Line-of-balance scheduling in pavement construction
-
Arditi, D., and Albulak, M. Z. (1986). "Line-of-balance scheduling in pavement construction." J. Constr. Eng. Manage., 112(3), 411-424.
-
(1986)
J. Constr. Eng. Manage.
, vol.112
, Issue.3
, pp. 411-424
-
-
Arditi, D.1
Albulak, M.Z.2
-
2
-
-
13944280334
-
SYRUS-System for repetitive unit scheduling
-
Verkefnastjomun, the Icelandic Project Management Society, Reykjavik, Iceland
-
Arditi, D., and Psarros, M. K. (1987). "SYRUS-System for repetitive unit scheduling." Proc., NORDNET/INTERNET/PMI'87 Conf. on Project Management, Verkefnastjomun, the Icelandic Project Management Society, Reykjavik, Iceland.
-
(1987)
Proc., NORDNET/INTERNET/PMI'87 Conf. on Project Management
-
-
Arditi, D.1
Psarros, M.K.2
-
3
-
-
0035399998
-
Effect of learning on line-of-balance scheduling
-
Arditi, D., Tokdemir, O. B., and Suh, K. (1999). "Effect of learning on line-of-balance scheduling." Int. J. Proj. Manage., 15(5), 265-277.
-
(1999)
Int. J. Proj. Manage.
, vol.15
, Issue.5
, pp. 265-277
-
-
Arditi, D.1
Tokdemir, O.B.2
Suh, K.3
-
4
-
-
0019030430
-
Simulation of repetitive-unit construction
-
Ashley, D. B. (1980). "Simulation of repetitive-unit construction." J. Constr. Div., Am. Soc. Civ. Eng., 106(2), 185-194.
-
(1980)
J. Constr. Div., Am. Soc. Civ. Eng.
, vol.106
, Issue.2
, pp. 185-194
-
-
Ashley, D.B.1
-
5
-
-
84952013944
-
Factors that have an adverse effect on productivity
-
University of Texas at Austin, Austin, Tex.
-
Borcherding, J. D. (1989). "Factors that have an adverse effect on productivity," Discussion Paper of Construction Operation, University of Texas at Austin, Austin, Tex.
-
(1989)
Discussion Paper of Construction Operation
-
-
Borcherding, J.D.1
-
6
-
-
0000802988
-
Linear scheduling model: Development of controlling activity path
-
Harmelink, D. J., and Rowings, J. E. (1998). "Linear scheduling model: Development of controlling activity path." J. Constr. Eng. Manage., 124(4), 263-268.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 263-268
-
-
Harmelink, D.J.1
Rowings, J.E.2
-
7
-
-
0000674566
-
Scheduling projects with repeating activities
-
Harris, R. B., and Ioannou, P. G. (1998). "Scheduling projects with repeating activities." J. Constr. Eng. Manage., 124(4), 269-278.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.4
, pp. 269-278
-
-
Harris, R.B.1
Ioannou, P.G.2
-
8
-
-
0003148016
-
BAL: An anlgorithm for scheduling and control of linear projects
-
Morgantown, W. Va.
-
Hegazy, T., Moselhi, O., and Fazio, P., (1993). "BAL: An anlgorithm for scheduling and control of linear projects." AACE Transactions, Morgantown, W. Va., 8.1-8.14.
-
(1993)
AACE Transactions
-
-
Hegazy, T.1
Moselhi, O.2
Fazio, P.3
-
10
-
-
1842743191
-
Analyzing linear construction operations using simulation and line-of-balance
-
Transportation Research Board, National Academy Press, Washington, D.C.
-
Lutz, J. D., and Halpin, D. W. (1992). "Analyzing linear construction operations using simulation and line-of-balance." Proc., Transportation Research Board 71st Annual Meeting, Transportation Research Record 1351, Transportation Research Board, National Academy Press, Washington, D.C., 48-56.
-
(1992)
Proc., Transportation Research Board 71st Annual Meeting, Transportation Research Record
, vol.1351
, pp. 48-56
-
-
Lutz, J.D.1
Halpin, D.W.2
-
11
-
-
0028744434
-
Simulation of learning development in repetitive construction
-
Lutz, J. D., Halpin, D. W., and Wilson, J. R. (1994). "Simulation of learning development in repetitive construction." J. Constr. Eng. Manage., 120(4), 753-773.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 753-773
-
-
Lutz, J.D.1
Halpin, D.W.2
Wilson, J.R.3
-
12
-
-
0027866760
-
Scheduling of repetitive projects with cost optimization
-
Moselhi, O., and El-Rayes, K. (1993). "Scheduling of repetitive projects with cost optimization." J. Constr. Eng. Manage., 119(4), 681-697.
-
(1993)
J. Constr. Eng. Manage.
, vol.119
, Issue.4
, pp. 681-697
-
-
Moselhi, O.1
El-Rayes, K.2
-
13
-
-
13944268360
-
-
Master's thesis, Dept. of Civil Engineering, Illinois Institute of Technology, Chicago
-
Psarros, M. E. (1987). "SYRUS: A program for repetitive projects." Master's thesis, Dept. of Civil Engineering, Illinois Institute of Technology, Chicago.
-
(1987)
SYRUS: A Program for Repetitive Projects
-
-
Psarros, M.E.1
-
14
-
-
0343820451
-
Scheduled overtime effect on construction projects
-
The Business Roundtable, New York
-
"Scheduled Overtime Effect on Construction Projects." (1980). A Construction Industry Cost Effectivenes Task Force Report, The Business Roundtable, New York.
-
(1980)
A Construction Industry Cost Effectivenes Task Force Report
-
-
-
15
-
-
5244378567
-
Dynamic programming approach to scheduling of nonserial linear project
-
Senouci, A. B., and Eldin, N. N. (1996). "Dynamic programming approach to scheduling of nonserial linear project." J. Comput. Civ. Eng., 10(2), 106-114.
-
(1996)
J. Comput. Civ. Eng.
, vol.10
, Issue.2
, pp. 106-114
-
-
Senouci, A.B.1
Eldin, N.N.2
-
16
-
-
0006193246
-
-
Doctoral thesis, Div. of Structural Engineering and Construction, Asian Institute of Technology, Bangkok, Thailand
-
Srigungvarl, P. (1992). "A knowledge-based integrated system for line-of-balance applications in high-rise building construction." Doctoral thesis, Div. of Structural Engineering and Construction, Asian Institute of Technology, Bangkok, Thailand.
-
(1992)
A Knowledge-based Integrated System for Line-of-balance Applications in High-rise Building Construction
-
-
Srigungvarl, P.1
-
17
-
-
0028750185
-
HVLS: Horizontal and vertical logic scheduling for multistory projects
-
Thabet, W. Y., and Beliveau, Y. J. (1994). "HVLS: Horizontal and vertical logic scheduling for multistory projects." J. Constr. Eng. Manage., 120(4), 875-892.
-
(1994)
J. Constr. Eng. Manage.
, vol.120
, Issue.4
, pp. 875-892
-
-
Thabet, W.Y.1
Beliveau, Y.J.2
-
18
-
-
0006138041
-
Controlling activity interval times in LOB scheduling
-
Wang, C., and Huang, Y. (1998). "Controlling activity interval times in LOB scheduling." Constr. Manage. Econom., 16(1), 5-16.
-
(1998)
Constr. Manage. Econom.
, vol.16
, Issue.1
, pp. 5-16
-
-
Wang, C.1
Huang, Y.2
|