-
1
-
-
25444513750
-
Issues in subcontracting practice
-
DOI 10.1061/(ASCE)0733-9364(2005)131:8(866)
-
Arditi, D., and Chotibhongs, R. (2005). " Issues in subcontracting practice.." J. Constr. Eng. Manage. 0733-9364, 131 (8), 866-876. 10.1061/(ASCE)0733-9364(2005)131:8(866) (Pubitemid 41364749)
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.8
, pp. 866-876
-
-
Arditi, D.1
Chotibhongs, R.2
-
2
-
-
34249040596
-
-
Caterpillar.., 35th Ed., Caterpillar, Peoria, Ill.
-
Caterpillar. (2004). Caterpillar performance handbook, 35th Ed., Caterpillar, Peoria, Ill.
-
(2004)
Caterpillar Performance Handbook
-
-
-
3
-
-
84992974814
-
System dynamics modeling for design and build construction projects
-
" 1471-4175, (),. 10.1191/1471417502ci042oa
-
Chritamara, S., Ogunlana, S. O., and Bach, N. L. (2002). " System dynamics modeling for design and build construction projects.." Constr. Innovation 1471-4175, 2 (4), 269-295. 10.1191/1471417502ci042oa
-
(2002)
Constr. Innovation
, vol.2
, Issue.4
, pp. 269-295
-
-
Chritamara, S.1
Ogunlana, S.O.2
Bach, N.L.3
-
4
-
-
0036812375
-
Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry
-
DOI 10.1080/01446190210163552
-
Edwards, D. J., Holt, G. D., and Harris, F. C. (2002). " Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry.." Constr. Manage. Econom. 0144-6193, 20 (7), 581-591. 10.1080/01446190210163552 (Pubitemid 35389901)
-
(2002)
Construction Management and Economics
, vol.20
, Issue.7
, pp. 581-591
-
-
Edwards, D.J.1
Holt, G.D.2
Harris, F.C.3
-
5
-
-
0001073758
-
Building theories from case study research
-
0363-7425, (),. 10.2307/258557
-
Eisenhardt, K. M. (1989). " Building theories from case study research.." Acad. Manage. Rev. 0363-7425, 14 (4), 532-550. 10.2307/258557
-
(1989)
Acad. Manage. Rev.
, vol.14
, Issue.4
, pp. 532-550
-
-
Eisenhardt, K.M.1
-
6
-
-
1142287836
-
Evaluating the performance of construction equipment operations in Egypt
-
0733-9364, (),. 10.1061/(ASCE)0733-9364(1996)122:2(109)
-
Elazouni, A. M., and Basha, I. M. (1996). " Evaluating the performance of construction equipment operations in Egypt.." J. Constr. Eng. Manage. 0733-9364, 122 (2), 109-114. 10.1061/(ASCE)0733-9364(1996)122: 2(109)
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 109-114
-
-
Elazouni, A.M.1
Basha, I.M.2
-
7
-
-
0000545232
-
Tests for building confidence in system dynamics models
-
Vol., Elsevier, North Holland, N.Y..
-
Forrester, J. W., and Senge, P. M. (1980). " Tests for building confidence in system dynamics models.." System Dynamics Series: TIMS Studies in the Management Sciences, Vol. 14, Elsevier, North Holland, N.Y., 209-228.
-
(1980)
System Dynamics Series: TIMS Studies in the Management Sciences
, vol.14
, pp. 209-228
-
-
Forrester, J.W.1
Senge, P.M.2
-
9
-
-
0033114549
-
Overcoming the improvement paradox
-
", (),. 10.1016/S0263-2373(98)00072-3 0263-2373
-
Keating, E. K., Oliva, R., Repenning, N. P., Rockart, S., and Sterman, J. D. (1999). " Overcoming the improvement paradox.." Eur. Manage. J., 17 (2), 120-134. 10.1016/S0263-2373(98)00072-3 0263-2373
-
(1999)
Eur. Manage. J.
, vol.17
, Issue.2
, pp. 120-134
-
-
Keating, E.K.1
Oliva, R.2
Repenning, N.P.3
Rockart, S.4
Sterman, J.D.5
-
12
-
-
0001187120
-
Determining the causal structure of rework influences in construction
-
" 0144-6193, (),. 10.1080/014461999371420
-
Love, P. E. D., Mandal, P., and Li, H. (1999). " Determining the causal structure of rework influences in construction.." Constr. Manage. Econom. 0144-6193, 17 (4), 505-517. 10.1080/014461999371420
-
(1999)
Constr. Manage. Econom.
, vol.17
, Issue.4
, pp. 505-517
-
-
Love, P.E.D.1
Mandal, P.2
Li, H.3
-
15
-
-
2542421869
-
Downtime model development for construction equipment management
-
0969-9988, (),. 10.1108/09699980410535804
-
Nepal, M. P., and Park, M. (2004). " Downtime model development for construction equipment management.." Eng., Constr., Archit. Manage. 0969-9988, 11 (3), 199-210. 10.1108/09699980410535804
-
(2004)
Eng., Constr., Archit. Manage.
, vol.11
, Issue.3
, pp. 199-210
-
-
Nepal, M.P.1
Park, M.2
-
16
-
-
18444389156
-
Modeling the dynamics of an infrastructure project
-
DOI 10.1111/j.1467-8667.2005.00392
-
Nguyen, L. D., and Ogunlana, S. O. (2005). " Modeling the dynamics of an infrastructure project.." Comput. Aided Civ. Infrastruct. Eng. 1093-9687, 20 (4), 265-279. 10.1111/j.1467-8667.2005.00392 (Pubitemid 40652251)
-
(2005)
Computer-Aided Civil and Infrastructure Engineering
, vol.20
, Issue.4
, pp. 265-279
-
-
Nguyen, L.D.1
Ogunlana, S.O.2
-
17
-
-
11544297849
-
Fleet managers balance bulldozers with benefits and the bottom line; Seasonal work, labor shortages and theft make it tough
-
0013-807X.
-
Phair, M., and Angelo, W. J. (1998). " Fleet managers balance bulldozers with benefits and the bottom line; seasonal work, labor shortages and theft make it tough.." Eng. News-Rec. 0013-807X, 241 (9), 32.
-
(1998)
Eng. News-Rec.
, vol.241
, Issue.9
, pp. 32
-
-
Phair, M.1
Angelo, W.J.2
-
18
-
-
70349356936
-
Equipment management practices of highway contractors in Thai construction industry
-
Asian Institute of Technology, Bangkok, Thailand.
-
Prasertrungruang, T., and Hadikusumo, B. H. W. (2006). " Equipment management practices of highway contractors in Thai construction industry.." Proc., Tenth East Asia-Pacific Conf. Structural Engineering and Construction (EASEC-10): Construction Professional Practices, Asian Institute of Technology, Bangkok, Thailand, 49-54.
-
(2006)
Proc., Tenth East Asia-Pacific Conf. Structural Engineering and Construction (EASEC-10): Construction Professional Practices
, pp. 49-54
-
-
Prasertrungruang, T.1
Hadikusumo, B.H.W.2
-
19
-
-
34249021358
-
Heavy equipment management practices and problems in Thai highway contractors
-
DOI 10.1108/09699980710744881
-
Prasertrungruang, T., and Hadikusumo, B. H. W. (2007). " Heavy equipment management practices and problems in Thai highway contractors.." Eng., Constr., Archit. Manage. 0969-9988, 14 (3), 228-241. 10.1108/ 09699980710744881 (Pubitemid 46790562)
-
(2007)
Engineering, Construction and Architectural Management
, vol.14
, Issue.3
, pp. 228-241
-
-
Prasertrungruang, T.1
Hadikusumo, B.H.W.2
-
20
-
-
0003846941
-
-
Productivity, Cambridge, Mass.
-
Richardson, G. P., and Pugh, A. L. (1981). Introduction to system dynamics modeling with DYNAMO, Productivity, Cambridge, Mass.
-
(1981)
Introduction to System Dynamics Modeling with DYNAMO
-
-
Richardson, G.P.1
Pugh, A.L.2
-
22
-
-
58149275771
-
Buying fewer brands cuts maintenance costs by 10%
-
0192-3978.
-
Stewart, L. (1999). " Buying fewer brands cuts maintenance costs by 10%.." Constr. Equip. 0192-3978, 100 (5), 37.
-
(1999)
Constr. Equip.
, vol.100
, Issue.5
, pp. 37
-
-
Stewart, L.1
-
23
-
-
55349093163
-
Buy-back bags trencher trade-in bargain
-
0192-3978.
-
Stewart, L. (2000). " Buy-back bags trencher trade-in bargain.." Constr. Equip. 0192-3978, 101 (3), 35-37.
-
(2000)
Constr. Equip.
, vol.101
, Issue.3
, pp. 35-37
-
-
Stewart, L.1
-
24
-
-
70349356937
-
-
Volvo Grou. "." 〈〉 (Se 9, 2006).
-
Volvo Group. (2006). " FM specification sheets.." 〈 http://www.volvo.com/trucks/uk-market/en-gb/trucks/VolvoFM-2005/specification/ fm-specification-sheets.htm 〉 (Sep. 9, 2006).
-
(2006)
FM Specification Sheets
-
-
|