-
1
-
-
0036200385
-
Distributed manufacturing scheduling using intelligent agents
-
Shen W. Distributed manufacturing scheduling using intelligent agents. IEEE Intell Syst 17 1 (2002) 88-94
-
(2002)
IEEE Intell Syst
, vol.17
, Issue.1
, pp. 88-94
-
-
Shen, W.1
-
2
-
-
46749150596
-
-
Bongaerts L. Integration of scheduling and control in holonic manufacturing systems. Ph.D. Thesis: Katholieke Universiteit, Leuven, Belgium. 1998.
-
Bongaerts L. Integration of scheduling and control in holonic manufacturing systems. Ph.D. Thesis: Katholieke Universiteit, Leuven, Belgium. 1998.
-
-
-
-
4
-
-
0030673502
-
-
Parunak HVD, Baker A, Clark S. The AARIA Agent Architecture: an example of requirements-driven agent-based system design. Proceedings of the first International Conference Autonomous Agents, ACM Press, New York, 1997, p. 482-3.
-
Parunak HVD, Baker A, Clark S. The AARIA Agent Architecture: an example of requirements-driven agent-based system design. Proceedings of the first International Conference Autonomous Agents, ACM Press, New York, 1997, p. 482-3.
-
-
-
-
5
-
-
46749140437
-
-
Sadeh N, Fox M. CORTES: An exploration into microOpportunistic job-shop scheduling. Proceedings of the Workshop on Manufacturing Production Scheduling, Detroit, 1989.
-
Sadeh N, Fox M. CORTES: An exploration into microOpportunistic job-shop scheduling. Proceedings of the Workshop on Manufacturing Production Scheduling, Detroit, 1989.
-
-
-
-
6
-
-
0032624359
-
A distributed architecture and negotiation protocol for scheduling in manufacturing systems
-
Sousa P., and Ramos C. A distributed architecture and negotiation protocol for scheduling in manufacturing systems. Comput Ind 38 2 (1999) 103-113
-
(1999)
Comput Ind
, vol.38
, Issue.2
, pp. 103-113
-
-
Sousa, P.1
Ramos, C.2
-
7
-
-
0032202838
-
Holonic manufacturing scheduling: architecture, cooperation mechanism and implementation
-
Gou L., Luh P., and Kyoya Y. Holonic manufacturing scheduling: architecture, cooperation mechanism and implementation. Comput Ind 37 (1998) 213-231
-
(1998)
Comput Ind
, vol.37
, pp. 213-231
-
-
Gou, L.1
Luh, P.2
Kyoya, Y.3
-
8
-
-
84950937653
-
Integrated shop floor control using autonomous agents
-
Solberg J., and Lin G. Integrated shop floor control using autonomous agents. IIE Trans 24 3 (1992) 57-71
-
(1992)
IIE Trans
, vol.24
, Issue.3
, pp. 57-71
-
-
Solberg, J.1
Lin, G.2
-
9
-
-
0029719285
-
A market approach to holonic manufacturing
-
Markus A., Vancza T K., and Monostori L. A market approach to holonic manufacturing. Ann CIRP 45 (1996) 433-436
-
(1996)
Ann CIRP
, vol.45
, pp. 433-436
-
-
Markus, A.1
Vancza T, K.2
Monostori, L.3
-
10
-
-
0030413949
-
-
Sugimura N, Hiroi M, Moriwaki T, Hozumi K. A study on holonic scheduling for manufacturing system of composite parts. Japan/USA Symposium on Flexible Manufacturing; 1996.
-
Sugimura N, Hiroi M, Moriwaki T, Hozumi K. A study on holonic scheduling for manufacturing system of composite parts. Japan/USA Symposium on Flexible Manufacturing; 1996.
-
-
-
-
11
-
-
46749101117
-
-
Hino R, Moriwaki T. Decentralized scheduling in agent manufacturing system. Proceedings of the second international Workshop on Intelligent Manufacturing Systems, Belgium, 1999, p. 41-7.
-
Hino R, Moriwaki T. Decentralized scheduling in agent manufacturing system. Proceedings of the second international Workshop on Intelligent Manufacturing Systems, Belgium, 1999, p. 41-7.
-
-
-
-
12
-
-
15744388519
-
-
Logie S, Sabaz D, Gruver WA. Sliding window distributed combinatorial scheduling using JADE. Proceedings of the 2004 IEEE International Conference on Systems, Man and Cybernetics Netherlands, 2004, p. 1984-9.
-
Logie S, Sabaz D, Gruver WA. Sliding window distributed combinatorial scheduling using JADE. Proceedings of the 2004 IEEE International Conference on Systems, Man and Cybernetics Netherlands, 2004, p. 1984-9.
-
-
-
-
13
-
-
46749152358
-
Negotiation in multi-agent based dynamic scheduling
-
Rabelo R., and Camarinha-Matos L.M. Negotiation in multi-agent based dynamic scheduling. Robot Comput Integ Manuf 7 4 (1996) 257-270
-
(1996)
Robot Comput Integ Manuf
, vol.7
, Issue.4
, pp. 257-270
-
-
Rabelo, R.1
Camarinha-Matos, L.M.2
-
14
-
-
0030674740
-
Holonic control for manufacturing systems: design of a manufacturing robot cell
-
Heikkilä T., Jarviluoma M., and Juntunen T. Holonic control for manufacturing systems: design of a manufacturing robot cell. Integ Comput Aided Eng 4 (1997) 202-218
-
(1997)
Integ Comput Aided Eng
, vol.4
, pp. 202-218
-
-
Heikkilä, T.1
Jarviluoma, M.2
Juntunen, T.3
-
15
-
-
30544441225
-
ADACOR: a holonic architecture for agile and adaptive manufacturing control
-
Leitão P., and Restivo F. ADACOR: a holonic architecture for agile and adaptive manufacturing control. Comput Ind 57 2 (2006) 121-130
-
(2006)
Comput Ind
, vol.57
, Issue.2
, pp. 121-130
-
-
Leitão, P.1
Restivo, F.2
-
16
-
-
0019180974
-
Contract net protocol: high-level communication and control in a distributed solver
-
Smith R. Contract net protocol: high-level communication and control in a distributed solver. IEEE Trans Comput C-29 12 (1980) 1104-1113
-
(1980)
IEEE Trans Comput
, vol.C-29
, Issue.12
, pp. 1104-1113
-
-
Smith, R.1
-
17
-
-
26944503054
-
Experimental validation of ADACOR holonic control system
-
Marík V., Brennan R., and Pechoucek M. (Eds), Springer
-
Leitão P., and Restivo F. Experimental validation of ADACOR holonic control system. In: Marík V., Brennan R., and Pechoucek M. (Eds). Holonic and multi-agent systems for manufacturing, LNAI 3593 (2005), Springer 121-132
-
(2005)
Holonic and multi-agent systems for manufacturing, LNAI 3593
, pp. 121-132
-
-
Leitão, P.1
Restivo, F.2
|