메뉴 건너뛰기




Volumn 135, Issue 10, 2009, Pages 939-947

Modeling the dynamics of heavy equipment management practices and downtime in large highway contractors

Author keywords

Construction equipment; Construction industry; Contractors; Dynamic models; Highway and road construction; Maintenance; Systems management; Thailand

Indexed keywords

CRITICAL PROBLEMS; DYNAMIC BEHAVIORS; EQUIPMENT MANAGEMENT; EQUIPMENT MANAGEMENT SYSTEMS; FACE-TO-FACE INTERVIEW; HEAVY EQUIPMENT; HIGHWAY AND ROAD CONSTRUCTION; MACHINE DOWNTIME; MULTIPLE FEEDBACK; SIMULATION MODEL; SYSTEM DYNAMICS APPROACH; SYSTEMS MANAGEMENT; THAILAND; VALIDATION TEST;

EID: 70349334594     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000076     Document Type: Article
Times cited : (16)

References (24)
  • 1
    • 25444513750 scopus 로고    scopus 로고
    • Issues in subcontracting practice
    • DOI 10.1061/(ASCE)0733-9364(2005)131:8(866)
    • Arditi, D., and Chotibhongs, R. (2005). " Issues in subcontracting practice.." J. Constr. Eng. Manage. 0733-9364, 131 (8), 866-876. 10.1061/(ASCE)0733-9364(2005)131:8(866) (Pubitemid 41364749)
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.8 , pp. 866-876
    • Arditi, D.1    Chotibhongs, R.2
  • 2
    • 34249040596 scopus 로고    scopus 로고
    • Caterpillar.., 35th Ed., Caterpillar, Peoria, Ill.
    • Caterpillar. (2004). Caterpillar performance handbook, 35th Ed., Caterpillar, Peoria, Ill.
    • (2004) Caterpillar Performance Handbook
  • 3
    • 84992974814 scopus 로고    scopus 로고
    • System dynamics modeling for design and build construction projects
    • " 1471-4175, (),. 10.1191/1471417502ci042oa
    • Chritamara, S., Ogunlana, S. O., and Bach, N. L. (2002). " System dynamics modeling for design and build construction projects.." Constr. Innovation 1471-4175, 2 (4), 269-295. 10.1191/1471417502ci042oa
    • (2002) Constr. Innovation , vol.2 , Issue.4 , pp. 269-295
    • Chritamara, S.1    Ogunlana, S.O.2    Bach, N.L.3
  • 4
    • 0036812375 scopus 로고    scopus 로고
    • Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry
    • DOI 10.1080/01446190210163552
    • Edwards, D. J., Holt, G. D., and Harris, F. C. (2002). " Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry.." Constr. Manage. Econom. 0144-6193, 20 (7), 581-591. 10.1080/01446190210163552 (Pubitemid 35389901)
    • (2002) Construction Management and Economics , vol.20 , Issue.7 , pp. 581-591
    • Edwards, D.J.1    Holt, G.D.2    Harris, F.C.3
  • 5
    • 0001073758 scopus 로고
    • Building theories from case study research
    • 0363-7425, (),. 10.2307/258557
    • Eisenhardt, K. M. (1989). " Building theories from case study research.." Acad. Manage. Rev. 0363-7425, 14 (4), 532-550. 10.2307/258557
    • (1989) Acad. Manage. Rev. , vol.14 , Issue.4 , pp. 532-550
    • Eisenhardt, K.M.1
  • 6
    • 1142287836 scopus 로고    scopus 로고
    • Evaluating the performance of construction equipment operations in Egypt
    • 0733-9364, (),. 10.1061/(ASCE)0733-9364(1996)122:2(109)
    • Elazouni, A. M., and Basha, I. M. (1996). " Evaluating the performance of construction equipment operations in Egypt.." J. Constr. Eng. Manage. 0733-9364, 122 (2), 109-114. 10.1061/(ASCE)0733-9364(1996)122: 2(109)
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.2 , pp. 109-114
    • Elazouni, A.M.1    Basha, I.M.2
  • 9
    • 0033114549 scopus 로고    scopus 로고
    • Overcoming the improvement paradox
    • ", (),. 10.1016/S0263-2373(98)00072-3 0263-2373
    • Keating, E. K., Oliva, R., Repenning, N. P., Rockart, S., and Sterman, J. D. (1999). " Overcoming the improvement paradox.." Eur. Manage. J., 17 (2), 120-134. 10.1016/S0263-2373(98)00072-3 0263-2373
    • (1999) Eur. Manage. J. , vol.17 , Issue.2 , pp. 120-134
    • Keating, E.K.1    Oliva, R.2    Repenning, N.P.3    Rockart, S.4    Sterman, J.D.5
  • 12
    • 0001187120 scopus 로고    scopus 로고
    • Determining the causal structure of rework influences in construction
    • " 0144-6193, (),. 10.1080/014461999371420
    • Love, P. E. D., Mandal, P., and Li, H. (1999). " Determining the causal structure of rework influences in construction.." Constr. Manage. Econom. 0144-6193, 17 (4), 505-517. 10.1080/014461999371420
    • (1999) Constr. Manage. Econom. , vol.17 , Issue.4 , pp. 505-517
    • Love, P.E.D.1    Mandal, P.2    Li, H.3
  • 15
    • 2542421869 scopus 로고    scopus 로고
    • Downtime model development for construction equipment management
    • 0969-9988, (),. 10.1108/09699980410535804
    • Nepal, M. P., and Park, M. (2004). " Downtime model development for construction equipment management.." Eng., Constr., Archit. Manage. 0969-9988, 11 (3), 199-210. 10.1108/09699980410535804
    • (2004) Eng., Constr., Archit. Manage. , vol.11 , Issue.3 , pp. 199-210
    • Nepal, M.P.1    Park, M.2
  • 16
    • 18444389156 scopus 로고    scopus 로고
    • Modeling the dynamics of an infrastructure project
    • DOI 10.1111/j.1467-8667.2005.00392
    • Nguyen, L. D., and Ogunlana, S. O. (2005). " Modeling the dynamics of an infrastructure project.." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 20 (4), 265-279. 10.1111/j.1467-8667.2005.00392 (Pubitemid 40652251)
    • (2005) Computer-Aided Civil and Infrastructure Engineering , vol.20 , Issue.4 , pp. 265-279
    • Nguyen, L.D.1    Ogunlana, S.O.2
  • 17
    • 11544297849 scopus 로고    scopus 로고
    • Fleet managers balance bulldozers with benefits and the bottom line; Seasonal work, labor shortages and theft make it tough
    • 0013-807X.
    • Phair, M., and Angelo, W. J. (1998). " Fleet managers balance bulldozers with benefits and the bottom line; seasonal work, labor shortages and theft make it tough.." Eng. News-Rec. 0013-807X, 241 (9), 32.
    • (1998) Eng. News-Rec. , vol.241 , Issue.9 , pp. 32
    • Phair, M.1    Angelo, W.J.2
  • 19
    • 34249021358 scopus 로고    scopus 로고
    • Heavy equipment management practices and problems in Thai highway contractors
    • DOI 10.1108/09699980710744881
    • Prasertrungruang, T., and Hadikusumo, B. H. W. (2007). " Heavy equipment management practices and problems in Thai highway contractors.." Eng., Constr., Archit. Manage. 0969-9988, 14 (3), 228-241. 10.1108/ 09699980710744881 (Pubitemid 46790562)
    • (2007) Engineering, Construction and Architectural Management , vol.14 , Issue.3 , pp. 228-241
    • Prasertrungruang, T.1    Hadikusumo, B.H.W.2
  • 22
    • 58149275771 scopus 로고    scopus 로고
    • Buying fewer brands cuts maintenance costs by 10%
    • 0192-3978.
    • Stewart, L. (1999). " Buying fewer brands cuts maintenance costs by 10%.." Constr. Equip. 0192-3978, 100 (5), 37.
    • (1999) Constr. Equip. , vol.100 , Issue.5 , pp. 37
    • Stewart, L.1
  • 23
    • 55349093163 scopus 로고    scopus 로고
    • Buy-back bags trencher trade-in bargain
    • 0192-3978.
    • Stewart, L. (2000). " Buy-back bags trencher trade-in bargain.." Constr. Equip. 0192-3978, 101 (3), 35-37.
    • (2000) Constr. Equip. , vol.101 , Issue.3 , pp. 35-37
    • Stewart, L.1
  • 24
    • 70349356937 scopus 로고    scopus 로고
    • Volvo Grou. "." 〈〉 (Se 9, 2006).
    • Volvo Group. (2006). " FM specification sheets.." 〈 http://www.volvo.com/trucks/uk-market/en-gb/trucks/VolvoFM-2005/specification/ fm-specification-sheets.htm 〉 (Sep. 9, 2006).
    • (2006) FM Specification Sheets


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.