|
Volumn 2, Issue , 1999, Pages 895-900
|
Automatic scheduling method using tabu search for maintenance outage tasks of transmission and substation system with network constraints
a a a a a a a
a
HITACHI LTD
(Japan)
|
Author keywords
[No Author keywords available]
|
Indexed keywords
COMBINATORIAL MATHEMATICS;
CONSTRAINT THEORY;
ELECTRIC POWER TRANSMISSION;
ELECTRIC SWITCHES;
MAINTENANCE;
OPTIMIZATION;
OUTAGES;
SCHEDULING;
AUTOMATIC SCHEDULING METHODS;
TABU SEARCH;
ELECTRIC POWER SYSTEMS;
|
EID: 0032623533
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/pesw.1999.747287 Document Type: Conference Paper |
Times cited : (27)
|
References (10)
|