메뉴 건너뛰기




Volumn 101, Issue 3, 1997, Pages 452-462

A framework for decision support systems for scheduling problems

Author keywords

Conflict hypergraph; Conflict resolution; Decision support system; Hard and soft constraints; Problem base management system

Indexed keywords

CONSTRAINT THEORY; DECISION SUPPORT SYSTEMS; EFFICIENCY; GRAPH THEORY; OPTIMIZATION; RESEARCH AND DEVELOPMENT MANAGEMENT;

EID: 0031220048     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/S0377-2217(96)00186-5     Document Type: Article
Times cited : (7)

References (18)
  • 2
    • 0026137120 scopus 로고
    • A survey for constraint based scheduling systems using an artificial intelligence approach
    • Atabakhsh, H. (1991), "A survey for constraint based scheduling systems using an artificial intelligence approach", Artificial Intelligence Engineering 6, 58-73.
    • (1991) Artificial Intelligence Engineering , vol.6 , pp. 58-73
    • Atabakhsh, H.1
  • 6
    • 0023842374 scopus 로고
    • Network-based heuristics for constraint-satisfaction problems
    • Dechter, R., and Pearl, J. (1988), "Network-based heuristics for constraint-satisfaction problems", Artificial Intelligence 34, 1-38.
    • (1988) Artificial Intelligence , vol.34 , pp. 1-38
    • Dechter, R.1    Pearl, J.2
  • 7
    • 84880353839 scopus 로고
    • Conflict resolution algorithms for scheduling problems
    • Report No. 93/5, ISSN 0943-3805, Technical University Clausthal
    • Ecker, K., and Schmidt, G. (1993), "Conflict resolution algorithms for scheduling problems", Report No. 93/5, ISSN 0943-3805, 1992 Lessach Workshop on Parallel Processing, Technical University Clausthal.
    • (1993) 1992 Lessach Workshop on Parallel Processing
    • Ecker, K.1    Schmidt, G.2
  • 10
    • 0027578251 scopus 로고
    • A mixed-initiative scheduling workbench: Integrating AI, OR, and HCI
    • Hsu, W., Prietula, M.J., Thompson, G.I., and Ow, P.S. (1993), "A mixed-initiative scheduling workbench: Integrating AI, OR, and HCI", Decision Support Systems 9, 245-257.
    • (1993) Decision Support Systems , vol.9 , pp. 245-257
    • Hsu, W.1    Prietula, M.J.2    Thompson, G.I.3    Ow, P.S.4
  • 12
    • 3342943539 scopus 로고
    • Implementation of a decision support system for scheduling semiconductor test operations
    • Lee, C.-Y., Martin-Vega, L.A., Uzsoy, R., and Hinchman, J. (1993), "Implementation of a decision support system for scheduling semiconductor test operations", Journal of Electronics Manufacturing 6, 121-131.
    • (1993) Journal of Electronics Manufacturing , vol.6 , pp. 121-131
    • Lee, C.-Y.1    Martin-Vega, L.A.2    Uzsoy, R.3    Hinchman, J.4
  • 14
    • 30244469541 scopus 로고
    • Constraint satisfaction problems in project scheduling
    • R. Słowiński and J. Wȩglarz (eds.), Elsevier, Amsterdam
    • Schmidt, G. (1989b), "Constraint satisfaction problems in project scheduling", in: R. Słowiński and J. Wȩglarz (eds.), Advances in Project Scheduling, Elsevier, Amsterdam, 135-150.
    • (1989) Advances in Project Scheduling , pp. 135-150
    • Schmidt, G.1
  • 15
    • 0041522293 scopus 로고
    • A decision support system for production scheduling
    • Schmidt, G. (1992), "A decision support system for production scheduling", Journal of Decision Systems 1, 243-260.
    • (1992) Journal of Decision Systems , vol.1 , pp. 243-260
    • Schmidt, G.1
  • 17


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.