메뉴 건너뛰기




Volumn 31, Issue 3, 2009, Pages 234-253

Extending the RCPSP for modeling and solving disruption management problems

Author keywords

Applications; Disruption management; Genetic algorithms; Scheduling

Indexed keywords

CONCEPTUAL FRAMEWORKS; DECISION SUPPORTS; DISRUPTION MANAGEMENT; FAST CONVERGENCE; OPTIMAL SCHEDULE; PROCESS STEPS; PROCESS VARIANTS; REALLOCATION OF RESOURCES; RESOURCE REQUIREMENTS; RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM; TEMPORAL SHIFTS;

EID: 73149113759     PISSN: 0924669X     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10489-008-0119-x     Document Type: Article
Times cited : (38)

References (53)
  • 1
    • 0038898673 scopus 로고    scopus 로고
    • Collaborative decision making through dynamic information transfer
    • M Wambsganss 1997 Collaborative decision making through dynamic information transfer Air Traffic Control Q 4 107 123
    • (1997) Air Traffic Control Q , vol.4 , pp. 107-123
    • Wambsganss, M.1
  • 4
    • 18444402789 scopus 로고    scopus 로고
    • Evaluation of improved pushback forecasts derived from airline ground operations data
    • 10.2514/1.5730
    • F Carr G Theis J-P Clarke E Feron 2005 Evaluation of improved pushback forecasts derived from airline ground operations data J Aerosp Comput Inf Commun 2 1 25 43 10.2514/1.5730
    • (2005) J Aerosp Comput Inf Commun , vol.2 , Issue.1 , pp. 25-43
    • Carr, F.1    Theis, G.2    Clarke, J.-P.3    Feron, E.4
  • 5
    • 33744966565 scopus 로고    scopus 로고
    • Disruption management for machine scheduling: The case of SPT schedules
    • DOI 10.1016/j.ijpe.2005.05.021, PII S0925527305002136
    • X Qi JF Bard G Yu 2006 Disruption management for machine scheduling: The case of spt schedules Int J Prod Econ 103 1 166 184 10.1016/j.ijpe.2005.05.021 (Pubitemid 43866474)
    • (2006) International Journal of Production Economics , vol.103 , Issue.1 , pp. 166-184
    • Qi, X.1    Bard, J.F.2    Yu, G.3
  • 6
    • 84982522109 scopus 로고
    • Isis: A knowledge based system for factory scheduling
    • Fox MS, Smith S (1984) Isis: A knowledge based system for factory scheduling. Expert Syst 1(1)
    • (1984) Expert Syst , vol.1 , Issue.1
    • Fox, M.S.1    Smith, S.2
  • 8
    • 0027700624 scopus 로고
    • Scheduling and rescheduling with iterative repair
    • 10.1109/21.257756
    • M Zweben E Davis B Daun MJ Deale 1993 Scheduling and rescheduling with iterative repair IEEE Trans Syst Man Cybern 23 6 1588 1596 10.1109/21.257756
    • (1993) IEEE Trans Syst Man Cybern , vol.23 , Issue.6 , pp. 1588-1596
    • Zweben, M.1    Davis, E.2    Daun, B.3    Deale, M.J.4
  • 10
    • 44049112032 scopus 로고
    • Minimizing conflicts: A heuristic repair method for constraint satisfaction and scheduling problems
    • 0782.90054 10.1016/0004-3702(92)90007-K 1192398
    • S Minton MD Johnston AB Philips P Laird 1992 Minimizing conflicts: A heuristic repair method for constraint satisfaction and scheduling problems Artif Intell 58 1-3 161 205 0782.90054 10.1016/0004-3702(92)90007-K 1192398
    • (1992) Artif Intell , vol.58 , Issue.13 , pp. 161-205
    • Minton, S.1    Johnston, M.D.2    Philips, A.B.3    Laird, P.4
  • 11
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • 10.1126/science.220.4598.671 702485
    • S Kirkpatrick C Gelatt M Vecchi 1983 Optimization by simulated annealing Science 220 4589 671 680 10.1126/science.220.4598.671 702485
    • (1983) Science , vol.220 , Issue.4589 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.2    Vecchi, M.3
  • 12
    • 13444269168 scopus 로고    scopus 로고
    • Project scheduling under uncertainty: Survey and research potentials
    • DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
    • W Herroelen R Leus 2005 Project scheduling under uncertainty: Survey and research potentials Eur J Oper Res 165 289 306 1066.90050 10.1016/j.ejor.2004. 04.002 (Pubitemid 40206362)
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 289-306
    • Herroelen, W.1    Leus, R.2
  • 13
    • 34249890486 scopus 로고    scopus 로고
    • A classification of predictive-reactive project scheduling procedures
    • DOI 10.1007/s10951-007-0011-2, Special Issue: Project Scheduling Under Uncertainty
    • S Van de Vonder E Demeulemeester W Herroelen 2007 A classification of predictive-reactive project scheduling procedures J Sched 10 3 195 207 1168.90474 10.1007/s10951-007-0011-2 2323785 (Pubitemid 46866610)
    • (2007) Journal of Scheduling , vol.10 , Issue.3 , pp. 195-207
    • Van De Vonder, S.1    Demeulemeester, E.2    Herroelen, W.3
  • 14
    • 0242703954 scopus 로고    scopus 로고
    • Rescheduling manufacturing systems: A framework of strategies, policies, and methods
    • 1154.90500 10.1023/A:1022235519958 1999989
    • GE Vieira JW Herrmann E Lin 2003 Rescheduling manufacturing systems: a framework of strategies, policies, and methods J Sched 6 1 39 62 1154.90500 10.1023/A:1022235519958 1999989
    • (2003) J Sched , vol.6 , Issue.1 , pp. 39-62
    • Vieira, G.E.1    Herrmann, J.W.2    Lin, E.3
  • 15
    • 5144232431 scopus 로고    scopus 로고
    • Executing production schedules in the face of uncertainties: A review and some future directions
    • 1115.90025 10.1016/j.ejor.2003.08.027 2095874
    • H Aytug MA Lawley K McKay S Mohan R Uzsoy 2005 Executing production schedules in the face of uncertainties: A review and some future directions Eur J Oper Res 161 1 86 110 1115.90025 10.1016/j.ejor.2003.08.027 2095874
    • (2005) Eur J Oper Res , vol.161 , Issue.1 , pp. 86-110
    • Aytug, H.1    Lawley, M.A.2    McKay, K.3    Mohan, S.4    Uzsoy, R.5
  • 17
    • 84878632655 scopus 로고    scopus 로고
    • Disruption management for an airline-rescheduling of aircraft
    • Applications of evolutionary computing S. Cagnoni J. Gottlied E. Hart M. Middendorf G.R. Raidl (eds). Springer Berlin
    • Larsen J, Løve M, Sørensen KR, Clausen J (2002) Disruption management for an airline-rescheduling of aircraft. In: Cagnoni S, Gottlied J, Hart E, Middendorf M, Raidl GR (eds) Applications of evolutionary computing. Lecture notes in computer science, vol 2279. Springer, Berlin, pp 315-324
    • (2002) Lecture Notes in Computer Science , vol.2279 , pp. 315-324
    • Larsen, J.1    Løve, M.2    Sørensen, K.R.3    Clausen, J.4
  • 18
    • 70350619715 scopus 로고    scopus 로고
    • Using heuristics to solve the dedicated aircraft recovery problem
    • M Løve KR Sørensen J Larsen J Clausen 2005 Using heuristics to solve the dedicated aircraft recovery problem Cent Eur J Oper Res 13 2 189 207
    • (2005) Cent Eur J Oper Res , vol.13 , Issue.2 , pp. 189-207
    • Løve, M.1    Sørensen, K.R.2    Larsen, J.3    Clausen, J.4
  • 19
    • 24144493803 scopus 로고    scopus 로고
    • Disruption management in production planning
    • DOI 10.1002/nav.20087
    • J Yang X Qi G Yu 2005 Disruption management in production planning Nav Res Logist 52 5 420 442 1072.90520 10.1002/nav.20087 2147346 (Pubitemid 41228467)
    • (2005) Naval Research Logistics , vol.52 , Issue.5 , pp. 420-442
    • Yang, J.1    Qi, X.2    Yu, G.3
  • 20
    • 0000229534 scopus 로고
    • Matchup scheduling with multiple resources, release dates and disruptions
    • 0742.90041 10.1287/opre.39.3.470
    • J Bean J Birge J Mittenthal C Noon 1991 Matchup scheduling with multiple resources, release dates and disruptions Oper Res 39 470 483 0742.90041 10.1287/opre.39.3.470
    • (1991) Oper Res , vol.39 , pp. 470-483
    • Bean, J.1    Birge, J.2    Mittenthal, J.3    Noon, C.4
  • 21
    • 1642502335 scopus 로고    scopus 로고
    • Real-time disruption management in a two-stage production and inventory system
    • 10.1080/07408170490245379
    • Y Xia M-H Yang B Golany SM Gilbert G Yu 2004 Real-time disruption management in a two-stage production and inventory system IIE Trans 36 2 111 125 10.1080/07408170490245379
    • (2004) IIE Trans , vol.36 , Issue.2 , pp. 111-125
    • Xia, Y.1    Yang, M.-H.2    Golany, B.3    Gilbert, S.M.4    Yu, G.5
  • 23
    • 15844407876 scopus 로고    scopus 로고
    • Disruption management for resource-constrained project scheduling
    • DOI 10.1057/palgrave.jors.2601860
    • G Zhu JF Bard G Yu 2005 Disruption management for resource-constrained project scheduling J Oper Res Soc 56 365 381 1104.90025 10.1057/palgrave.jors. 2601860 (Pubitemid 40424112)
    • (2005) Journal of the Operational Research Society , vol.56 , Issue.4 , pp. 365-381
    • Zhu, G.1    Bard, J.F.2    Yu, G.3
  • 24
    • 85010916675 scopus 로고    scopus 로고
    • The demand disruption management problem for a supply chain system with nonlinear demand functions
    • 10.1007/s11518-006-0122-x
    • M Xu X Qi G Yu H Zhang C Gao 2003 The demand disruption management problem for a supply chain system with nonlinear demand functions J Syst Sci Syst Eng 12 1 82 97 10.1007/s11518-006-0122-x
    • (2003) J Syst Sci Syst Eng , vol.12 , Issue.1 , pp. 82-97
    • Xu, M.1    Qi, X.2    Yu, G.3    Zhang, H.4    Gao, C.5
  • 25
    • 1842660094 scopus 로고    scopus 로고
    • Supply chain coordination with demand disruptions
    • DOI 10.1016/j.omega.2003.12.002, PII S0305048303001658
    • X Qi JF Bard G Yu 2004 Supply chain coordination with demand disruptions Omega 32 301 312 10.1016/j.omega.2003.12.002 (Pubitemid 38461907)
    • (2004) Omega , vol.32 , Issue.4 , pp. 301-312
    • Qi, X.1    Bard, J.F.2    Yu, G.3
  • 27
    • 33645067716 scopus 로고    scopus 로고
    • The effects of schedule disruptions on the economics of airline operations
    • G.L. Donohue A. Zellweger (eds). AIAA Press Reston
    • Shavell ZA (2001) The effects of schedule disruptions on the economics of airline operations. In: Donohue GL, Zellweger A (eds) Air transportation systems engineering. AIAA Press, Reston
    • (2001) Air Transportation Systems Engineering
    • Shavell, Z.A.1
  • 28
    • 73149121487 scopus 로고    scopus 로고
    • A simulation based approach for contingency planning for aircraft turnaround operation system activities in airline hubs
    • S Adeleye C Chung 2006 A simulation based approach for contingency planning for aircraft turnaround operation system activities in airline hubs J Air Transp 11 2 140 155
    • (2006) J Air Transp , vol.11 , Issue.2 , pp. 140-155
    • Adeleye, S.1    Chung, C.2
  • 29
    • 1942506756 scopus 로고    scopus 로고
    • Modelling and simulation of aircraft turnaround operations at airports
    • DOI 10.1080/0308106042000184445
    • C-L Wu RE Caves 2004 Modelling and simulation of aircraft turnaround operations at airports Transp Plan Technol 27 1 25 46 10.1080/ 0308106042000184445 (Pubitemid 38517388)
    • (2004) Transportation Planning and Technology , vol.27 , Issue.1 , pp. 25-46
    • Wu, C.-L.1    Caves, R.E.2
  • 31
    • 0019342681 scopus 로고
    • Scheduling projects to resource constraints: Classification and complexity
    • 0516.68037 10.1016/0166-218X(83)90012-4 678815
    • J Błazewicz JK Lenstra A Rinnooy Kan 1983 Scheduling projects to resource constraints: Classification and complexity Discrete Appl Math 5 11 24 0516.68037 10.1016/0166-218X(83)90012-4 678815
    • (1983) Discrete Appl Math , vol.5 , pp. 11-24
    • Błazewicz, J.1    Lenstra, J.K.2    Rinnooy Kan, A.3
  • 32
    • 0032736579 scopus 로고    scopus 로고
    • Resource-constrained project scheduling: Notation, classification, models, and methods
    • 0937.90030 10.1016/S0377-2217(98)00204-5
    • P Brucker A Drexl R Möhring K Neumann E Pesch 1999 Resource-constrained project scheduling: Notation, classification, models, and methods Eur J Oper Res 112 3 41 0937.90030 10.1016/S0377-2217(98)00204-5
    • (1999) Eur J Oper Res , vol.112 , pp. 3-41
    • Brucker, P.1    Drexl, A.2    Möhring, R.3    Neumann, K.4    Pesch, E.5
  • 33
    • 33845270624 scopus 로고    scopus 로고
    • Experimental investigation of heuristics for resource-constrained project scheduling: An update
    • DOI 10.1016/j.ejor.2005.01.065, PII S0377221705002596
    • R Kolisch S Hartmann 2006 Experimental investigation of heuristics for resource-constrained project scheduling: An update Eur J Oper Res 174 23 37 1116.90047 10.1016/j.ejor.2005.01.065 (Pubitemid 44866841)
    • (2006) European Journal of Operational Research , vol.174 , Issue.1 , pp. 23-37
    • Kolisch, R.1    Hartmann, S.2
  • 34
    • 0035612930 scopus 로고    scopus 로고
    • Project scheduling with multiple modes: A genetic algorithm
    • 1024.90039 10.1023/A:1010902015091 1854421
    • S Hartmann 2001 Project scheduling with multiple modes: A genetic algorithm Ann Oper Res 102 1-4 111 135 1024.90039 10.1023/A:1010902015091 1854421
    • (2001) Ann Oper Res , vol.102 , Issue.14 , pp. 111-135
    • Hartmann, S.1
  • 35
    • 0038522575 scopus 로고    scopus 로고
    • Insertion techniques for static and dynamic resource constrained project scheduling
    • 1040.90013 10.1016/S0377-2217(02)00758-0 1993131
    • C Artigues P Michelon S Reusser 2003 Insertion techniques for static and dynamic resource constrained project scheduling Eur J Oper Res 149 249 267 1040.90013 10.1016/S0377-2217(02)00758-0 1993131
    • (2003) Eur J Oper Res , vol.149 , pp. 249-267
    • Artigues, C.1    Michelon, P.2    Reusser, S.3
  • 36
    • 33645989220 scopus 로고    scopus 로고
    • Constraint programming for dynamic scheduling problems
    • Kise H (ed.) Awaji, Hyogo, Japan
    • Elkhyari A, Guéret C, Jussien N (2004) Constraint programming for dynamic scheduling problems. In: Kise H (ed.) ISS'04 international scheduling symposium, Awaji, Hyogo, Japan, pp 84-89
    • (2004) ISS'04 International Scheduling Symposium , pp. 84-89
    • Elkhyari, A.1    Guéret, C.2    Jussien, N.3
  • 37
    • 0034250305 scopus 로고    scopus 로고
    • Constraint-directed techniques for scheduling alternative activities
    • DOI 10.1016/S0004-3702(00)00035-7
    • J Beck M Fox 2000 Constraint directed techniques for scheduling with alternative activities Artif Intel 121 211 250 0948.68009 10.1016/S0004-3702(00) 00035-7 1783518 (Pubitemid 30930585)
    • (2000) Artificial Intelligence , vol.121 , Issue.1 , pp. 211-250
    • Beck, J.C.1    Fox, M.S.2
  • 38
    • 0027641665 scopus 로고
    • A heuristic rescheduling algorithm for computer-based production scheduling systems
    • 10.1080/00207549308956824
    • R Li Y Shyu A Sadashiv 1993 A heuristic rescheduling algorithm for computer-based production scheduling systems Int J Prod Res 31 8 1815 1826 10.1080/00207549308956824
    • (1993) Int J Prod Res , vol.31 , Issue.8 , pp. 1815-1826
    • Li, R.1    Shyu, Y.2    Sadashiv, A.3
  • 39
    • 17744378973 scopus 로고    scopus 로고
    • Methods for operations planning in airport decision support systems
    • DOI 10.1007/s10791-005-6618-z
    • JG Herrero A Berlanga JM Molina 2005 Methods for operations planning in airport decision support systems Appl Intel 3 22 183 206 10.1007/s10791-005- 6618-z (Pubitemid 40573952)
    • (2005) Applied Intelligence , vol.22 , Issue.3 , pp. 183-206
    • Herrero, J.G.1    Berlanga, A.2    Molina, J.M.3    Casar, J.R.4
  • 41
    • 0036807111 scopus 로고    scopus 로고
    • An evolutionary algorithm for resource-constrained project scheduling
    • DOI 10.1109/TEVC.2002.804914
    • K Hindi H Yang K Fleszar 2002 An evolutionary algorithm for resource-constrained project scheduling IEEE Trans Evol Comput 6 5 512 518 10.1109/TEVC.2002.804914 (Pubitemid 35327566)
    • (2002) IEEE Transactions on Evolutionary Computation , vol.6 , Issue.5 , pp. 512-518
    • Hindi, K.S.1    Yang, H.2    Fleszar, K.3
  • 42
    • 0002030301 scopus 로고    scopus 로고
    • Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
    • J. Weglarz (eds). Kluwer Academic Dordrecht
    • Kolisch R, Hartmann S (1999) Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz J (ed) Project scheduling: recent models, algorithms, and applications. Kluwer Academic, Dordrecht, pp 147-178
    • (1999) Project Scheduling: Recent Models, Algorithms, and Applications , pp. 147-178
    • Kolisch, R.1    Hartmann, S.2
  • 43
    • 0032188522 scopus 로고    scopus 로고
    • A competitive genetic algorithm for resource-constrained project scheduling
    • 0936.90024 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0. CO;2-C 1643514
    • S Hartmann 1998 A competitive genetic algorithm for resource-constrained project scheduling Nav Res Logist 45 733 750 0936.90024 10.1002/(SICI)1520- 6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C 1643514
    • (1998) Nav Res Logist , vol.45 , pp. 733-750
    • Hartmann, S.1
  • 45
    • 0000698758 scopus 로고
    • Characterization and generation of a general class of resource-constrained project scheduling problems
    • 0870.90070 10.1287/mnsc.41.10.1693
    • R Kolisch A Sprecher A Drexl 1995 Characterization and generation of a general class of resource-constrained project scheduling problems Manag Sci 41 1693 1703 0870.90070 10.1287/mnsc.41.10.1693
    • (1995) Manag Sci , vol.41 , pp. 1693-1703
    • Kolisch, R.1    Sprecher, A.2    Drexl, A.3
  • 46
    • 0343496853 scopus 로고    scopus 로고
    • Using metaheuristics in multiobjective resource constrained project scheduling
    • DOI 10.1016/S0377-2217(99)00163-0
    • A Viana JP de Sousa 2000 Using metaheuristics in multiobjective resource constrained project scheduling Eur J Oper Res 120 2 359 374 0955.90037 10.1016/S0377-2217(99)00163-0 (Pubitemid 30542646)
    • (2000) European Journal of Operational Research , vol.120 , Issue.2 , pp. 359-374
    • Viana, A.1    Pinho De Sousa, J.2
  • 47
    • 33745775834 scopus 로고    scopus 로고
    • The trade off between diversity and quality for multi-objective workforce scheduling
    • Springer Berlin
    • Cowling P, Colledge N, Dahal K, Remde S (2006) The trade off between diversity and quality for multi-objective workforce scheduling. In: Lecture notes in computer science, vol 3906. Springer, Berlin, pp 13-24
    • (2006) Lecture Notes in Computer Science , vol.3906 , pp. 13-24
    • Cowling, P.1    Colledge, N.2    Dahal, K.3    Remde, S.4
  • 48
    • 33750370391 scopus 로고    scopus 로고
    • Complete MCS-based search: Application to resource constrained project scheduling
    • Kaelbling LP, Saffiotti A (Eds) Edinburgh, Scotland
    • Laborie P (2005) Complete MCS-based search: Application to resource constrained project scheduling. In: Kaelbling LP, Saffiotti A (eds) IJCAI-05 proceedings of nineteenth international joint conference on artificial intelligence, Edinburgh, Scotland, pp 181-186
    • (2005) IJCAI-05 Proceedings of Nineteenth International Joint Conference on Artificial Intelligence , pp. 181-186
    • Laborie, P.1
  • 49
    • 0038209741 scopus 로고    scopus 로고
    • Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
    • 1095.90541 10.1057/palgrave.jors.2601563
    • J Alcaraz C Maroto R Ruiz 2003 Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms J Oper Res Soc 54 6 614 626 1095.90541 10.1057/palgrave.jors.2601563
    • (2003) J Oper Res Soc , vol.54 , Issue.6 , pp. 614-626
    • Alcaraz, J.1    Maroto, C.2    Ruiz, R.3
  • 51
  • 52
    • 46249125844 scopus 로고    scopus 로고
    • Extending the resource-constrained project scheduling problem for disruption management
    • IEEE Press London. 10.1109/IS.2006.348400
    • Kuster J, Jannach D (2006) Extending the resource-constrained project scheduling problem for disruption management. In: Proceedings of the 3rd IEEE conference on intelligent systems. IEEE Press, London, pp 95-102
    • (2006) Proceedings of the 3rd IEEE Conference on Intelligent Systems , pp. 95-102
    • Kuster, J.1    Jannach, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.