메뉴 건너뛰기




Volumn 24, Issue 4, 2009, Pages 1818-1830

Coordination of midterm outage scheduling with short-term security-constrained unit commitment

Author keywords

Generation and transmission maintenance scheduling; Lagrangian relaxation; Mixed integer programming; Security constrained unit commitment

Indexed keywords

CO-OPERATION STRATEGY; GENERATION AND TRANSMISSION MAINTENANCE SCHEDULING; GENERATION MAINTENANCE SCHEDULING; GENERATION UNITS; LAGRANGIAN RELAXATION; LAGRANGIAN RELAXATION TECHNIQUES; LOAD CURVES; MAINTENANCE SCHEDULING; MIXED INTEGER PROGRAMMING; NUMERICAL EXAMPLE; OPTIMIZATION PROBLEMS; OUTAGE SCHEDULING; SECURITY-CONSTRAINED UNIT COMMITMENT; SUB-PROBLEMS;

EID: 70350714241     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2009.2030289     Document Type: Article
Times cited : (62)

References (35)
  • 2
    • 27744451561 scopus 로고    scopus 로고
    • Impact of security on power systems operation
    • Nov
    • M. Shahidehpour, W. F. Tinney, and Y. Fu, "Impact of security on power systems operation," Proc. IEEE, vol. 93, no. 11, pp. 2013-2025, Nov. 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.11 , pp. 2013-2025
    • Shahidehpour, M.1    Tinney, W.F.2    Fu, Y.3
  • 3
    • 70350722987 scopus 로고    scopus 로고
    • California ISO, Online, Available
    • California ISO, "Forced Outage Reporting Requirement" and "Outage Coordination Protocol". [Online]. Available: http://www.caiso.com.
    • Forced Outage Reporting Requirement
  • 4
    • 70350713367 scopus 로고    scopus 로고
    • Electric Reliability Council of Texas ERCOT, Online, Available
    • Electric Reliability Council of Texas (ERCOT), "Resource Outage Process" and "Transmission Outage Approval Process". [Online]. Available: http://www.ercot.com.
    • Resource Outage Process
  • 5
    • 70350727551 scopus 로고    scopus 로고
    • Midwest ISO, Online, Available
    • Midwest ISO, Outage Scheduler V. 4.2. [Online]. Available: http:// www.midwestiso.org.
    • Outage Scheduler V. 4.2
  • 6
    • 70350727681 scopus 로고    scopus 로고
    • Online, Available
    • ISO New England, "Transmission Outage Scheduling" and "Generation Maintenance and Outage Scheduling". [Online]. Available: http://www.iso-ne.com.
    • Transmission Outage Scheduling
  • 8
    • 70350711181 scopus 로고    scopus 로고
    • eDART and Transmission Outage Transmission Outage Training" and "Generation Outage Reporting and eDART
    • PJM, Online, Available
    • PJM, "eDART and Transmission Outage Transmission Outage Training" and "Generation Outage Reporting and eDART". [Online]. Available: http://www.pjm.com.
  • 9
    • 0015285628 scopus 로고
    • A technique for the automated scheduling of the maintenance of generating facilities
    • Jan./Feb
    • W. Christiaanse and A. Palmer, "A technique for the automated scheduling of the maintenance of generating facilities," IEEE Trans. Power App. Syst., vol. PAS-91, no. 1, pp. 137-144, Jan./Feb. 1972.
    • (1972) IEEE Trans. Power App. Syst , vol.PAS-91 , Issue.1 , pp. 137-144
    • Christiaanse, W.1    Palmer, A.2
  • 10
    • 0006844518 scopus 로고
    • A method for planning economic unit commitment and maintenance of thermal power systems
    • May
    • K. Hara, M. Kimura, and N. Honda, "A method for planning economic unit commitment and maintenance of thermal power systems," IEEE Trans. Power App. Syst., vol. PAS-85, no. 5, pp. 427-436, May 1966.
    • (1966) IEEE Trans. Power App. Syst , vol.PAS-85 , Issue.5 , pp. 427-436
    • Hara, K.1    Kimura, M.2    Honda, N.3
  • 11
    • 0015398090 scopus 로고
    • Adjusting maintenance schedules to levelize risk
    • Sep./Oct
    • L. Garver, "Adjusting maintenance schedules to levelize risk," IEEE Trans. Power App. Syst., vol. PAS-91, no. 5, pp. 2057-2063, Sep./Oct. 1972.
    • (1972) IEEE Trans. Power App. Syst , vol.PAS-91 , Issue.5 , pp. 2057-2063
    • Garver, L.1
  • 12
    • 0031343384 scopus 로고    scopus 로고
    • A review of generator maintenance scheduling using artificial intelligence techniques
    • UMIST, Manchester, U.K
    • K. Dahal and J. McDonald, "A review of generator maintenance scheduling using artificial intelligence techniques," in Proc. 32nd Universities Power Engineering Conf., UMIST, Manchester, U.K., 1997, vol. 2, pp. 787-90.
    • (1997) Proc. 32nd Universities Power Engineering Conf , vol.2 , pp. 787-790
    • Dahal, K.1    McDonald, J.2
  • 13
    • 70350737141 scopus 로고    scopus 로고
    • B. Choueiry and Y. Sekine, Knowledge based method for power generators maintenance scheduling, Expert Syst. Appl. Power Syst., pp. 9.7-9.14, 1988.
    • B. Choueiry and Y. Sekine, "Knowledge based method for power generators maintenance scheduling," Expert Syst. Appl. Power Syst., pp. 9.7-9.14, 1988.
  • 14
    • 0026153980 scopus 로고
    • Maintenance scheduling by using simulated annealing method
    • May
    • T. Satoh and K. Nara, "Maintenance scheduling by using simulated annealing method," IEEE Trans. Power Syst., vol. 6, no. 2, pp. 850-857, May 1991.
    • (1991) IEEE Trans. Power Syst , vol.6 , Issue.2 , pp. 850-857
    • Satoh, T.1    Nara, K.2
  • 15
    • 0026889708 scopus 로고
    • Fuzzy approach for generator maintenance scheduling
    • J. Huang and E. Lin, "Fuzzy approach for generator maintenance scheduling," Elect. Power Syst. Res., no. 24, pp. 31-38, 1992.
    • (1992) Elect. Power Syst. Res , Issue.24 , pp. 31-38
    • Huang, J.1    Lin, E.2
  • 16
    • 0032024826 scopus 로고    scopus 로고
    • A genetic-evolved fuzzy system for maintenance scheduling of generating units
    • S. Huang, "A genetic-evolved fuzzy system for maintenance scheduling of generating units," Int. J. Elect. Power Energy Syst., vol. 20, no. 3, pp. 191-195, 1998.
    • (1998) Int. J. Elect. Power Energy Syst , vol.20 , Issue.3 , pp. 191-195
    • Huang, S.1
  • 17
    • 0032623533 scopus 로고    scopus 로고
    • Automatic scheduling method using tabu search for maintenance outage tasks of transmission and substation system with network constraints
    • Feb
    • T. Sawa, T. Furukawa, M. Nomoto, T. Nagasawa, T. Sasaki, K. Deno, and T. Maekawa, "Automatic scheduling method using tabu search for maintenance outage tasks of transmission and substation system with network constraints," in Proc. IEEE Power Eng. Soc, 1999 Winter Meeting, Feb. 1999, vol. 2, pp. 895-900.
    • (1999) Proc. IEEE Power Eng. Soc, 1999 Winter Meeting , vol.2 , pp. 895-900
    • Sawa, T.1    Furukawa, T.2    Nomoto, M.3    Nagasawa, T.4    Sasaki, T.5    Deno, K.6    Maekawa, T.7
  • 18
    • 0032657632 scopus 로고    scopus 로고
    • Unit maintenance scheduling in open systems using genetic algorithm
    • Y. Wang and E. Handschin, "Unit maintenance scheduling in open systems using genetic algorithm," in Proc. IEEE Transmission and Distribution Conf., 1999, vol. 1, pp. 334-339.
    • (1999) Proc. IEEE Transmission and Distribution Conf , vol.1 , pp. 334-339
    • Wang, Y.1    Handschin, E.2
  • 19
    • 0033907831 scopus 로고    scopus 로고
    • A new genetic algorithm for unit maintenance scheduling of power systems
    • May
    • Y. Wang and E. Handschin, "A new genetic algorithm for unit maintenance scheduling of power systems," Int. J. Elect. Power Energy Syst., vol. 22, no. 5, pp. 343-348, May 2000.
    • (2000) Int. J. Elect. Power Energy Syst , vol.22 , Issue.5 , pp. 343-348
    • Wang, Y.1    Handschin, E.2
  • 20
    • 0031078395 scopus 로고    scopus 로고
    • An algorithm for thermal unit maintenance scheduling through combined use of GA, SA, and TS
    • Feb
    • H. Kim, Y. Hayashi, and K. Nara, "An algorithm for thermal unit maintenance scheduling through combined use of GA, SA, and TS," IEEE Trans. Power Syst., vol. 12, no. 1, pp. 329-335, Feb. 1997.
    • (1997) IEEE Trans. Power Syst , vol.12 , Issue.1 , pp. 329-335
    • Kim, H.1    Hayashi, Y.2    Nara, K.3
  • 21
    • 0029405654 scopus 로고
    • A systems approach to least-cost maintenance scheduling for an interconnected power system
    • Nov
    • D. Chattopadhyay, K. Bhattacharya, and J. Parikh, "A systems approach to least-cost maintenance scheduling for an interconnected power system," IEEE Trans. Power Syst., vol. 10, no. 4, pp. 2002-2007, Nov. 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.4 , pp. 2002-2007
    • Chattopadhyay, D.1    Bhattacharya, K.2    Parikh, J.3
  • 22
    • 0016552456 scopus 로고
    • Optimal generator maintenance scheduling using integer programming
    • Sep./Oct
    • J. Dopazo and H. Merrill, "Optimal generator maintenance scheduling using integer programming," IEEE Trans. Power App. Syst., vol. PAS-94, no. 5, pp. 1537-1545, Sep./Oct. 1975.
    • (1975) IEEE Trans. Power App. Syst , vol.PAS-94 , Issue.5 , pp. 1537-1545
    • Dopazo, J.1    Merrill, H.2
  • 23
    • 0025462882 scopus 로고
    • New maintenance scheduling method with production cost minimization via integer linear programming
    • K. Edwin and F. Curtius, "New maintenance scheduling method with production cost minimization via integer linear programming," Int. J. Elect. Power Energy Syst., vol. 12, pp. 165-170, 1990.
    • (1990) Int. J. Elect. Power Energy Syst , vol.12 , pp. 165-170
    • Edwin, K.1    Curtius, F.2
  • 24
    • 0026203507 scopus 로고
    • Optimal generating unit maintenance scheduling for multi-area system with network constraints
    • Aug
    • L. Chen and J. Toyoda, "Optimal generating unit maintenance scheduling for multi-area system with network constraints," IEEE Trans. Power Syst., vol. 6, no. 3, pp. 1168-1174, Aug. 1991.
    • (1991) IEEE Trans. Power Syst , vol.6 , Issue.3 , pp. 1168-1174
    • Chen, L.1    Toyoda, J.2
  • 25
    • 0030703971 scopus 로고    scopus 로고
    • A decomposition approach to generation maintenance scheduling with network constraints
    • Apr
    • M. Marwali, M. Shahidehpour, and V. Ramesh, "A decomposition approach to generation maintenance scheduling with network constraints," in Proc. Amer. Power Conf., Apr. 1997, vol. 59-I, pp. 110-115.
    • (1997) Proc. Amer. Power Conf , vol.59-I , pp. 110-115
    • Marwali, M.1    Shahidehpour, M.2    Ramesh, V.3
  • 26
    • 0026868528 scopus 로고
    • A decomposition approach to unit maintenance scheduling
    • May
    • J. Yellen, T. Al-Khamis, S. Vemuri, and L. Lemonidis, "A decomposition approach to unit maintenance scheduling," IEEE Trans. Power Syst. vol. 7, no. 2, pp. 726-733, May 1992.
    • (1992) IEEE Trans. Power Syst , vol.7 , Issue.2 , pp. 726-733
    • Yellen, J.1    Al-Khamis, T.2    Vemuri, S.3    Lemonidis, L.4
  • 27
    • 0016990741 scopus 로고
    • An experimental method of determination of optimal maintenance schedules in power systems using the branch and bound techniques
    • Aug
    • G. Egan, T. Dillon, and K. Morsztyn, "An experimental method of determination of optimal maintenance schedules in power systems using the branch and bound techniques," IEEE Trans. Syst., Man, Cybern. vol. SMC-6, no. 8, pp. 538-547, Aug. 1976.
    • (1976) IEEE Trans. Syst., Man, Cybern , vol.SMC-6 , Issue.8 , pp. 538-547
    • Egan, G.1    Dillon, T.2    Morsztyn, K.3
  • 28
    • 0016474937 scopus 로고
    • Generator maintenance scheduling via successive approximation dynamic programming
    • Mar./Apr
    • H. Zurn and V. Quintana, "Generator maintenance scheduling via successive approximation dynamic programming," IEEE Trans. Power App. Syst., vol. PAS-94, no. 1, pp. 665-671, Mar./Apr. 1975.
    • (1975) IEEE Trans. Power App. Syst , vol.PAS-94 , Issue.1 , pp. 665-671
    • Zurn, H.1    Quintana, V.2
  • 29
    • 0037708871 scopus 로고    scopus 로고
    • Short-term generating unit maintenance scheduling in a restructured power system using a probabilistic approach
    • Jul
    • R. Billinton and A. Abdulwahab, "Short-term generating unit maintenance scheduling in a restructured power system using a probabilistic approach," Proc. Inst. Elect. Eng., Gen., Transm., Distrib., vol. 150, no. 4, pp. 463-468, Jul. 2003.
    • (2003) Proc. Inst. Elect. Eng., Gen., Transm., Distrib , vol.150 , Issue.4 , pp. 463-468
    • Billinton, R.1    Abdulwahab, A.2
  • 30
    • 13844309961 scopus 로고    scopus 로고
    • Composite system maintenance coordination in a deregulated environment
    • Feb
    • R. Billinton and R. Mo, "Composite system maintenance coordination in a deregulated environment," IEEE Trans. Power Syst., vol. 20, no. 1, pp. 485-492, Feb. 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.1 , pp. 485-492
    • Billinton, R.1    Mo, R.2
  • 31
    • 33847153509 scopus 로고    scopus 로고
    • Coordinated maintenance scheduling of Gencos and Transcos in restructured power systems
    • Apr
    • T. Geetha and K. Swarup, "Coordinated maintenance scheduling of Gencos and Transcos in restructured power systems," in Proc. IEEE Power India Conf., Apr. 2006.
    • (2006) Proc. IEEE Power India Conf
    • Geetha, T.1    Swarup, K.2
  • 32
    • 0032138729 scopus 로고    scopus 로고
    • Integrated generation and transmission maintenance scheduling with network constraints
    • Aug
    • M. Marwali and M. Shahidehpour, "Integrated generation and transmission maintenance scheduling with network constraints," IEEE Trans. Power Syst., vol. 13, no. 3, pp. 1063-1068, Aug. 1998.
    • (1998) IEEE Trans. Power Syst , vol.13 , Issue.3 , pp. 1063-1068
    • Marwali, M.1    Shahidehpour, M.2
  • 33
    • 34548036523 scopus 로고    scopus 로고
    • Security-constrained optimal coordination of generation and transmission maintenance outage scheduling
    • Aug
    • Y. Fu, M. Shahidehpour, and Z. Li, "Security-constrained optimal coordination of generation and transmission maintenance outage scheduling," IEEE Trans. Power Syst., vol. 22, no. 3, pp. 1302-1313, Aug. 2007.
    • (2007) IEEE Trans. Power Syst , vol.22 , Issue.3 , pp. 1302-1313
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 34
    • 18944385771 scopus 로고    scopus 로고
    • Security-constrained unit commitment with AC constraints
    • Aug
    • Y. Fu, M. Shahidehpour, and Z. Li, "Security-constrained unit commitment with AC constraints," IEEE Trans. Power Syst., vol. 20, no. 3, pp. 1538-1550, Aug. 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.3 , pp. 1538-1550
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 35
    • 33646379100 scopus 로고    scopus 로고
    • AC contingency dispatch based on security-constrained unit commitment
    • May
    • Y. Fu, M. Shahidehpour, and Z. Li, "AC contingency dispatch based on security-constrained unit commitment," IEEE Trans. Power Syst., vol. 21, no. 2, pp. 897-908, May 2006.
    • (2006) IEEE Trans. Power Syst , vol.21 , Issue.2 , pp. 897-908
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.