Volumn 2008, Issue , 2008, Pages 1-19

The lean project delivery system: An update

Author keywords

Lean project delivery; Project business plan; Project business plan validation; Set based design; Target cost

Indexed keywords

CONSTRUCTION INDUSTRY; PRODUCT DESIGN;

EID: 69949101125     PISSN: None     EISSN: 15551369     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (231)

References (27)
  • 3
    • 85026631062 scopus 로고    scopus 로고
    • The Lean Delivery System as a Strategy for Adding Value in Construction Projects
    • October 2007
    • Ballard, Glenn (2007). “The Lean Delivery System as a Strategy for Adding Value in Construction Projects”. SIBRAGEC, Campinas, Brazil, October 2007.
    • (2007) SIBRAGEC, Campinas, Brazil
    • Ballard, G.1
  • 9
    • 33646367878 scopus 로고    scopus 로고
    • “Re-examining the costs and value ratios of owning and occupying buildings
    • Ive, qq and qq Graham (2006). “Re-examining the costs and value ratios of owning and occupying buildings, Building Research & Information, qq
    • (2006) Building Research & Information
    • Ive, Q.1    Graham, Q.2
  • 14
    • 4644333148 scopus 로고    scopus 로고
    • McGraw-Hill, New York, NY
    • Liker, Jeffrey (2004). The Toyota Way. McGraw-Hill, New York, NY. 330 p.
    • (2004) The Toyota Way , pp. 330
    • Liker, J.1
  • 17
    • 85026646216 scopus 로고    scopus 로고
    • “The ‘Quarterback Rating’ for Projects
    • St. Louis, Missouri, June 12-13, 2008
    • Morton, Scott (2008). “The ‘Quarterback Rating’ for Projects”. Presented at the Lean Construction Institute’s Design Forum meeting, St. Louis, Missouri, June 12-13, 2008. Available at www.leanconstruction.org/files.
    • (2008) Presented at the Lean Construction Institute’s Design Forum Meeting
    • Morton, S.1
  • 18
    • 0034562014 scopus 로고    scopus 로고
    • Can Target Costing and Whole Life Costing be Applied in the Construction Industry?”: Evidence from Two Case Studies
    • Nicolini, D. & C. Tompkins & R. Holti & A. Oldman & M. Smalley (2000). ”Can Target Costing and Whole Life Costing be Applied in the Construction Industry?”: Evidence from Two Case Studies. British Journal of Management, Vol. 11.
    • (2000) British Journal of Management , vol.11
    • Nicolini, D.1    Tompkins, C.2    Holti, R.3    Oldman, A.4    Smalley, M.5
  • 22
    • 85026633164 scopus 로고    scopus 로고
    • University of California, Berkeley’s Project Production Systems Laboratory website
    • p2sl.berkeley.edu (University of California, Berkeley’s Project Production Systems Laboratory website)
  • 24
    • 85026639942 scopus 로고    scopus 로고
    • ThedaCare Shawano Ambulatory Care Center: Lean Continuous Improvement Implementation
    • Toussaint, Susan (2006). ThedaCare Shawano Ambulatory Care Center: Lean Continuous Improvement Implementation. Boldt Construction Company, November 3, 2006.
    • (2006) Boldt Construction Company, November , vol.3 , pp. 2006
    • Toussaint, S.1
  • 25
    • 84880789949 scopus 로고    scopus 로고
    • The Role of the Physical Environment in the Hospital of the 21st Century: A Once-in-a-Lifetime Opportunity
    • September 2004
    • Ulrich, R., C. Zimring, X. Quan, A. Joseph and R. Choudhary (2004). The Role of the Physical Environment in the Hospital of the 21st Century: A Once-in-a-Lifetime Opportunity. Center for Health Design: September 2004.
    • (2004) Center for Health Design
    • Ulrich, R.1    Zimring, C.2    Quan, X.3    Joseph, A.4    Choudhary, R.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.