메뉴 건너뛰기




Volumn 122, Issue 2, 1996, Pages 109-114

Evaluating the performance of construction equipment operators in Egypt

Author keywords

[No Author keywords available]

Indexed keywords


EID: 1142287836     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(1996)122:2(109)     Document Type: Article
Times cited : (22)

References (7)
  • 1
    • 11644300512 scopus 로고
    • McGraw-Hill Publishing Co., Inc., New York, N.Y.
    • Alfeld, L. E. (1988). Construction productivity. McGraw-Hill Publishing Co., Inc., New York, N.Y.
    • (1988) Construction Productivity
    • Alfeld, L.E.1
  • 6
    • 0028393273 scopus 로고
    • Action-response model and loss of productivity in construction
    • ASCE
    • Halligan, D. W., Demsetz, L. A., Brown, J. D., and Pace, C. B. (1994). "Action-response model and loss of productivity in construction." J. Constr. Engrg. and Mgmt., ASCE, 120(1), 47-64.
    • (1994) J. Constr. Engrg. and Mgmt. , vol.120 , Issue.1 , pp. 47-64
    • Halligan, D.W.1    Demsetz, L.A.2    Brown, J.D.3    Pace, C.B.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.