메뉴 건너뛰기




Volumn 22, Issue 3, 2007, Pages 1302-1313

Security-constrained optimal coordination of generation and transmission maintenance outage scheduling

Author keywords

Lagrangian relaxation; Maintenance outage scheduling for generators and transmission lines; Mixed integer programming; Resource allocation and utilization; Transmission network security; Unit commitment

Indexed keywords

ELECTRIC GENERATORS; ELECTRIC POWER GENERATION; ELECTRIC POWER TRANSMISSION; INTEGER PROGRAMMING; MAINTENANCE; OUTAGES; RESOURCE ALLOCATION; SCHEDULING;

EID: 34548036523     PISSN: 08858950     EISSN: None     Source Type: Journal    
DOI: 10.1109/TPWRS.2007.901673     Document Type: Article
Times cited : (101)

References (20)
  • 3
    • 85046376018 scopus 로고    scopus 로고
    • NERC, Online, Available
    • NERC, Policy 4: System Coordination, 2005. [Online]. Available: http://www.nerc.com.
    • (2005) Policy 4: System Coordination
  • 5
    • 0029307589 scopus 로고
    • Coordination of long- and short-term generation planning in thermal power systems
    • May
    • J. Handke, E. Handschin, K. Linke, and H. H. Sanders, "Coordination of long- and short-term generation planning in thermal power systems," IEEE Trans. Power Syst., vol. 10, no. 2, pp. 803-809, May 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.2 , pp. 803-809
    • Handke, J.1    Handschin, E.2    Linke, K.3    Sanders, H.H.4
  • 6
    • 21244446325 scopus 로고    scopus 로고
    • Impact of natural gas infrastructure on electric power systems
    • May
    • M. Shahidehpour, Y. Fu, and T. Wiedman, "Impact of natural gas infrastructure on electric power systems," Proc. IEEE, vol. 93, no. 5, pp. 1042-1056, May 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.5 , pp. 1042-1056
    • Shahidehpour, M.1    Fu, Y.2    Wiedman, T.3
  • 7
    • 0029407966 scopus 로고
    • Summary of the panel session: Coordination between short-term operation scheduling and annual resource allocations
    • Nov
    • J. Gardner, W. Hobbs, F. N. Lee, E. Leslie, D. Streiffert, and D. Todd, "Summary of the panel session: Coordination between short-term operation scheduling and annual resource allocations," IEEE Trans. Power Syst., vol. 10, no. 4, pp. 1879-1889, Nov. 1995.
    • (1995) IEEE Trans. Power Syst , vol.10 , Issue.4 , pp. 1879-1889
    • Gardner, J.1    Hobbs, W.2    Lee, F.N.3    Leslie, E.4    Streiffert, D.5    Todd, D.6
  • 8
    • 0025521068 scopus 로고
    • Unit commitment in thermal power systems with long-term energy constraints
    • Nov
    • E. Handschin and H. Slomski, "Unit commitment in thermal power systems with long-term energy constraints," IEEE Trans. Power Syst., vol. 5, no. 4, pp. 1470-1477, Nov. 1990.
    • (1990) IEEE Trans. Power Syst , vol.5 , Issue.4 , pp. 1470-1477
    • Handschin, E.1    Slomski, H.2
  • 9
    • 0026818580 scopus 로고
    • Fuel constrained unit commitment
    • Feb
    • S. Vemuri and L. Lemonidis, "Fuel constrained unit commitment," IEEE Trans. Power Syst., vol. 7, no. 1, pp. 410-415, Feb. 1992.
    • (1992) IEEE Trans. Power Syst , vol.7 , Issue.1 , pp. 410-415
    • Vemuri, S.1    Lemonidis, L.2
  • 10
    • 0041784238 scopus 로고    scopus 로고
    • Transmission constrained unit commitment based on Benders decomposition
    • Apr
    • H. Ma and M. Shahidehpour, "Transmission constrained unit commitment based on Benders decomposition," Elect. Power Energy Syst., vol. 20, no. 4, pp. 287-294, Apr. 1998.
    • (1998) Elect. Power Energy Syst , vol.20 , Issue.4 , pp. 287-294
    • Ma, H.1    Shahidehpour, M.2
  • 11
    • 18944385771 scopus 로고    scopus 로고
    • Security-constrained unit commitment with AC constraints
    • Aug
    • Y. Fu, M. Shahidehpour, and Z. Li, "Security-constrained unit commitment with AC constraints," IEEE Trans. Power Syst., vol. 20, no. 3, pp. 1538-1550, Aug. 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.3 , pp. 1538-1550
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 12
    • 18944379628 scopus 로고    scopus 로고
    • Generation maintenance scheduling in restructured power systems
    • May
    • A. J. Conejo, R. Garcia-Bertrand, and M. Diaz-Salazar, "Generation maintenance scheduling in restructured power systems," IEEE Trans. Power Syst., vol. 20, no. 2, pp. 984-992, May 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.2 , pp. 984-992
    • Conejo, A.J.1    Garcia-Bertrand, R.2    Diaz-Salazar, M.3
  • 13
    • 27744451561 scopus 로고    scopus 로고
    • Impact of security on power systems operation
    • Nov
    • M. Shahidehpour, W. F. Tinney, and Y. Fu, "Impact of security on power systems operation," Proc. IEEE, vol. 93, no. 11, pp. 2013-2025, Nov. 2005.
    • (2005) Proc. IEEE , vol.93 , Issue.11 , pp. 2013-2025
    • Shahidehpour, M.1    Tinney, W.F.2    Fu, Y.3
  • 14
    • 16244405919 scopus 로고    scopus 로고
    • Benders decomposition - Applying Benders decomposition to power systems
    • Mar./Apr
    • M. Shahidehpour and Y. Fu, "Benders decomposition - Applying Benders decomposition to power systems," IEEE Power Energy Mag., vol. 3, no. 2, pp. 20-21, Mar./Apr. 2005.
    • (2005) IEEE Power Energy Mag , vol.3 , Issue.2 , pp. 20-21
    • Shahidehpour, M.1    Fu, Y.2
  • 15
    • 0034186789 scopus 로고    scopus 로고
    • Generation maintenance scheduling considering transmission constraints
    • May
    • E. L. Da Silva, M. Th. Schilling, and M. C. Rafael, "Generation maintenance scheduling considering transmission constraints," IEEE Trans. Power Syst., vol. 15, no. 2, pp. 838-843, May 2000.
    • (2000) IEEE Trans. Power Syst , vol.15 , Issue.2 , pp. 838-843
    • Da Silva, E.L.1    Schilling, M.T.2    Rafael, M.C.3
  • 16
    • 0001391104 scopus 로고
    • Decomposition principle for linear programs
    • G. B. Dantzig and P. Wolfe, "Decomposition principle for linear programs," Oper. Res., vol. 8, pp. 101-111, 1960.
    • (1960) Oper. Res , vol.8 , pp. 101-111
    • Dantzig, G.B.1    Wolfe, P.2
  • 17
    • 33646379100 scopus 로고    scopus 로고
    • AC contingency dispatch based on security-constrained unit commitment
    • May
    • Y. Fu, M. Shahidehpour, and Z. Li, "AC contingency dispatch based on security-constrained unit commitment," IEEE Trans. Power Syst., vol. 21, no. 2, pp. 897-908, May 2007.
    • (2007) IEEE Trans. Power Syst , vol.21 , Issue.2 , pp. 897-908
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 18
    • 28244477409 scopus 로고    scopus 로고
    • Long-term security-constrained unit commitment: Hybrid subgradient and Danzig-Wolfe decomposition
    • Nov
    • Y. Fu, M. Shahidehpour, and Z. Li, "Long-term security-constrained unit commitment: Hybrid subgradient and Danzig-Wolfe decomposition," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 2093-2106, Nov. 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.4 , pp. 2093-2106
    • Fu, Y.1    Shahidehpour, M.2    Li, Z.3
  • 19
    • 28244479344 scopus 로고    scopus 로고
    • Price-based unit commitment: A case of Lagrangian relaxation versus mixed integer programming
    • Nov
    • T. Li and M. Shahidehpour, "Price-based unit commitment: A case of Lagrangian relaxation versus mixed integer programming," IEEE Trans. Power Syst., vol. 20, no. 4, pp. 2015-2025, Nov. 2005.
    • (2005) IEEE Trans. Power Syst , vol.20 , Issue.4 , pp. 2015-2025
    • Li, T.1    Shahidehpour, M.2
  • 20
    • 4043136473 scopus 로고    scopus 로고
    • Modeling of start-up and shut-down power trajectories of thermal units
    • Aug
    • J. M. Arroyo and A. J. Conejo, "Modeling of start-up and shut-down power trajectories of thermal units," IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1562-1568, Aug. 2004.
    • (2004) IEEE Trans. Power Syst , vol.19 , Issue.3 , pp. 1562-1568
    • Arroyo, J.M.1    Conejo, A.J.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.