-
2
-
-
0003054955
-
A survey of scheduling rules
-
S.S. Panwalkar, "A survey of scheduling rules", Oper. Res., 23(5) (1977) 961-973.
-
(1977)
Oper. Res.
, vol.23
, Issue.5
, pp. 961-973
-
-
Panwalkar, S.S.1
-
3
-
-
0043183846
-
Comprehensive evaluation of priority rules for on-line scheduling, the single machine case
-
M. Moser and S. Engell, "Comprehensive evaluation of priority rules for on-line scheduling, the single machine case", IEEE Experts (1992) 403-404.
-
(1992)
IEEE Experts
, pp. 403-404
-
-
Moser, M.1
Engell, S.2
-
4
-
-
29444438437
-
Dynamic job shop scheduling: A survey of simulation studies
-
R. Ramasesh, "Dynamic job shop scheduling: a survey of simulation studies", Int. J. Manage. Sci., 18(1) (1990) 43-57.
-
(1990)
Int. J. Manage. Sci.
, vol.18
, Issue.1
, pp. 43-57
-
-
Ramasesh, R.1
-
5
-
-
0028594405
-
Simulation-based real-time scheduling in a flexible manufacturing system
-
M.H. Kim and Y.D. Kim, "Simulation-based real-time scheduling in a flexible manufacturing system", J. Manufac. Syst., 13(2) (1994) 85-93.
-
(1994)
J. Manufac. Syst.
, vol.13
, Issue.2
, pp. 85-93
-
-
Kim, M.H.1
Kim, Y.D.2
-
8
-
-
0023562034
-
Heuristic methods for flexible flow line scheduling
-
S. Kochhar and R.J.T. Morris, "Heuristic methods for flexible flow line scheduling", J. Manufac. Syst., 6(4) (1987) 299-314.
-
(1987)
J. Manufac. Syst.
, vol.6
, Issue.4
, pp. 299-314
-
-
Kochhar, S.1
Morris, R.J.T.2
-
9
-
-
84972263711
-
Intelligent agents: Theory and practice
-
M. Wooldridge and N.R. Jennings, "Intelligent agents: theory and practice", Know. Eng. Rev., 10(2) (1995) 115-152.
-
(1995)
Know. Eng. Rev.
, vol.10
, Issue.2
, pp. 115-152
-
-
Wooldridge, M.1
Jennings, N.R.2
-
10
-
-
0001794206
-
The distributed asynchronous scheduler
-
Morgan Kaufman, San Francisco, CA
-
P. Burke and P. Prusser, "The distributed asynchronous scheduler", Intelligent Scheduling, Morgan Kaufman, San Francisco, CA, 1994, pp. 309-339.
-
(1994)
Intelligent Scheduling
, pp. 309-339
-
-
Burke, P.1
Prusser, P.2
-
11
-
-
0000762544
-
Exploiting problem structure for distributed constraint optimization
-
AAAI Press/MIT Press, San Francisco, CA
-
J. Liu and K.P. Sycara, "Exploiting problem structure for distributed constraint optimization", Proc First Int. Conf. on Multi-agent Systems, AAAI Press/MIT Press, San Francisco, CA, 1995, pp. 246-253.
-
(1995)
Proc First Int. Conf. on Multi-agent Systems
, pp. 246-253
-
-
Liu, J.1
Sycara, K.P.2
-
12
-
-
0002326640
-
ADDYMS: Architecture for distributed dynamic manufacturing scheduling
-
AAAI Press/MIT Press, Menlo Park, CA
-
J. Butler and H. Ohtsubo, "ADDYMS: architecture for distributed dynamic manufacturing scheduling", Artificial Intelligence Applications in Manufacturing, AAAI Press/MIT Press, Menlo Park, CA, 1992, pp. 199-213.
-
(1992)
Artificial Intelligence Applications in Manufacturing
, pp. 199-213
-
-
Butler, J.1
Ohtsubo, H.2
-
13
-
-
0039310873
-
HSTS: Integrating planning and scheduling
-
Morgan Kaufman, San Francisco, CA
-
N. Muscettola, "HSTS: integrating planning and scheduling". Intelligent Scheduling, Morgan Kaufman, San Francisco, CA, 1994, pp. 169-212.
-
(1994)
Intelligent Scheduling
, pp. 169-212
-
-
Muscettola, N.1
-
14
-
-
0003307088
-
O-plan2: An open architecture for command, planning, and control
-
Morgan Kaufman, San Francisco, CA
-
A. Tate, B. Drabble and R. Kirby, "O-Plan2: an open architecture for command, planning, and control", Intelligent Scheduling, Morgan Kaufman, San Francisco, CA, 1994, pp. 213-239.
-
(1994)
Intelligent Scheduling
, pp. 213-239
-
-
Tate, A.1
Drabble, B.2
Kirby, R.3
-
15
-
-
0030216517
-
Multi-agent mediator architecture for distributed manufacturing
-
F.P. Maturana and D.H. Norrie, "Multi-agent mediator architecture for distributed manufacturing", J. Intel. Manufac., 7 (1996) 257-270.
-
(1996)
J. Intel. Manufac.
, vol.7
, pp. 257-270
-
-
Maturana, F.P.1
Norrie, D.H.2
-
16
-
-
0342858811
-
A multi-agent approach to integrate planning and scheduling for concurrent engineering
-
F. Maturana, S. Balasubramanian and D.H. Norrie, "A multi-agent approach to integrate planning and scheduling for concurrent engineering", Proc. Third ISPE Int. Conf. on Concurrent Engineering: Research and Application, Toronto, 26-28 August 1996, pp. 272-279.
-
Proc. Third ISPE Int. Conf. on Concurrent Engineering: Research and Application, Toronto, 26-28 August 1996
, pp. 272-279
-
-
Maturana, F.1
Balasubramanian, S.2
Norrie, D.H.3
-
17
-
-
0003863875
-
-
University of Michigan, Department of Civil Engineering, Ann Arbor, MI
-
D.E. Goldberg, SGA: Simple Genetic Algorithms, University of Michigan, Department of Civil Engineering, Ann Arbor, MI, 1982.
-
(1982)
SGA: Simple Genetic Algorithms
-
-
Goldberg, D.E.1
-
19
-
-
0027677773
-
Managing genetic search in job shop scheduling
-
S. Uckun, S. Bagchi and K. Kawamura, "Managing genetic search in job shop scheduling", IEEE Experts (1993) 15-24.
-
(1993)
IEEE Experts
, pp. 15-24
-
-
Uckun, S.1
Bagchi, S.2
Kawamura, K.3
-
20
-
-
0027683141
-
Training product unit neural networks with genetic algorithms
-
D.J. Janson and J.F. Frenzel, "Training product unit neural networks with genetic algorithms", IEEE Experts (1993) 27-28.
-
(1993)
IEEE Experts
, pp. 27-28
-
-
Janson, D.J.1
Frenzel, J.F.2
|