메뉴 건너뛰기




Volumn 47, Issue 1, 2009, Pages 119-142

The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model

Author keywords

ESCSA; FLC; Leagile; Outsourcing; Process planning; Scheduling

Indexed keywords

COMMERCE; COMPETITION; COMPUTATION THEORY; FUZZY LOGIC; OPTIMIZATION; OUTSOURCING; PROCESS PLANNING; SCHEDULING; SIMULATED ANNEALING;

EID: 56349099192     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540600818195     Document Type: Article
Times cited : (59)

References (48)
  • 1
    • 0030232050 scopus 로고    scopus 로고
    • Integer linear programming and constraint programming compared
    • The progressive party problem
    • Barbara, M.S., Brailsford, S.C., Hubbard, P.M. and Williams, H.P., The progressive party problem: Integer linear programming and constraint programming compared. Constraints, 1996, 1, 119-138.
    • (1996) Constraints , vol.1 , pp. 119-138
    • Barbara, M.S.1    Brailsford, S.C.2    Hubbard, P.M.3    Williams, H.P.4
  • 2
    • 0025477779 scopus 로고
    • Process plan selection
    • Bhaskaaran, K., Process plan selection. Int. J. Prod. Res., 1990, 28, 1527-1539.
    • (1990) Int. J. Prod. Res , vol.28 , pp. 1527-1539
    • Bhaskaaran, K.1
  • 4
  • 5
    • 0029273131 scopus 로고
    • Future manufacturing systems-towards the extended enterprise
    • Browne, J., Sackett, P.J. and Wortmann, J.C., Future manufacturing systems-towards the extended enterprise. Camp. Indust. Arch, 1995, 25, 235-254.
    • (1995) Camp. Indust. Arch , vol.25 , pp. 235-254
    • Browne, J.1    Sackett, P.J.2    Wortmann, J.C.3
  • 6
    • 0030274931 scopus 로고    scopus 로고
    • From lean to agile manufacturing
    • 3/1-3/5
    • Bunce, P. and Gould, P., From lean to agile manufacturing. IEE Colloquium (Digest.), 1996, 278, 3/1-3/5.
    • (1996) IEE Colloquium (Digest.) , vol.278
    • Bunce, P.1    Gould, P.2
  • 7
    • 1642492010 scopus 로고    scopus 로고
    • Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time
    • Cai, X., Sun, X.Q. and Zhou, X., Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time. Prob. Eng. Informat. Sci., 2003, 17, 467-485.
    • (2003) Prob. Eng. Informat. Sci , vol.17 , pp. 467-485
    • Cai, X.1    Sun, X.Q.2    Zhou, X.3
  • 8
    • 0035920341 scopus 로고    scopus 로고
    • Modeling for agile manufacturing systems
    • Chan, F.T. S. and Zhang, J.. Modeling for agile manufacturing systems. Int. J. Prod. Res., 2001, 39, 2313-2332.
    • (2001) Int. J. Prod. Res , vol.39 , pp. 2313-2332
    • Chan, F.T.S.1    Zhang, J.2
  • 9
    • 2642547919 scopus 로고    scopus 로고
    • Modeling of integrated, distributed and cooperative process planning system using an agent-based approach
    • Chan, F.T. S., Zhang, J. and Li, P., Modeling of integrated, distributed and cooperative process planning system using an agent-based approach. Proc. I MECHE Part B J. Eng. Manufac., 2001, 215, 1437-1451.
    • (2001) Proc. I MECHE Part B J. Eng. Manufac , vol.215 , pp. 1437-1451
    • Chan, F.T.S.1    Zhang, J.2    Li, P.3
  • 10
    • 0001634042 scopus 로고    scopus 로고
    • Supply chain migration from lean and functional to agile and customized
    • Christopher, M. and Towill, D., Supply chain migration from lean and functional to agile and customized. Int. J. Sup. Chain Manag., 2000, 5, 206-213.
    • (2000) Int. J. Sup. Chain Manag , vol.5 , pp. 206-213
    • Christopher, M.1    Towill, D.2
  • 11
    • 0032777406 scopus 로고    scopus 로고
    • Systems design framework for the extended enterprise
    • Davis, M., Systems design framework for the extended enterprise. Prod. Plan. Com., 1999, 10, 3-18.
    • (1999) Prod. Plan. Com , vol.10 , pp. 3-18
    • Davis, M.1
  • 12
    • 85042163696 scopus 로고
    • A new optimization algorithm for the vehicle routing problem with time windows
    • Desrochers, M., Desrosiers, J. and Solomon, M., A new optimization algorithm for the vehicle routing problem with time windows. Oper. Res., 1992, 40, 342-354.
    • (1992) Oper. Res , vol.40 , pp. 342-354
    • Desrochers, M.1    Desrosiers, J.2    Solomon, M.3
  • 13
    • 0030134958 scopus 로고    scopus 로고
    • A survey of machine scheduling problems with blocking and no-wait in process
    • Hall, N.G. and Sriskandrajah, C., A survey of machine scheduling problems with blocking and no-wait in process. Oper. Res., 1996, 44, 510-525.
    • (1996) Oper. Res , vol.44 , pp. 510-525
    • Hall, N.G.1    Sriskandrajah, C.2
  • 14
    • 0029196321 scopus 로고
    • The fleet assignment problem.: Solving a large-scale integer program
    • Hane, C.A., Barnhart, C., Johnson, E.L., et al., The fleet assignment problem.: solving a large-scale integer program. Mathe. Prog., 1995, 70(1-3), 211-232.
    • (1995) Mathe. Prog , vol.70 , Issue.1-3 , pp. 211-232
    • Hane, C.A.1    Barnhart, C.2    Johnson, E.L.3
  • 16
    • 0032041236 scopus 로고    scopus 로고
    • The Extended enterprise - a context for manufacturing
    • Jagdev, H.S. and Browne, J., The Extended enterprise - a context for manufacturing. Prod. Plan. Cont., 1998, 9, 216-229.
    • (1998) Prod. Plan. Cont , vol.9 , pp. 216-229
    • Jagdev, H.S.1    Browne, J.2
  • 17
    • 0034694501 scopus 로고    scopus 로고
    • Lean, agile or league? Matching your supply chain to the market place
    • Jones, R.M., Naylor, J.B. and Towill, D.R., Lean, agile or league? Matching your supply chain to the market place. Int. J. Prod. Res., 2000, 38, 4061-4070.
    • (2000) Int. J. Prod. Res , vol.38 , pp. 4061-4070
    • Jones, R.M.1    Naylor, J.B.2    Towill, D.R.3
  • 18
    • 33746031638 scopus 로고
    • Integration of process planning and scheduling functions
    • Khoshnevis, B. and Chen, Q., Integration of process planning and scheduling functions. J. Intellig. Manufac., 1990, 1, 165-176.
    • (1990) J. Intellig. Manufac , vol.1 , pp. 165-176
    • Khoshnevis, B.1    Chen, Q.2
  • 19
    • 15844369427 scopus 로고    scopus 로고
    • Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling
    • Kim, K.W., Gen, M. and Yamazaki, G., Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling. Appl. Soft Com., 2003, 2/3F, 174-188.
    • (2003) Appl. Soft Com , vol.2 3F , pp. 174-188
    • Kim, K.W.1    Gen, M.2    Yamazaki, G.3
  • 20
    • 0034627935 scopus 로고    scopus 로고
    • Efficient methods for scheduling make-to-order assemblies under resource assembly area and part availability constraints
    • Kolisch, R. and Hess, K., Efficient methods for scheduling make-to-order assemblies under resource assembly area and part availability constraints. Int. J. Prod. Res., 2000, 38, 207-228.
    • (2000) Int. J. Prod. Res , vol.38 , pp. 207-228
    • Kolisch, R.1    Hess, K.2
  • 22
    • 0024066349 scopus 로고    scopus 로고
    • Selection of process plans in an automated manufacturing system
    • Kusiak, A. and Finke, G., Selection of process plans in an automated manufacturing system. IEEE J. Rob. Automat., 1998, 4, 397-402.
    • (1998) IEEE J. Rob. Automat , vol.4 , pp. 397-402
    • Kusiak, A.1    Finke, G.2
  • 23
    • 0035206678 scopus 로고    scopus 로고
    • Achieving lean supply through agile manufacturing
    • McCullen, P. and Towill, D., Achieving lean supply through agile manufacturing. J. Integ. Manufac. Sys., 2001, 12, 524-533.
    • (2001) J. Integ. Manufac. Sys , vol.12 , pp. 524-533
    • McCullen, P.1    Towill, D.2
  • 24
    • 29344456976 scopus 로고    scopus 로고
    • Mishra, S., Prakash, Tiwari, M.K. and Lashkari, R.S., A fuzzy goal programming model of machine tool selection and operation allocation problem in FMS: a quick converging simulated annealing based approach. Int. J. Prod. Res., 2006, 44, 43-76.
    • Mishra, S., Prakash, Tiwari, M.K. and Lashkari, R.S., A fuzzy goal programming model of machine tool selection and operation allocation problem in FMS: a quick converging simulated annealing based approach. Int. J. Prod. Res., 2006, 44, 43-76.
  • 25
    • 0036642595 scopus 로고    scopus 로고
    • Advanced planning and scheduling with outsourcing in manufacturing supply chain
    • Moon, C., Jeong, C.S. and Lee, Y.H., Advanced planning and scheduling with outsourcing in manufacturing supply chain. Comp. Indus. Eng., 2002, 43, 351-374.
    • (2002) Comp. Indus. Eng , vol.43 , pp. 351-374
    • Moon, C.1    Jeong, C.S.2    Lee, Y.H.3
  • 26
    • 0002528266 scopus 로고    scopus 로고
    • Developing lean and agile supply chains in the UK house building industry
    • Berkeley, CA, USA
    • Naim, M., Naylor, J.B. and Barlow, J. Developing lean and agile supply chains in the UK house building industry. Proceedings IGLC, University of California, Berkeley, CA, USA, 1999, 7, 159-170.
    • (1999) Proceedings IGLC, University of California , vol.7 , pp. 159-170
    • Naim, M.1    Naylor, J.B.2    Barlow, J.3
  • 27
    • 0025482435 scopus 로고
    • Job shop scheduling with alternative machines
    • Nasr, N. and Elsayed, A., Job shop scheduling with alternative machines. Int. J. Prod. Res., 1990, 28, 1595-1609.
    • (1990) Int. J. Prod. Res , vol.28 , pp. 1595-1609
    • Nasr, N.1    Elsayed, A.2
  • 28
    • 56349112164 scopus 로고    scopus 로고
    • Naylor, J.B., Naim, M. and Berry, D., Leagility: integrating the lean and agile manufacturing paradigm in the total supply chain MASTS working paper No. 47. Re-published in Int. J. Prod. Econ., 1999, 62, 07-118.
    • Naylor, J.B., Naim, M. and Berry, D., Leagility: integrating the lean and agile manufacturing paradigm in the total supply chain MASTS working paper No. 47. Re-published in Int. J. Prod. Econ., 1999, 62, 07-118.
  • 30
    • 0000481860 scopus 로고    scopus 로고
    • A simulated annealing approach to integrated production scheduling
    • Palmer, G.J., A simulated annealing approach to integrated production scheduling. J. Intel. Manufac., 1996, 7, 163-176.
    • (1996) J. Intel. Manufac , vol.7 , pp. 163-176
    • Palmer, G.J.1
  • 31
  • 32
    • 0022023671 scopus 로고
    • A branch and bound algorithm for the total weighted tardiness problem
    • Potts, C.N. and Van Wassenhove, L.N., A branch and bound algorithm for the total weighted tardiness problem. Oper. Res., 1985, 33, 363-377.
    • (1985) Oper. Res , vol.33 , pp. 363-377
    • Potts, C.N.1    Van Wassenhove, L.N.2
  • 33
    • 0038824825 scopus 로고    scopus 로고
    • Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis
    • Prince, J. and Kay, J.M., Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis. Int. J. Prod. Econ., 2003, 85, 305-318.
    • (2003) Int. J. Prod. Econ , vol.85 , pp. 305-318
    • Prince, J.1    Kay, J.M.2
  • 34
    • 0037085109 scopus 로고    scopus 로고
    • solving a fuzzy goal- programming model using a genetic algorithm
    • Machining-tool selection and operation allocation in FMS
    • Rai, R., Kameshwaran, S. and Tiwari, M.K., Machining-tool selection and operation allocation in FMS: solving a fuzzy goal- programming model using a genetic algorithm. Int. J. Prod. Res., 2002, 40, 641-665.
    • (2002) Int. J. Prod. Res , vol.40 , pp. 641-665
    • Rai, R.1    Kameshwaran, S.2    Tiwari, M.K.3
  • 35
    • 0030174355 scopus 로고    scopus 로고
    • Agile manufacturing: Beyond lean?
    • Richards, C.W., Agile manufacturing: beyond lean? Prod. Invent. Manag. J., 1996, 37(2), 60-64.
    • (1996) Prod. Invent. Manag. J , vol.37 , Issue.2 , pp. 60-64
    • Richards, C.W.1
  • 36
    • 3142674870 scopus 로고    scopus 로고
    • Mass customization in terms of the customer order decoupling point
    • Rudberg, M. and Wikner, J., Mass customization in terms of the customer order decoupling point. Prod. Plan. Cont., 2004, 15, 445-458.
    • (2004) Prod. Plan. Cont , vol.15 , pp. 445-458
    • Rudberg, M.1    Wikner, J.2
  • 37
    • 0038789200 scopus 로고    scopus 로고
    • The strategic integration of agile and lean supply
    • Stratton, R. and Warburton, R.D. H., The strategic integration of agile and lean supply. Int. J. Prod. Econ., 2003, 85, 183-198.
    • (2003) Int. J. Prod. Econ , vol.85 , pp. 183-198
    • Stratton, R.1    Warburton, R.D.H.2
  • 38
    • 0032143245 scopus 로고    scopus 로고
    • An integrated approach to solving the process plan selection problem in an automated manufacturing system
    • Tiwari, M.K. and Vidyarthi, N.K., An integrated approach to solving the process plan selection problem in an automated manufacturing system. Int. J. Prod. Res., 1998, 36, 2167-2184.
    • (1998) Int. J. Prod. Res , vol.36 , pp. 2167-2184
    • Tiwari, M.K.1    Vidyarthi, N.K.2
  • 40
    • 0002483817 scopus 로고    scopus 로고
    • Reconfiguring the supply chain to implement postponed manufacturing
    • Van, R.H., Reconfiguring the supply chain to implement postponed manufacturing. Int. J. Logist. Manag., 1998, 9, 95-100.
    • (1998) Int. J. Logist. Manag , vol.9 , pp. 95-100
    • Van, R.H.1
  • 41
    • 0011890210 scopus 로고    scopus 로고
    • Postponed manufacturing: A case study in the food supply chain
    • Van Hoek, R.I., Postponed manufacturing: a case study in the food supply chain". Sup. Chain Manag., 1997, 2, 63-75.
    • (1997) Sup. Chain Manag , vol.2 , pp. 63-75
    • Van Hoek, R.I.1
  • 42
    • 21844449924 scopus 로고    scopus 로고
    • Integrating production and engineering perspectives on the customer order decoupling point
    • Wikner, J. and Rudberg, M., Integrating production and engineering perspectives on the customer order decoupling point. Int. J. Oper. Prod. Manag., 2005, 25, 623-641.
    • (2005) Int. J. Oper. Prod. Manag , vol.25 , pp. 623-641
    • Wikner, J.1    Rudberg, M.2
  • 44
    • 0022097890 scopus 로고
    • Scheduling/rescheduling in the manufacturing operating system environment
    • Yamamoto, M. and Nof, S.Y., Scheduling/rescheduling in the manufacturing operating system environment. Int. J. Prod. Res., 1985, 23, 705-722.
    • (1985) Int. J. Prod. Res , vol.23 , pp. 705-722
    • Yamamoto, M.1    Nof, S.Y.2
  • 45
    • 0027151172 scopus 로고
    • IPPM - A prototype to integrate process planning and job shop scheduling functions
    • Zhang, H.C. and Mechant, M.E., IPPM - A prototype to integrate process planning and job shop scheduling functions. Ann. CIRP, 1993, 42, 513-518.
    • (1993) Ann. CIRP , vol.42 , pp. 513-518
    • Zhang, H.C.1    Mechant, M.E.2
  • 46
    • 0000944468 scopus 로고
    • An integrated model of process planning and production scheduling
    • Zhang, H.C. and Millur, S., An integrated model of process planning and production scheduling. Int. J. Comp. Int. Manufac, 1994, 7(6), 356-364.
    • (1994) Int. J. Comp. Int. Manufac , vol.7 , Issue.6 , pp. 356-364
    • Zhang, H.C.1    Millur, S.2
  • 47
    • 0031274424 scopus 로고    scopus 로고
    • Using genetic algorithm in process planning for job shop machining
    • Zhang, F., Zhang, Y.F. and Nee, A.Y. C., Using genetic algorithm in process planning for job shop machining. IEEE Trans. Evol. Comp., 1997, 1, 278-288.
    • (1997) IEEE Trans. Evol. Comp , vol.1 , pp. 278-288
    • Zhang, F.1    Zhang, Y.F.2    Nee, A.Y.C.3
  • 48
    • 0032156511 scopus 로고    scopus 로고
    • Customer-order-driven production: An economical concept for responding to demand uncertainty?
    • Zapfel, G., Customer-order-driven production: An economical concept for responding to demand uncertainty? Int. J. Prod. Econ., 1998, 56-57, 699-709.
    • (1998) Int. J. Prod. Econ , vol.56-57 , pp. 699-709
    • Zapfel, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.