-
1
-
-
0030232050
-
Integer linear programming and constraint programming compared
-
The progressive party problem
-
Barbara, M.S., Brailsford, S.C., Hubbard, P.M. and Williams, H.P., The progressive party problem: Integer linear programming and constraint programming compared. Constraints, 1996, 1, 119-138.
-
(1996)
Constraints
, vol.1
, pp. 119-138
-
-
Barbara, M.S.1
Brailsford, S.C.2
Hubbard, P.M.3
Williams, H.P.4
-
2
-
-
0025477779
-
Process plan selection
-
Bhaskaaran, K., Process plan selection. Int. J. Prod. Res., 1990, 28, 1527-1539.
-
(1990)
Int. J. Prod. Res
, vol.28
, pp. 1527-1539
-
-
Bhaskaaran, K.1
-
3
-
-
0004176585
-
-
Chapman and Hall: London
-
Bauer, A., Bowden, R., Browne, J., Duggan, J. and Lyons, G., Shop Floor Control Systems: From Design to Implementation, 1991 (Chapman and Hall: London).
-
(1991)
Shop Floor Control Systems: From Design to Implementation
-
-
Bauer, A.1
Bowden, R.2
Browne, J.3
Duggan, J.4
Lyons, G.5
-
4
-
-
4544225193
-
Process planning and scheduling for mass customized shoe manufacturing
-
Boër, C.R., Zangiacomi, A., Zhijian, L. and Sacco, M., Process planning and scheduling for mass customized shoe manufacturing. Int. J. Comp. Integ. Manufac., 2004, 17, 613-621.
-
(2004)
Int. J. Comp. Integ. Manufac
, vol.17
, pp. 613-621
-
-
Boër, C.R.1
Zangiacomi, A.2
Zhijian, L.3
Sacco, M.4
-
5
-
-
0029273131
-
Future manufacturing systems-towards the extended enterprise
-
Browne, J., Sackett, P.J. and Wortmann, J.C., Future manufacturing systems-towards the extended enterprise. Camp. Indust. Arch, 1995, 25, 235-254.
-
(1995)
Camp. Indust. Arch
, vol.25
, pp. 235-254
-
-
Browne, J.1
Sackett, P.J.2
Wortmann, J.C.3
-
6
-
-
0030274931
-
From lean to agile manufacturing
-
3/1-3/5
-
Bunce, P. and Gould, P., From lean to agile manufacturing. IEE Colloquium (Digest.), 1996, 278, 3/1-3/5.
-
(1996)
IEE Colloquium (Digest.)
, vol.278
-
-
Bunce, P.1
Gould, P.2
-
7
-
-
1642492010
-
Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time
-
Cai, X., Sun, X.Q. and Zhou, X., Stochastic scheduling with preemptive-repeat machine breakdowns to minimize the expected weighted flow time. Prob. Eng. Informat. Sci., 2003, 17, 467-485.
-
(2003)
Prob. Eng. Informat. Sci
, vol.17
, pp. 467-485
-
-
Cai, X.1
Sun, X.Q.2
Zhou, X.3
-
8
-
-
0035920341
-
Modeling for agile manufacturing systems
-
Chan, F.T. S. and Zhang, J.. Modeling for agile manufacturing systems. Int. J. Prod. Res., 2001, 39, 2313-2332.
-
(2001)
Int. J. Prod. Res
, vol.39
, pp. 2313-2332
-
-
Chan, F.T.S.1
Zhang, J.2
-
9
-
-
2642547919
-
Modeling of integrated, distributed and cooperative process planning system using an agent-based approach
-
Chan, F.T. S., Zhang, J. and Li, P., Modeling of integrated, distributed and cooperative process planning system using an agent-based approach. Proc. I MECHE Part B J. Eng. Manufac., 2001, 215, 1437-1451.
-
(2001)
Proc. I MECHE Part B J. Eng. Manufac
, vol.215
, pp. 1437-1451
-
-
Chan, F.T.S.1
Zhang, J.2
Li, P.3
-
10
-
-
0001634042
-
Supply chain migration from lean and functional to agile and customized
-
Christopher, M. and Towill, D., Supply chain migration from lean and functional to agile and customized. Int. J. Sup. Chain Manag., 2000, 5, 206-213.
-
(2000)
Int. J. Sup. Chain Manag
, vol.5
, pp. 206-213
-
-
Christopher, M.1
Towill, D.2
-
11
-
-
0032777406
-
Systems design framework for the extended enterprise
-
Davis, M., Systems design framework for the extended enterprise. Prod. Plan. Com., 1999, 10, 3-18.
-
(1999)
Prod. Plan. Com
, vol.10
, pp. 3-18
-
-
Davis, M.1
-
12
-
-
85042163696
-
A new optimization algorithm for the vehicle routing problem with time windows
-
Desrochers, M., Desrosiers, J. and Solomon, M., A new optimization algorithm for the vehicle routing problem with time windows. Oper. Res., 1992, 40, 342-354.
-
(1992)
Oper. Res
, vol.40
, pp. 342-354
-
-
Desrochers, M.1
Desrosiers, J.2
Solomon, M.3
-
13
-
-
0030134958
-
A survey of machine scheduling problems with blocking and no-wait in process
-
Hall, N.G. and Sriskandrajah, C., A survey of machine scheduling problems with blocking and no-wait in process. Oper. Res., 1996, 44, 510-525.
-
(1996)
Oper. Res
, vol.44
, pp. 510-525
-
-
Hall, N.G.1
Sriskandrajah, C.2
-
14
-
-
0029196321
-
The fleet assignment problem.: Solving a large-scale integer program
-
Hane, C.A., Barnhart, C., Johnson, E.L., et al., The fleet assignment problem.: solving a large-scale integer program. Mathe. Prog., 1995, 70(1-3), 211-232.
-
(1995)
Mathe. Prog
, vol.70
, Issue.1-3
, pp. 211-232
-
-
Hane, C.A.1
Barnhart, C.2
Johnson, E.L.3
-
16
-
-
0032041236
-
The Extended enterprise - a context for manufacturing
-
Jagdev, H.S. and Browne, J., The Extended enterprise - a context for manufacturing. Prod. Plan. Cont., 1998, 9, 216-229.
-
(1998)
Prod. Plan. Cont
, vol.9
, pp. 216-229
-
-
Jagdev, H.S.1
Browne, J.2
-
17
-
-
0034694501
-
Lean, agile or league? Matching your supply chain to the market place
-
Jones, R.M., Naylor, J.B. and Towill, D.R., Lean, agile or league? Matching your supply chain to the market place. Int. J. Prod. Res., 2000, 38, 4061-4070.
-
(2000)
Int. J. Prod. Res
, vol.38
, pp. 4061-4070
-
-
Jones, R.M.1
Naylor, J.B.2
Towill, D.R.3
-
18
-
-
33746031638
-
Integration of process planning and scheduling functions
-
Khoshnevis, B. and Chen, Q., Integration of process planning and scheduling functions. J. Intellig. Manufac., 1990, 1, 165-176.
-
(1990)
J. Intellig. Manufac
, vol.1
, pp. 165-176
-
-
Khoshnevis, B.1
Chen, Q.2
-
19
-
-
15844369427
-
Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling
-
Kim, K.W., Gen, M. and Yamazaki, G., Hybrid genetic algorithm with fuzzy logic for resource-constrained project scheduling. Appl. Soft Com., 2003, 2/3F, 174-188.
-
(2003)
Appl. Soft Com
, vol.2 3F
, pp. 174-188
-
-
Kim, K.W.1
Gen, M.2
Yamazaki, G.3
-
20
-
-
0034627935
-
Efficient methods for scheduling make-to-order assemblies under resource assembly area and part availability constraints
-
Kolisch, R. and Hess, K., Efficient methods for scheduling make-to-order assemblies under resource assembly area and part availability constraints. Int. J. Prod. Res., 2000, 38, 207-228.
-
(2000)
Int. J. Prod. Res
, vol.38
, pp. 207-228
-
-
Kolisch, R.1
Hess, K.2
-
21
-
-
0242493312
-
Scheduling of flexible manufacturing systems: An ant colony optimization approach
-
Kumar, R., Tiwari, M.K. and Shankar, R., Scheduling of flexible manufacturing systems: an ant colony optimization approach. Jour. Engi. Manu. - Proceedings of Institution of Mechanical Engineers Part B, 2003, 217, 1443-1453.
-
(2003)
Jour. Engi. Manu. - Proceedings of Institution of Mechanical Engineers Part B
, vol.217
, pp. 1443-1453
-
-
Kumar, R.1
Tiwari, M.K.2
Shankar, R.3
-
22
-
-
0024066349
-
Selection of process plans in an automated manufacturing system
-
Kusiak, A. and Finke, G., Selection of process plans in an automated manufacturing system. IEEE J. Rob. Automat., 1998, 4, 397-402.
-
(1998)
IEEE J. Rob. Automat
, vol.4
, pp. 397-402
-
-
Kusiak, A.1
Finke, G.2
-
23
-
-
0035206678
-
Achieving lean supply through agile manufacturing
-
McCullen, P. and Towill, D., Achieving lean supply through agile manufacturing. J. Integ. Manufac. Sys., 2001, 12, 524-533.
-
(2001)
J. Integ. Manufac. Sys
, vol.12
, pp. 524-533
-
-
McCullen, P.1
Towill, D.2
-
24
-
-
29344456976
-
-
Mishra, S., Prakash, Tiwari, M.K. and Lashkari, R.S., A fuzzy goal programming model of machine tool selection and operation allocation problem in FMS: a quick converging simulated annealing based approach. Int. J. Prod. Res., 2006, 44, 43-76.
-
Mishra, S., Prakash, Tiwari, M.K. and Lashkari, R.S., A fuzzy goal programming model of machine tool selection and operation allocation problem in FMS: a quick converging simulated annealing based approach. Int. J. Prod. Res., 2006, 44, 43-76.
-
-
-
-
25
-
-
0036642595
-
Advanced planning and scheduling with outsourcing in manufacturing supply chain
-
Moon, C., Jeong, C.S. and Lee, Y.H., Advanced planning and scheduling with outsourcing in manufacturing supply chain. Comp. Indus. Eng., 2002, 43, 351-374.
-
(2002)
Comp. Indus. Eng
, vol.43
, pp. 351-374
-
-
Moon, C.1
Jeong, C.S.2
Lee, Y.H.3
-
26
-
-
0002528266
-
Developing lean and agile supply chains in the UK house building industry
-
Berkeley, CA, USA
-
Naim, M., Naylor, J.B. and Barlow, J. Developing lean and agile supply chains in the UK house building industry. Proceedings IGLC, University of California, Berkeley, CA, USA, 1999, 7, 159-170.
-
(1999)
Proceedings IGLC, University of California
, vol.7
, pp. 159-170
-
-
Naim, M.1
Naylor, J.B.2
Barlow, J.3
-
27
-
-
0025482435
-
Job shop scheduling with alternative machines
-
Nasr, N. and Elsayed, A., Job shop scheduling with alternative machines. Int. J. Prod. Res., 1990, 28, 1595-1609.
-
(1990)
Int. J. Prod. Res
, vol.28
, pp. 1595-1609
-
-
Nasr, N.1
Elsayed, A.2
-
28
-
-
56349112164
-
-
Naylor, J.B., Naim, M. and Berry, D., Leagility: integrating the lean and agile manufacturing paradigm in the total supply chain MASTS working paper No. 47. Re-published in Int. J. Prod. Econ., 1999, 62, 07-118.
-
Naylor, J.B., Naim, M. and Berry, D., Leagility: integrating the lean and agile manufacturing paradigm in the total supply chain MASTS working paper No. 47. Re-published in Int. J. Prod. Econ., 1999, 62, 07-118.
-
-
-
-
30
-
-
0000481860
-
A simulated annealing approach to integrated production scheduling
-
Palmer, G.J., A simulated annealing approach to integrated production scheduling. J. Intel. Manufac., 1996, 7, 163-176.
-
(1996)
J. Intel. Manufac
, vol.7
, pp. 163-176
-
-
Palmer, G.J.1
-
31
-
-
56349153406
-
An algorithm for job shop scheduling problem with due date constraints considering operation subcontract
-
Park, J., Chung, D., Lee, K. and Shin, K. An algorithm for job shop scheduling problem with due date constraints considering operation subcontract, in Proceedings of the 25th ICPR International Conference, 2000.
-
(2000)
Proceedings of the 25th ICPR International Conference
-
-
Park, J.1
Chung, D.2
Lee, K.3
Shin, K.4
-
32
-
-
0022023671
-
A branch and bound algorithm for the total weighted tardiness problem
-
Potts, C.N. and Van Wassenhove, L.N., A branch and bound algorithm for the total weighted tardiness problem. Oper. Res., 1985, 33, 363-377.
-
(1985)
Oper. Res
, vol.33
, pp. 363-377
-
-
Potts, C.N.1
Van Wassenhove, L.N.2
-
33
-
-
0038824825
-
Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis
-
Prince, J. and Kay, J.M., Combining lean and agile characteristics: Creation of virtual groups by enhanced production flow analysis. Int. J. Prod. Econ., 2003, 85, 305-318.
-
(2003)
Int. J. Prod. Econ
, vol.85
, pp. 305-318
-
-
Prince, J.1
Kay, J.M.2
-
34
-
-
0037085109
-
solving a fuzzy goal- programming model using a genetic algorithm
-
Machining-tool selection and operation allocation in FMS
-
Rai, R., Kameshwaran, S. and Tiwari, M.K., Machining-tool selection and operation allocation in FMS: solving a fuzzy goal- programming model using a genetic algorithm. Int. J. Prod. Res., 2002, 40, 641-665.
-
(2002)
Int. J. Prod. Res
, vol.40
, pp. 641-665
-
-
Rai, R.1
Kameshwaran, S.2
Tiwari, M.K.3
-
35
-
-
0030174355
-
Agile manufacturing: Beyond lean?
-
Richards, C.W., Agile manufacturing: beyond lean? Prod. Invent. Manag. J., 1996, 37(2), 60-64.
-
(1996)
Prod. Invent. Manag. J
, vol.37
, Issue.2
, pp. 60-64
-
-
Richards, C.W.1
-
36
-
-
3142674870
-
Mass customization in terms of the customer order decoupling point
-
Rudberg, M. and Wikner, J., Mass customization in terms of the customer order decoupling point. Prod. Plan. Cont., 2004, 15, 445-458.
-
(2004)
Prod. Plan. Cont
, vol.15
, pp. 445-458
-
-
Rudberg, M.1
Wikner, J.2
-
37
-
-
0038789200
-
The strategic integration of agile and lean supply
-
Stratton, R. and Warburton, R.D. H., The strategic integration of agile and lean supply. Int. J. Prod. Econ., 2003, 85, 183-198.
-
(2003)
Int. J. Prod. Econ
, vol.85
, pp. 183-198
-
-
Stratton, R.1
Warburton, R.D.H.2
-
38
-
-
0032143245
-
An integrated approach to solving the process plan selection problem in an automated manufacturing system
-
Tiwari, M.K. and Vidyarthi, N.K., An integrated approach to solving the process plan selection problem in an automated manufacturing system. Int. J. Prod. Res., 1998, 36, 2167-2184.
-
(1998)
Int. J. Prod. Res
, vol.36
, pp. 2167-2184
-
-
Tiwari, M.K.1
Vidyarthi, N.K.2
-
39
-
-
0038693449
-
Flex plan - a concept for intelligent process planning and scheduling
-
Germany
-
Tonshoff, H.K., Beckendorff, U. and Andres, N. Flex plan - a concept for intelligent process planning and scheduling, in Proceedings of the CIRP International Workshop on Computer Aided Process Planning, Hanover University, Germany, 1989.
-
(1989)
Proceedings of the CIRP International Workshop on Computer Aided Process Planning, Hanover University
-
-
Tonshoff, H.K.1
Beckendorff, U.2
Andres, N.3
-
40
-
-
0002483817
-
Reconfiguring the supply chain to implement postponed manufacturing
-
Van, R.H., Reconfiguring the supply chain to implement postponed manufacturing. Int. J. Logist. Manag., 1998, 9, 95-100.
-
(1998)
Int. J. Logist. Manag
, vol.9
, pp. 95-100
-
-
Van, R.H.1
-
41
-
-
0011890210
-
Postponed manufacturing: A case study in the food supply chain
-
Van Hoek, R.I., Postponed manufacturing: a case study in the food supply chain". Sup. Chain Manag., 1997, 2, 63-75.
-
(1997)
Sup. Chain Manag
, vol.2
, pp. 63-75
-
-
Van Hoek, R.I.1
-
42
-
-
21844449924
-
Integrating production and engineering perspectives on the customer order decoupling point
-
Wikner, J. and Rudberg, M., Integrating production and engineering perspectives on the customer order decoupling point. Int. J. Oper. Prod. Manag., 2005, 25, 623-641.
-
(2005)
Int. J. Oper. Prod. Manag
, vol.25
, pp. 623-641
-
-
Wikner, J.1
Rudberg, M.2
-
44
-
-
0022097890
-
Scheduling/rescheduling in the manufacturing operating system environment
-
Yamamoto, M. and Nof, S.Y., Scheduling/rescheduling in the manufacturing operating system environment. Int. J. Prod. Res., 1985, 23, 705-722.
-
(1985)
Int. J. Prod. Res
, vol.23
, pp. 705-722
-
-
Yamamoto, M.1
Nof, S.Y.2
-
45
-
-
0027151172
-
IPPM - A prototype to integrate process planning and job shop scheduling functions
-
Zhang, H.C. and Mechant, M.E., IPPM - A prototype to integrate process planning and job shop scheduling functions. Ann. CIRP, 1993, 42, 513-518.
-
(1993)
Ann. CIRP
, vol.42
, pp. 513-518
-
-
Zhang, H.C.1
Mechant, M.E.2
-
46
-
-
0000944468
-
An integrated model of process planning and production scheduling
-
Zhang, H.C. and Millur, S., An integrated model of process planning and production scheduling. Int. J. Comp. Int. Manufac, 1994, 7(6), 356-364.
-
(1994)
Int. J. Comp. Int. Manufac
, vol.7
, Issue.6
, pp. 356-364
-
-
Zhang, H.C.1
Millur, S.2
-
47
-
-
0031274424
-
Using genetic algorithm in process planning for job shop machining
-
Zhang, F., Zhang, Y.F. and Nee, A.Y. C., Using genetic algorithm in process planning for job shop machining. IEEE Trans. Evol. Comp., 1997, 1, 278-288.
-
(1997)
IEEE Trans. Evol. Comp
, vol.1
, pp. 278-288
-
-
Zhang, F.1
Zhang, Y.F.2
Nee, A.Y.C.3
-
48
-
-
0032156511
-
Customer-order-driven production: An economical concept for responding to demand uncertainty?
-
Zapfel, G., Customer-order-driven production: An economical concept for responding to demand uncertainty? Int. J. Prod. Econ., 1998, 56-57, 699-709.
-
(1998)
Int. J. Prod. Econ
, vol.56-57
, pp. 699-709
-
-
Zapfel, G.1
|