiness Costs. Management Science 33 8 (1987) 1035-1047
    • (1987) Management Science , vol.33 , Issue.8 , pp. 1035-1047
    • Vepsalainen, A.P.1    Morton, T.E.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.