2
-
-
84866126262
-
Rethinking Project Definition in terms of Target Costing
-
Santiago, Chile, July, 2006
-
th annual Congress, International Group for Lean Construction, Santiago, Chile, July, 2006, pp 77-90. Also available at www.iglc.net.
-
(2006)
th Annual Congress, International Group for Lean Construction
, pp. 77-90
-
-
Ballard, G.1
-
3
-
-
85026631062
-
The Lean Delivery System as a Strategy for Adding Value in Construction Projects
-
October 2007
-
Ballard, Glenn (2007). “The Lean Delivery System as a Strategy for Adding Value in Construction Projects”. SIBRAGEC, Campinas, Brazil, October 2007.
-
(2007)
SIBRAGEC, Campinas, Brazil
-
-
Ballard, G.1
-
8
-
-
0010520821
-
-
Royal Academy of Engineering: London
-
Evans, R., Haryott, R., Haste, N., and Jones, A.(1998). “The long term costs of owning and using buildings”. Royal Academy of Engineering: London
-
(1998)
The Long Term Costs of Owning and Using Buildings
-
-
Evans, R.1
Haryott, R.2
Haste, N.3
Jones, A.4
-
9
-
-
33646367878
-
“Re-examining the costs and value ratios of owning and occupying buildings
-
Ive, qq and qq Graham (2006). “Re-examining the costs and value ratios of owning and occupying buildings, Building Research & Information, qq
-
(2006)
Building Research & Information
-
-
Ive, Q.1
Graham, Q.2
-
10
-
-
51849142024
-
-
Working Paper 102, Center for Integrated Facilities Engineering, Stanford University, October 2006
-
Khanzode, Atul, Timo Hartmann, Martin Fischer, Dean Reed and John Mack (2006). “Guidelines to perform MEP/FP Coordination using Virtual Design and Construction (3D/4D) Tools”. Working Paper 102, Center for Integrated Facilities Engineering, Stanford University, October 2006.
-
(2006)
Guidelines to Perform MEP/FP Coordination Using Virtual Design and Construction (3D/4D) Tools
-
-
Khanzode, A.1
Hartmann, T.2
Fischer, M.3
Reed, D.4
Mack, J.5
-
14
-
-
4644333148
-
-
McGraw-Hill, New York, NY
-
Liker, Jeffrey (2004). The Toyota Way. McGraw-Hill, New York, NY. 330 p.
-
(2004)
The Toyota Way
, pp. 330
-
-
Liker, J.1
-
17
-
-
85026646216
-
“The ‘Quarterback Rating’ for Projects
-
St. Louis, Missouri, June 12-13, 2008
-
Morton, Scott (2008). “The ‘Quarterback Rating’ for Projects”. Presented at the Lean Construction Institute’s Design Forum meeting, St. Louis, Missouri, June 12-13, 2008. Available at www.leanconstruction.org/files.
-
(2008)
Presented at the Lean Construction Institute’s Design Forum Meeting
-
-
Morton, S.1
-
18
-
-
0034562014
-
Can Target Costing and Whole Life Costing be Applied in the Construction Industry?”: Evidence from Two Case Studies
-
Nicolini, D. & C. Tompkins & R. Holti & A. Oldman & M. Smalley (2000). ”Can Target Costing and Whole Life Costing be Applied in the Construction Industry?”: Evidence from Two Case Studies. British Journal of Management, Vol. 11.
-
(2000)
British Journal of Management
, vol.11
-
-
Nicolini, D.1
Tompkins, C.2
Holti, R.3
Oldman, A.4
Smalley, M.5
-
21
-
-
84856683982
-
Determining Expected Cost in the Target Costing Process
-
Manchester, U.K., July 18-20, 2008
-
th Annual Conference, International Group for Lean Construction, Manchester, U.K., July 18-20, 2008. 12 p.
-
(2008)
th Annual Conference, International Group for Lean Construction
, pp. 12
-
-
Pennanen, A.1
Ballard, G.2
-
22
-
-
85026633164
-
-
University of California, Berkeley’s Project Production Systems Laboratory website
-
p2sl.berkeley.edu (University of California, Berkeley’s Project Production Systems Laboratory website)
-
-
-
-
24
-
-
85026639942
-
ThedaCare Shawano Ambulatory Care Center: Lean Continuous Improvement Implementation
-
Toussaint, Susan (2006). ThedaCare Shawano Ambulatory Care Center: Lean Continuous Improvement Implementation. Boldt Construction Company, November 3, 2006.
-
(2006)
Boldt Construction Company, November
, vol.3
, pp. 2006
-
-
Toussaint, S.1
-
25
-
-
84880789949
-
The Role of the Physical Environment in the Hospital of the 21st Century: A Once-in-a-Lifetime Opportunity
-
September 2004
-
Ulrich, R., C. Zimring, X. Quan, A. Joseph and R. Choudhary (2004). The Role of the Physical Environment in the Hospital of the 21st Century: A Once-in-a-Lifetime Opportunity. Center for Health Design: September 2004.
-
(2004)
Center for Health Design
-
-
Ulrich, R.1
Zimring, C.2
Quan, X.3
Joseph, A.4
Choudhary, R.5
-
27
-
-
0002533915
-
-
Sloan Management Review, Spring
-
Ward, Allen, Jeffrey K. Liker, John J. Cristiano, and Durward K. Sobek II (1995). “The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster”. Sloan Management Review, Spring 1995, pp. 43-61.
-
(1995)
The Second Toyota Paradox: How Delaying Decisions Can Make Better Cars Faster
, pp. 43-61
-
-
Ward, A.1
Liker, J.K.2
Cristiano, J.J.3
Sobek, D.K.4
|