|
Volumn 2005, Issue , 2005, Pages 213-220
|
Coordinated maintenance scheduling of gencos and transcos in restructured power systems
|
Author keywords
Bender's decomposition; Coordination; Coordination penalty factors; ELNS (Expected Load Not Served); Forced outage rates; Lagrangian relaxation method; Loss index matrix; Risk penalty factors; Transmission constraints
|
Indexed keywords
ELECTRIC ENERGY STORAGE;
ELECTRIC LOADS;
OUTAGES;
PREVENTIVE MAINTENANCE;
STANDARDS;
BENDER'S DECOMPOSITION;
COORDINATION;
COORDINATION PENALTY FACTORS;
FORCED OUTAGE RATES;
LAGRANGIAN RELAXATION METHOD;
LOSS INDEX MATRIX;
RISK PENALTY FACTORS;
TRANSMISSION CONSTRAINTS;
ELECTRIC POWER SYSTEMS;
|
EID: 33847153509
PISSN: None
EISSN: None
Source Type: Conference Proceeding
DOI: 10.1109/POWERI.2006.1632515 Document Type: Conference Paper |
Times cited : (6)
|
References (9)
|