1
-
-
0038898673
-
Collaborative decision making through dynamic information transfer
-
M Wambsganss 1997 Collaborative decision making through dynamic information transfer Air Traffic Control Q 4 107 123
-
(1997)
Air Traffic Control Q
, vol.4
, pp. 107-123
-
-
Wambsganss, M.1
-
2
-
-
4243059001
-
Collaborative decision making in air traffic flow management
-
Hoffman R, Ball M, Odoni A, Hall W, Wambsganss M (1999) Collaborative decision making in air traffic flow management, Technical Report, UC Berkeley
-
(1999)
Technical Report, UC Berkeley
-
-
Hoffman, R.1
Ball, M.2
Odoni, A.3
Hall, W.4
Wambsganss, M.5
-
4
-
-
18444402789
-
Evaluation of improved pushback forecasts derived from airline ground operations data
-
10.2514/1.5730
-
F Carr G Theis J-P Clarke E Feron 2005 Evaluation of improved pushback forecasts derived from airline ground operations data J Aerosp Comput Inf Commun 2 1 25 43 10.2514/1.5730
-
(2005)
J Aerosp Comput Inf Commun
, vol.2
, Issue.1
, pp. 25-43
-
-
Carr, F.1
Theis, G.2
Clarke, J.-P.3
Feron, E.4
-
5
-
-
33744966565
-
Disruption management for machine scheduling: The case of SPT schedules
-
DOI 10.1016/j.ijpe.2005.05.021, PII S0925527305002136
-
X Qi JF Bard G Yu 2006 Disruption management for machine scheduling: The case of spt schedules Int J Prod Econ 103 1 166 184 10.1016/j.ijpe.2005.05.021 (Pubitemid 43866474)
-
(2006)
International Journal of Production Economics
, vol.103
, Issue.1
, pp. 166-184
-
-
Qi, X.1
Bard, J.F.2
Yu, G.3
-
6
-
-
84982522109
-
Isis: A knowledge based system for factory scheduling
-
Fox MS, Smith S (1984) Isis: A knowledge based system for factory scheduling. Expert Syst 1(1)
-
(1984)
Expert Syst
, vol.1
, Issue.1
-
-
Fox, M.S.1
Smith, S.2
-
7
-
-
0025720329
-
Opis: An opportunistic factory scheduling system
-
ACM New York. 10.1145/98784.98830
-
Smith SF, Muscettola N, Matthys DC, Ow PS, Potvin J-Y (1990) Opis: An opportunistic factory scheduling system. In: IEA/AIE '90: Proc 3rd international conference on industrial and engineering applications of artificial intelligence and expert systems. ACM, New York, pp 268-274
-
(1990)
IEA/AIE '90: Proc 3rd International Conference on Industrial and Engineering Applications of Artificial Intelligence and Expert Systems
, pp. 268-274
-
-
Smith, S.F.1
Muscettola, N.2
Matthys, D.C.3
Ow, P.S.4
Potvin, J.-Y.5
-
8
-
-
0027700624
-
Scheduling and rescheduling with iterative repair
-
10.1109/21.257756
-
M Zweben E Davis B Daun MJ Deale 1993 Scheduling and rescheduling with iterative repair IEEE Trans Syst Man Cybern 23 6 1588 1596 10.1109/21.257756
-
(1993)
IEEE Trans Syst Man Cybern
, vol.23
, Issue.6
, pp. 1588-1596
-
-
Zweben, M.1
Davis, E.2
Daun, B.3
Deale, M.J.4
-
9
-
-
11844300901
-
The space shuttle ground processing scheduling system
-
M. Zweben M. Fox (eds). Morgan Kaufmann San Mateo
-
Deale M, Yvanovich M, Schnitzuius D, Kautz D, Carpenter M, Zweben M, Davis G, Daun B (1994) The space shuttle ground processing scheduling system. In: Zweben M, Fox M (eds) Intelligent scheduling. Morgan Kaufmann, San Mateo, pp 423-449
-
(1994)
Intelligent Scheduling
, pp. 423-449
-
-
Deale, M.1
Yvanovich, M.2
Schnitzuius, D.3
Kautz, D.4
Carpenter, M.5
Zweben, M.6
Davis, G.7
Daun, B.8
-
10
-
-
44049112032
-
Minimizing conflicts: A heuristic repair method for constraint satisfaction and scheduling problems
-
0782.90054 10.1016/0004-3702(92)90007-K 1192398
-
S Minton MD Johnston AB Philips P Laird 1992 Minimizing conflicts: A heuristic repair method for constraint satisfaction and scheduling problems Artif Intell 58 1-3 161 205 0782.90054 10.1016/0004-3702(92)90007-K 1192398
-
(1992)
Artif Intell
, vol.58
, Issue.13
, pp. 161-205
-
-
Minton, S.1
Johnston, M.D.2
Philips, A.B.3
Laird, P.4
-
11
-
-
26444479778
-
Optimization by simulated annealing
-
10.1126/science.220.4598.671 702485
-
S Kirkpatrick C Gelatt M Vecchi 1983 Optimization by simulated annealing Science 220 4589 671 680 10.1126/science.220.4598.671 702485
-
(1983)
Science
, vol.220
, Issue.4589
, pp. 671-680
-
-
Kirkpatrick, S.1
Gelatt, C.2
Vecchi, M.3
-
12
-
-
13444269168
-
Project scheduling under uncertainty: Survey and research potentials
-
DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
-
W Herroelen R Leus 2005 Project scheduling under uncertainty: Survey and research potentials Eur J Oper Res 165 289 306 1066.90050 10.1016/j.ejor.2004. 04.002 (Pubitemid 40206362)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
13
-
-
34249890486
-
A classification of predictive-reactive project scheduling procedures
-
DOI 10.1007/s10951-007-0011-2, Special Issue: Project Scheduling Under Uncertainty
-
S Van de Vonder E Demeulemeester W Herroelen 2007 A classification of predictive-reactive project scheduling procedures J Sched 10 3 195 207 1168.90474 10.1007/s10951-007-0011-2 2323785 (Pubitemid 46866610)
-
(2007)
Journal of Scheduling
, vol.10
, Issue.3
, pp. 195-207
-
-
Van De Vonder, S.1
Demeulemeester, E.2
Herroelen, W.3
-
14
-
-
0242703954
-
Rescheduling manufacturing systems: A framework of strategies, policies, and methods
-
1154.90500 10.1023/A:1022235519958 1999989
-
GE Vieira JW Herrmann E Lin 2003 Rescheduling manufacturing systems: a framework of strategies, policies, and methods J Sched 6 1 39 62 1154.90500 10.1023/A:1022235519958 1999989
-
(2003)
J Sched
, vol.6
, Issue.1
, pp. 39-62
-
-
Vieira, G.E.1
Herrmann, J.W.2
Lin, E.3
-
15
-
-
5144232431
-
Executing production schedules in the face of uncertainties: A review and some future directions
-
1115.90025 10.1016/j.ejor.2003.08.027 2095874
-
H Aytug MA Lawley K McKay S Mohan R Uzsoy 2005 Executing production schedules in the face of uncertainties: A review and some future directions Eur J Oper Res 161 1 86 110 1115.90025 10.1016/j.ejor.2003.08.027 2095874
-
(2005)
Eur J Oper Res
, vol.161
, Issue.1
, pp. 86-110
-
-
Aytug, H.1
Lawley, M.A.2
McKay, K.3
Mohan, S.4
Uzsoy, R.5
-
17
-
-
84878632655
-
Disruption management for an airline-rescheduling of aircraft
-
Applications of evolutionary computing S. Cagnoni J. Gottlied E. Hart M. Middendorf G.R. Raidl (eds). Springer Berlin
-
Larsen J, Løve M, Sørensen KR, Clausen J (2002) Disruption management for an airline-rescheduling of aircraft. In: Cagnoni S, Gottlied J, Hart E, Middendorf M, Raidl GR (eds) Applications of evolutionary computing. Lecture notes in computer science, vol 2279. Springer, Berlin, pp 315-324
-
(2002)
Lecture Notes in Computer Science
, vol.2279
, pp. 315-324
-
-
Larsen, J.1
Løve, M.2
Sørensen, K.R.3
Clausen, J.4
-
18
-
-
70350619715
-
Using heuristics to solve the dedicated aircraft recovery problem
-
M Løve KR Sørensen J Larsen J Clausen 2005 Using heuristics to solve the dedicated aircraft recovery problem Cent Eur J Oper Res 13 2 189 207
-
(2005)
Cent Eur J Oper Res
, vol.13
, Issue.2
, pp. 189-207
-
-
Løve, M.1
Sørensen, K.R.2
Larsen, J.3
Clausen, J.4
-
19
-
-
24144493803
-
Disruption management in production planning
-
DOI 10.1002/nav.20087
-
J Yang X Qi G Yu 2005 Disruption management in production planning Nav Res Logist 52 5 420 442 1072.90520 10.1002/nav.20087 2147346 (Pubitemid 41228467)
-
(2005)
Naval Research Logistics
, vol.52
, Issue.5
, pp. 420-442
-
-
Yang, J.1
Qi, X.2
Yu, G.3
-
20
-
-
0000229534
-
Matchup scheduling with multiple resources, release dates and disruptions
-
0742.90041 10.1287/opre.39.3.470
-
J Bean J Birge J Mittenthal C Noon 1991 Matchup scheduling with multiple resources, release dates and disruptions Oper Res 39 470 483 0742.90041 10.1287/opre.39.3.470
-
(1991)
Oper Res
, vol.39
, pp. 470-483
-
-
Bean, J.1
Birge, J.2
Mittenthal, J.3
Noon, C.4
-
21
-
-
1642502335
-
Real-time disruption management in a two-stage production and inventory system
-
10.1080/07408170490245379
-
Y Xia M-H Yang B Golany SM Gilbert G Yu 2004 Real-time disruption management in a two-stage production and inventory system IIE Trans 36 2 111 125 10.1080/07408170490245379
-
(2004)
IIE Trans
, vol.36
, Issue.2
, pp. 111-125
-
-
Xia, Y.1
Yang, M.-H.2
Golany, B.3
Gilbert, S.M.4
Yu, G.5
-
23
-
-
15844407876
-
Disruption management for resource-constrained project scheduling
-
DOI 10.1057/palgrave.jors.2601860
-
G Zhu JF Bard G Yu 2005 Disruption management for resource-constrained project scheduling J Oper Res Soc 56 365 381 1104.90025 10.1057/palgrave.jors. 2601860 (Pubitemid 40424112)
-
(2005)
Journal of the Operational Research Society
, vol.56
, Issue.4
, pp. 365-381
-
-
Zhu, G.1
Bard, J.F.2
Yu, G.3
-
24
-
-
85010916675
-
The demand disruption management problem for a supply chain system with nonlinear demand functions
-
10.1007/s11518-006-0122-x
-
M Xu X Qi G Yu H Zhang C Gao 2003 The demand disruption management problem for a supply chain system with nonlinear demand functions J Syst Sci Syst Eng 12 1 82 97 10.1007/s11518-006-0122-x
-
(2003)
J Syst Sci Syst Eng
, vol.12
, Issue.1
, pp. 82-97
-
-
Xu, M.1
Qi, X.2
Yu, G.3
Zhang, H.4
Gao, C.5
-
25
-
-
1842660094
-
Supply chain coordination with demand disruptions
-
DOI 10.1016/j.omega.2003.12.002, PII S0305048303001658
-
X Qi JF Bard G Yu 2004 Supply chain coordination with demand disruptions Omega 32 301 312 10.1016/j.omega.2003.12.002 (Pubitemid 38461907)
-
(2004)
Omega
, vol.32
, Issue.4
, pp. 301-312
-
-
Qi, X.1
Bard, J.F.2
Yu, G.3
-
27
-
-
33645067716
-
The effects of schedule disruptions on the economics of airline operations
-
G.L. Donohue A. Zellweger (eds). AIAA Press Reston
-
Shavell ZA (2001) The effects of schedule disruptions on the economics of airline operations. In: Donohue GL, Zellweger A (eds) Air transportation systems engineering. AIAA Press, Reston
-
(2001)
Air Transportation Systems Engineering
-
-
Shavell, Z.A.1
-
28
-
-
73149121487
-
A simulation based approach for contingency planning for aircraft turnaround operation system activities in airline hubs
-
S Adeleye C Chung 2006 A simulation based approach for contingency planning for aircraft turnaround operation system activities in airline hubs J Air Transp 11 2 140 155
-
(2006)
J Air Transp
, vol.11
, Issue.2
, pp. 140-155
-
-
Adeleye, S.1
Chung, C.2
-
29
-
-
1942506756
-
Modelling and simulation of aircraft turnaround operations at airports
-
DOI 10.1080/0308106042000184445
-
C-L Wu RE Caves 2004 Modelling and simulation of aircraft turnaround operations at airports Transp Plan Technol 27 1 25 46 10.1080/ 0308106042000184445 (Pubitemid 38517388)
-
(2004)
Transportation Planning and Technology
, vol.27
, Issue.1
, pp. 25-46
-
-
Wu, C.-L.1
Caves, R.E.2
-
31
-
-
0019342681
-
Scheduling projects to resource constraints: Classification and complexity
-
0516.68037 10.1016/0166-218X(83)90012-4 678815
-
J Błazewicz JK Lenstra A Rinnooy Kan 1983 Scheduling projects to resource constraints: Classification and complexity Discrete Appl Math 5 11 24 0516.68037 10.1016/0166-218X(83)90012-4 678815
-
(1983)
Discrete Appl Math
, vol.5
, pp. 11-24
-
-
Błazewicz, J.1
Lenstra, J.K.2
Rinnooy Kan, A.3
-
32
-
-
0032736579
-
Resource-constrained project scheduling: Notation, classification, models, and methods
-
0937.90030 10.1016/S0377-2217(98)00204-5
-
P Brucker A Drexl R Möhring K Neumann E Pesch 1999 Resource-constrained project scheduling: Notation, classification, models, and methods Eur J Oper Res 112 3 41 0937.90030 10.1016/S0377-2217(98)00204-5
-
(1999)
Eur J Oper Res
, vol.112
, pp. 3-41
-
-
Brucker, P.1
Drexl, A.2
Möhring, R.3
Neumann, K.4
Pesch, E.5
-
33
-
-
33845270624
-
Experimental investigation of heuristics for resource-constrained project scheduling: An update
-
DOI 10.1016/j.ejor.2005.01.065, PII S0377221705002596
-
R Kolisch S Hartmann 2006 Experimental investigation of heuristics for resource-constrained project scheduling: An update Eur J Oper Res 174 23 37 1116.90047 10.1016/j.ejor.2005.01.065 (Pubitemid 44866841)
-
(2006)
European Journal of Operational Research
, vol.174
, Issue.1
, pp. 23-37
-
-
Kolisch, R.1
Hartmann, S.2
-
34
-
-
0035612930
-
Project scheduling with multiple modes: A genetic algorithm
-
1024.90039 10.1023/A:1010902015091 1854421
-
S Hartmann 2001 Project scheduling with multiple modes: A genetic algorithm Ann Oper Res 102 1-4 111 135 1024.90039 10.1023/A:1010902015091 1854421
-
(2001)
Ann Oper Res
, vol.102
, Issue.14
, pp. 111-135
-
-
Hartmann, S.1
-
35
-
-
0038522575
-
Insertion techniques for static and dynamic resource constrained project scheduling
-
1040.90013 10.1016/S0377-2217(02)00758-0 1993131
-
C Artigues P Michelon S Reusser 2003 Insertion techniques for static and dynamic resource constrained project scheduling Eur J Oper Res 149 249 267 1040.90013 10.1016/S0377-2217(02)00758-0 1993131
-
(2003)
Eur J Oper Res
, vol.149
, pp. 249-267
-
-
Artigues, C.1
Michelon, P.2
Reusser, S.3
-
36
-
-
33645989220
-
Constraint programming for dynamic scheduling problems
-
Kise H (ed.) Awaji, Hyogo, Japan
-
Elkhyari A, Guéret C, Jussien N (2004) Constraint programming for dynamic scheduling problems. In: Kise H (ed.) ISS'04 international scheduling symposium, Awaji, Hyogo, Japan, pp 84-89
-
(2004)
ISS'04 International Scheduling Symposium
, pp. 84-89
-
-
Elkhyari, A.1
Guéret, C.2
Jussien, N.3
-
37
-
-
0034250305
-
Constraint-directed techniques for scheduling alternative activities
-
DOI 10.1016/S0004-3702(00)00035-7
-
J Beck M Fox 2000 Constraint directed techniques for scheduling with alternative activities Artif Intel 121 211 250 0948.68009 10.1016/S0004-3702(00) 00035-7 1783518 (Pubitemid 30930585)
-
(2000)
Artificial Intelligence
, vol.121
, Issue.1
, pp. 211-250
-
-
Beck, J.C.1
Fox, M.S.2
-
38
-
-
0027641665
-
A heuristic rescheduling algorithm for computer-based production scheduling systems
-
10.1080/00207549308956824
-
R Li Y Shyu A Sadashiv 1993 A heuristic rescheduling algorithm for computer-based production scheduling systems Int J Prod Res 31 8 1815 1826 10.1080/00207549308956824
-
(1993)
Int J Prod Res
, vol.31
, Issue.8
, pp. 1815-1826
-
-
Li, R.1
Shyu, Y.2
Sadashiv, A.3
-
39
-
-
17744378973
-
Methods for operations planning in airport decision support systems
-
DOI 10.1007/s10791-005-6618-z
-
JG Herrero A Berlanga JM Molina 2005 Methods for operations planning in airport decision support systems Appl Intel 3 22 183 206 10.1007/s10791-005- 6618-z (Pubitemid 40573952)
-
(2005)
Applied Intelligence
, vol.22
, Issue.3
, pp. 183-206
-
-
Herrero, J.G.1
Berlanga, A.2
Molina, J.M.3
Casar, J.R.4
-
41
-
-
0036807111
-
An evolutionary algorithm for resource-constrained project scheduling
-
DOI 10.1109/TEVC.2002.804914
-
K Hindi H Yang K Fleszar 2002 An evolutionary algorithm for resource-constrained project scheduling IEEE Trans Evol Comput 6 5 512 518 10.1109/TEVC.2002.804914 (Pubitemid 35327566)
-
(2002)
IEEE Transactions on Evolutionary Computation
, vol.6
, Issue.5
, pp. 512-518
-
-
Hindi, K.S.1
Yang, H.2
Fleszar, K.3
-
42
-
-
0002030301
-
Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis
-
J. Weglarz (eds). Kluwer Academic Dordrecht
-
Kolisch R, Hartmann S (1999) Heuristic algorithms for solving the resource-constrained project scheduling problem: Classification and computational analysis. In: Weglarz J (ed) Project scheduling: recent models, algorithms, and applications. Kluwer Academic, Dordrecht, pp 147-178
-
(1999)
Project Scheduling: Recent Models, Algorithms, and Applications
, pp. 147-178
-
-
Kolisch, R.1
Hartmann, S.2
-
43
-
-
0032188522
-
A competitive genetic algorithm for resource-constrained project scheduling
-
0936.90024 10.1002/(SICI)1520-6750(199810)45:7<733::AID-NAV5>3.0. CO;2-C 1643514
-
S Hartmann 1998 A competitive genetic algorithm for resource-constrained project scheduling Nav Res Logist 45 733 750 0936.90024 10.1002/(SICI)1520- 6750(199810)45:7<733::AID-NAV5>3.0.CO;2-C 1643514
-
(1998)
Nav Res Logist
, vol.45
, pp. 733-750
-
-
Hartmann, S.1
-
45
-
-
0000698758
-
Characterization and generation of a general class of resource-constrained project scheduling problems
-
0870.90070 10.1287/mnsc.41.10.1693
-
R Kolisch A Sprecher A Drexl 1995 Characterization and generation of a general class of resource-constrained project scheduling problems Manag Sci 41 1693 1703 0870.90070 10.1287/mnsc.41.10.1693
-
(1995)
Manag Sci
, vol.41
, pp. 1693-1703
-
-
Kolisch, R.1
Sprecher, A.2
Drexl, A.3
-
46
-
-
0343496853
-
Using metaheuristics in multiobjective resource constrained project scheduling
-
DOI 10.1016/S0377-2217(99)00163-0
-
A Viana JP de Sousa 2000 Using metaheuristics in multiobjective resource constrained project scheduling Eur J Oper Res 120 2 359 374 0955.90037 10.1016/S0377-2217(99)00163-0 (Pubitemid 30542646)
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 359-374
-
-
Viana, A.1
Pinho De Sousa, J.2
-
47
-
-
33745775834
-
The trade off between diversity and quality for multi-objective workforce scheduling
-
Springer Berlin
-
Cowling P, Colledge N, Dahal K, Remde S (2006) The trade off between diversity and quality for multi-objective workforce scheduling. In: Lecture notes in computer science, vol 3906. Springer, Berlin, pp 13-24
-
(2006)
Lecture Notes in Computer Science
, vol.3906
, pp. 13-24
-
-
Cowling, P.1
Colledge, N.2
Dahal, K.3
Remde, S.4
-
48
-
-
33750370391
-
Complete MCS-based search: Application to resource constrained project scheduling
-
Kaelbling LP, Saffiotti A (Eds) Edinburgh, Scotland
-
Laborie P (2005) Complete MCS-based search: Application to resource constrained project scheduling. In: Kaelbling LP, Saffiotti A (eds) IJCAI-05 proceedings of nineteenth international joint conference on artificial intelligence, Edinburgh, Scotland, pp 181-186
-
(2005)
IJCAI-05 Proceedings of Nineteenth International Joint Conference on Artificial Intelligence
, pp. 181-186
-
-
Laborie, P.1
-
49
-
-
0038209741
-
Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms
-
1095.90541 10.1057/palgrave.jors.2601563
-
J Alcaraz C Maroto R Ruiz 2003 Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms J Oper Res Soc 54 6 614 626 1095.90541 10.1057/palgrave.jors.2601563
-
(2003)
J Oper Res Soc
, vol.54
, Issue.6
, pp. 614-626
-
-
Alcaraz, J.1
Maroto, C.2
Ruiz, R.3
-
50
-
-
34548718103
-
Local rescheduling-a novel approach for efficient response to schedule disruptions
-
Honolulu, USA
-
Kuster J, Jannach D, Friedrich G (2007) Local rescheduling-a novel approach for efficient response to schedule disruptions. In: IEEE symposium on computational intelligence in scheduling, Honolulu, USA, pp 79-86
-
(2007)
IEEE Symposium on Computational Intelligence in Scheduling
, pp. 79-86
-
-
Kuster, J.1
Jannach, D.2
Friedrich, G.3
-
51
-
-
33746254848
-
Handling airport ground processes based on Resource-Constrained Project Scheduling
-
4031 LNAI DOI 10.1007/11779568-20, Advances in Applied Artificial Intelligence - 19th International Conference on Industrial, Engineering and Other Applications of Applied Intelligent Systems, IEA/AIE 2006, Proceedings
-
Kuster J, Jannach D (2006) Handling airport ground processes based on resource-constrained project scheduling. In: Ali M, Dapoigny R (eds) Advances in applied artificial intelligence. Lecture notes in computer science, vol 4031. Springer, Berlin, pp 166-176 (Pubitemid 44089664)
-
(2006)
Lecture Notes in Computer Science (Including Subseries Lecture Notes in Artificial Intelligence and Lecture Notes in Bioinformatics)
, pp. 166-176
-
-
Kuster, J.1
Jannach, D.2
-
52
-
-
46249125844
-
Extending the resource-constrained project scheduling problem for disruption management
-
IEEE Press London. 10.1109/IS.2006.348400
-
Kuster J, Jannach D (2006) Extending the resource-constrained project scheduling problem for disruption management. In: Proceedings of the 3rd IEEE conference on intelligent systems. IEEE Press, London, pp 95-102
-
(2006)
Proceedings of the 3rd IEEE Conference on Intelligent Systems
, pp. 95-102
-
-
Kuster, J.1
Jannach, D.2
-
53
-
-
84880856991
-
Handling alternative activities in resource-constrained project scheduling problems
-
Hyderabad, India
-
Kuster J, Jannach D, Friedrich G (2007) Handling alternative activities in resource-constrained project scheduling problems. In: IJCAI-07, proceedings of the twentieth international joint conference on artificial intelligence. Hyderabad, India, pp 1960-1965
-
(2007)
IJCAI-07, Proceedings of the Twentieth International Joint Conference on Artificial Intelligence
, pp. 1960-1965
-
-
Kuster, J.1
Jannach, D.2
Friedrich, G.3
|