-
1
-
-
0000955243
-
A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling
-
Brandimarte, P. and Calderini, M. (1995) 'A hierarchical bicriterion approach to integrated process plan selection and job shop scheduling', Int. Journal of Production Research, Vol. 33, No. 1, pp.161-181.
-
(1995)
Int. Journal of Production Research
, vol.33
, Issue.1
, pp. 161-181
-
-
Brandimarte, P.1
Calderini, M.2
-
2
-
-
84876152333
-
Scheduling with flexible process plans
-
Chen, Q. and Khoshnevis, B. (1993) 'Scheduling with flexible process plans', Production Planning and Control, Vol. 4, No. 4, pp.333-343.
-
(1993)
Production Planning and Control
, vol.4
, Issue.4
, pp. 333-343
-
-
Chen, Q.1
Khoshnevis, B.2
-
3
-
-
41549134688
-
A virtual factory based factory management with activity based costing in agile manufacturing environment
-
Ann Arbor, USA, pp
-
Fujii, S., Kaihara, T., Morita, H. and Usui, H. (2000) 'A virtual factory based factory management with activity based costing in agile manufacturing environment', Proc. Japan-USA FAC, Ann Arbor, USA, pp. 1-8.
-
(2000)
Proc. Japan-USA FAC
, pp. 1-8
-
-
Fujii, S.1
Kaihara, T.2
Morita, H.3
Usui, H.4
-
4
-
-
0036352425
-
Scheduling of flexible sequenced process plans in a mould manufacturing shop
-
Gan, P.Y. and Lee, K.S. (2002) 'Scheduling of flexible sequenced process plans in a mould manufacturing shop', Int. Journal of Advanced Manufacturing Technology, Vol. 20, pp.214-222.
-
(2002)
Int. Journal of Advanced Manufacturing Technology
, vol.20
, pp. 214-222
-
-
Gan, P.Y.1
Lee, K.S.2
-
5
-
-
0031121228
-
Bidding based process planning and scheduling in a multi-agent system
-
Gu, P., Balasubramanian, S. and Norrie, D.H. (1997) 'Bidding based process planning and scheduling in a multi-agent system', Computers and Industrial Engineering, Vol. 32, No. 2, pp.477-496.
-
(1997)
Computers and Industrial Engineering
, vol.32
, Issue.2
, pp. 477-496
-
-
Gu, P.1
Balasubramanian, S.2
Norrie, D.H.3
-
6
-
-
79251627866
-
A progressive approach for the integration of process planning and scheduling
-
Huang, S.H., Zhang, H.C. and Smith, M.L. (1995) 'A progressive approach for the integration of process planning and scheduling', IEEE Transactions, Vol. 27, No. 4, pp.456-464.
-
(1995)
IEEE Transactions
, vol.27
, Issue.4
, pp. 456-464
-
-
Huang, S.H.1
Zhang, H.C.2
Smith, M.L.3
-
7
-
-
0028079025
-
Random manufacturing system: A new concept of manufacturing systems for production to order
-
Iwata, K. (1994) 'Random manufacturing system: a new concept of manufacturing systems for production to order', Annals of the CIRP, Vol. 43, No. 1, pp.379-384.
-
(1994)
Annals of the CIRP
, vol.43
, Issue.1
, pp. 379-384
-
-
Iwata, K.1
-
8
-
-
0029733731
-
A collaborative process planning and scheduling system
-
Kempenaers, J., Pinte, J., Detand, J. and Kruth, J.P. (1996) 'A collaborative process planning and scheduling system', Advances in Engineering Software, Vol. 25, No. 1, pp.3-8.
-
(1996)
Advances in Engineering Software
, vol.25
, Issue.1
, pp. 3-8
-
-
Kempenaers, J.1
Pinte, J.2
Detand, J.3
Kruth, J.P.4
-
9
-
-
0027073047
-
A CAPP system for nonlinear process plans
-
Kruth, J.P. and Detand, J. (1992) 'A CAPP system for nonlinear process plans', Annals of CIRP, Vol. 41, No. 1, pp.489-492.
-
(1992)
Annals of CIRP
, vol.41
, Issue.1
, pp. 489-492
-
-
Kruth, J.P.1
Detand, J.2
-
10
-
-
79953758495
-
On-line integration of process planning module with production scheduling
-
Mamalis, A.G., Malagardis, I. and Kanbouris, K. (1996) 'On-line integration of process planning module with production scheduling', Int. Journal of Advanced Manufacturing Technology, Vol. 12, No. 5, pp.330-338.
-
(1996)
Int. Journal of Advanced Manufacturing Technology
, vol.12
, Issue.5
, pp. 330-338
-
-
Mamalis, A.G.1
Malagardis, I.2
Kanbouris, K.3
-
11
-
-
0003613932
-
Object oriented modeling of autonomous distributed manufacturing system and its application to real-time scheduling
-
Calgary, Canada, pp
-
Moriwaki, T. and Sugimura, N. (1992) 'Object oriented modeling of autonomous distributed manufacturing system and its application to real-time scheduling', Proc. ICOOMS'92, Calgary, Canada, pp.207-212.
-
(1992)
Proc. ICOOMS'92
, pp. 207-212
-
-
Moriwaki, T.1
Sugimura, N.2
-
12
-
-
0003384497
-
A prototyping of bionic manufacturing system
-
Calgary, Canada, pp
-
Okino, N. (1992) 'A prototyping of bionic manufacturing system', Proc. ICOOMS'92, Calgary, Canada, pp.297-302.
-
(1992)
Proc. ICOOMS'92
, pp. 297-302
-
-
Okino, N.1
-
13
-
-
0032648655
-
Integrating flexible process plans with scheduling in flexible manufacturing systems
-
Saygin, C. and Kilic, S.E. (1999) 'Integrating flexible process plans with scheduling in flexible manufacturing systems', Int. Journal of Advanced Manufacturing Technology, Vol. 15, No. 4, pp.268-280.
-
(1999)
Int. Journal of Advanced Manufacturing Technology
, vol.15
, Issue.4
, pp. 268-280
-
-
Saygin, C.1
Kilic, S.E.2
-
14
-
-
85133749042
-
Agent-based systems for intelligent manufacturing: A state of the art survey
-
Shen, W. and Norrie, D.H. (1999) 'Agent-based systems for intelligent manufacturing: a state of the art survey', Knowledge and Information Systems, Vol. 1, No. 2, pp. 129-156.
-
(1999)
Knowledge and Information Systems
, vol.1
, Issue.2
, pp. 129-156
-
-
Shen, W.1
Norrie, D.H.2
-
15
-
-
0003573348
-
-
Taylor & Francis, London, UK
-
Shen, W., Norrie, D.H. and Barthes, J.P. (2001) Multi-agent Systems for Concurrent Intelligent Design and Manufacturing, Taylor & Francis, London, UK.
-
(2001)
Multi-agent Systems for Concurrent Intelligent Design and Manufacturing
-
-
Shen, W.1
Norrie, D.H.2
Barthes, J.P.3
-
16
-
-
41549093604
-
A study on process planning system for holonic manufacturing - process planning considering both machining time and machining cost
-
Niigata, Japan, pp
-
Shrestha, R., Takemoto, T. and Sugimura, N. (2003) 'A study on process planning system for holonic manufacturing - process planning considering both machining time and machining cost', Proc. LEM21, Niigata, Japan, pp.753-756.
-
(2003)
Proc. LEM21
, pp. 753-756
-
-
Shrestha, R.1
Takemoto, T.2
Sugimura, N.3
-
17
-
-
0011606264
-
Modeling of holonic manufacturing system and its application to real-time scheduling
-
Sugimura, N., Moriwaki, T., Hozumi, K. and Shinohara, Y. (1996) 'Modeling of holonic manufacturing system and its application to real-time scheduling', Manufacturing Systems, Vol. 25, No. 4, pp. 1-8.
-
(1996)
Manufacturing Systems
, vol.25
, Issue.4
, pp. 1-8
-
-
Sugimura, N.1
Moriwaki, T.2
Hozumi, K.3
Shinohara, Y.4
-
18
-
-
0003120575
-
An approach to bionic manufacturing systems based on DNA-type information
-
Calgary, Canada, pp
-
Ueda, K. (1992) 'An approach to bionic manufacturing systems based on DNA-type information', Proc. ICOOMS'92, Calgary, Canada, pp.303-308.
-
(1992)
Proc. ICOOMS'92
, pp. 303-308
-
-
Ueda, K.1
-
19
-
-
0023399009
-
Priority rules for job shops with weighted tardiness costs
-
Vepsalainen, A.P.J, and Morton, T.E. (1987) 'Priority rules for job shops with weighted tardiness costs', Management Science, Vol. 33, No. 8, pp. 1035-1047.
-
(1987)
Management Science
, vol.33
, Issue.8
, pp. 1035-1047
-
-
Vepsalainen, A.P.J.1
Morton, T.E.2
-
21
-
-
0028014263
-
Decentral production scheduling of assembly systems with genetic algorithm
-
Wiendahl, E.P. and Garlichs, R. (1994) 'Decentral production scheduling of assembly systems with genetic algorithm', Annals of the CIRP, Vol. 43, No. 1, pp.389-396.
-
(1994)
Annals of the CIRP
, vol.43
, Issue.1
, pp. 389-396
-
-
Wiendahl, E.P.1
Garlichs, R.2
-
22
-
-
0029220198
-
The integration of process planning and shop floor scheduling in small batch part manufacturing
-
Zijm, W.H.M. (1995) 'The integration of process planning and shop floor scheduling in small batch part manufacturing', Annals of the CIRP, Vol. 44, No. 1, pp.429-432.
-
(1995)
Annals of the CIRP
, vol.44
, Issue.1
, pp. 429-432
-
-
Zijm, W.H.M.1
|