![]() |
Volumn 25, Issue 2, 2009, Pages 441-448
|
Distributed and centralised material handling scheduling: Comparison and results of a simulation study
|
Author keywords
Distributed scheduling; Holonic systems; Real time response
|
Indexed keywords
INDUSTRIAL RESEARCH;
MATERIALS HANDLING;
MATERIALS HANDLING EQUIPMENT;
SCHEDULING;
DISTRIBUTED SCHEDULING;
EVALUATION TESTS;
FEASIBLE SOLUTIONS;
HOLONIC;
HOLONIC SYSTEMS;
MANUFACTURING PLANNING AND CONTROLS;
MATERIAL HANDLING SYSTEMS;
MATERIAL HANDLINGS;
MODELLING TECHNIQUES;
REAL-TIME RESPONSE;
SCHEDULING SYSTEMS;
SIMULATION STUDIES;
SYSTEM RESOURCES;
REAL TIME SYSTEMS;
|
EID: 63749126112
PISSN: 07365845
EISSN: None
Source Type: Journal
DOI: 10.1016/j.rcim.2008.02.007 Document Type: Article |
Times cited : (12)
|
References (14)
|