메뉴 건너뛰기




Volumn 128, Issue 6, 2002, Pages 545-556

Challenges in line-of-balance scheduling

Author keywords

Construction management; Scheduling

Indexed keywords

CONSTRUCTION MANAGEMENT; CRITICAL PATH METHOD (CPM); LINE-OF-BALANCE (LOB); REPETITIVE-UNIT CONSTRUCTION;

EID: 13944261204     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2002)128:6(545)     Document Type: Article
Times cited : (117)

References (18)
  • 1
    • 0022778511 scopus 로고
    • Line-of-balance scheduling in pavement construction
    • Arditi, D., and Albulak, M. Z. (1986). "Line-of-balance scheduling in pavement construction." J. Constr. Eng. Manage., 112(3), 411-424.
    • (1986) J. Constr. Eng. Manage. , vol.112 , Issue.3 , pp. 411-424
    • Arditi, D.1    Albulak, M.Z.2
  • 2
    • 13944280334 scopus 로고
    • SYRUS-System for repetitive unit scheduling
    • Verkefnastjomun, the Icelandic Project Management Society, Reykjavik, Iceland
    • Arditi, D., and Psarros, M. K. (1987). "SYRUS-System for repetitive unit scheduling." Proc., NORDNET/INTERNET/PMI'87 Conf. on Project Management, Verkefnastjomun, the Icelandic Project Management Society, Reykjavik, Iceland.
    • (1987) Proc., NORDNET/INTERNET/PMI'87 Conf. on Project Management
    • Arditi, D.1    Psarros, M.K.2
  • 3
    • 0035399998 scopus 로고    scopus 로고
    • Effect of learning on line-of-balance scheduling
    • Arditi, D., Tokdemir, O. B., and Suh, K. (1999). "Effect of learning on line-of-balance scheduling." Int. J. Proj. Manage., 15(5), 265-277.
    • (1999) Int. J. Proj. Manage. , vol.15 , Issue.5 , pp. 265-277
    • Arditi, D.1    Tokdemir, O.B.2    Suh, K.3
  • 4
    • 0019030430 scopus 로고
    • Simulation of repetitive-unit construction
    • Ashley, D. B. (1980). "Simulation of repetitive-unit construction." J. Constr. Div., Am. Soc. Civ. Eng., 106(2), 185-194.
    • (1980) J. Constr. Div., Am. Soc. Civ. Eng. , vol.106 , Issue.2 , pp. 185-194
    • Ashley, D.B.1
  • 5
    • 84952013944 scopus 로고
    • Factors that have an adverse effect on productivity
    • University of Texas at Austin, Austin, Tex.
    • Borcherding, J. D. (1989). "Factors that have an adverse effect on productivity," Discussion Paper of Construction Operation, University of Texas at Austin, Austin, Tex.
    • (1989) Discussion Paper of Construction Operation
    • Borcherding, J.D.1
  • 6
    • 0000802988 scopus 로고    scopus 로고
    • Linear scheduling model: Development of controlling activity path
    • Harmelink, D. J., and Rowings, J. E. (1998). "Linear scheduling model: Development of controlling activity path." J. Constr. Eng. Manage., 124(4), 263-268.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 263-268
    • Harmelink, D.J.1    Rowings, J.E.2
  • 7
    • 0000674566 scopus 로고    scopus 로고
    • Scheduling projects with repeating activities
    • Harris, R. B., and Ioannou, P. G. (1998). "Scheduling projects with repeating activities." J. Constr. Eng. Manage., 124(4), 269-278.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.4 , pp. 269-278
    • Harris, R.B.1    Ioannou, P.G.2
  • 8
    • 0003148016 scopus 로고
    • BAL: An anlgorithm for scheduling and control of linear projects
    • Morgantown, W. Va.
    • Hegazy, T., Moselhi, O., and Fazio, P., (1993). "BAL: An anlgorithm for scheduling and control of linear projects." AACE Transactions, Morgantown, W. Va., 8.1-8.14.
    • (1993) AACE Transactions
    • Hegazy, T.1    Moselhi, O.2    Fazio, P.3
  • 10
    • 1842743191 scopus 로고
    • Analyzing linear construction operations using simulation and line-of-balance
    • Transportation Research Board, National Academy Press, Washington, D.C.
    • Lutz, J. D., and Halpin, D. W. (1992). "Analyzing linear construction operations using simulation and line-of-balance." Proc., Transportation Research Board 71st Annual Meeting, Transportation Research Record 1351, Transportation Research Board, National Academy Press, Washington, D.C., 48-56.
    • (1992) Proc., Transportation Research Board 71st Annual Meeting, Transportation Research Record , vol.1351 , pp. 48-56
    • Lutz, J.D.1    Halpin, D.W.2
  • 11
    • 0028744434 scopus 로고
    • Simulation of learning development in repetitive construction
    • Lutz, J. D., Halpin, D. W., and Wilson, J. R. (1994). "Simulation of learning development in repetitive construction." J. Constr. Eng. Manage., 120(4), 753-773.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 753-773
    • Lutz, J.D.1    Halpin, D.W.2    Wilson, J.R.3
  • 12
    • 0027866760 scopus 로고
    • Scheduling of repetitive projects with cost optimization
    • Moselhi, O., and El-Rayes, K. (1993). "Scheduling of repetitive projects with cost optimization." J. Constr. Eng. Manage., 119(4), 681-697.
    • (1993) J. Constr. Eng. Manage. , vol.119 , Issue.4 , pp. 681-697
    • Moselhi, O.1    El-Rayes, K.2
  • 13
    • 13944268360 scopus 로고
    • Master's thesis, Dept. of Civil Engineering, Illinois Institute of Technology, Chicago
    • Psarros, M. E. (1987). "SYRUS: A program for repetitive projects." Master's thesis, Dept. of Civil Engineering, Illinois Institute of Technology, Chicago.
    • (1987) SYRUS: A Program for Repetitive Projects
    • Psarros, M.E.1
  • 14
    • 0343820451 scopus 로고
    • Scheduled overtime effect on construction projects
    • The Business Roundtable, New York
    • "Scheduled Overtime Effect on Construction Projects." (1980). A Construction Industry Cost Effectivenes Task Force Report, The Business Roundtable, New York.
    • (1980) A Construction Industry Cost Effectivenes Task Force Report
  • 15
    • 5244378567 scopus 로고    scopus 로고
    • Dynamic programming approach to scheduling of nonserial linear project
    • Senouci, A. B., and Eldin, N. N. (1996). "Dynamic programming approach to scheduling of nonserial linear project." J. Comput. Civ. Eng., 10(2), 106-114.
    • (1996) J. Comput. Civ. Eng. , vol.10 , Issue.2 , pp. 106-114
    • Senouci, A.B.1    Eldin, N.N.2
  • 17
    • 0028750185 scopus 로고
    • HVLS: Horizontal and vertical logic scheduling for multistory projects
    • Thabet, W. Y., and Beliveau, Y. J. (1994). "HVLS: Horizontal and vertical logic scheduling for multistory projects." J. Constr. Eng. Manage., 120(4), 875-892.
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.4 , pp. 875-892
    • Thabet, W.Y.1    Beliveau, Y.J.2
  • 18
    • 0006138041 scopus 로고    scopus 로고
    • Controlling activity interval times in LOB scheduling
    • Wang, C., and Huang, Y. (1998). "Controlling activity interval times in LOB scheduling." Constr. Manage. Econom., 16(1), 5-16.
    • (1998) Constr. Manage. Econom. , vol.16 , Issue.1 , pp. 5-16
    • Wang, C.1    Huang, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.