Volumn 11, Issue 3, 2004, Pages 199-210

Downtime model development for construction equipment management

Author keywords

Construction industry; Costs; Production downtime; Roads

Indexed keywords

CONSTRUCTION INDUSTRY; COST EFFECTIVENESS; COSTS; EXCAVATORS; HYDRAULIC EQUIPMENT; MECHANIZATION; MINING ENGINEERING; MOTIVATION; PERSONNEL TRAINING; PLANNING; PRODUCTIVITY; QUALITY ASSURANCE; RISK ASSESSMENT; ROAD CONSTRUCTION;

EID: 2542421869     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980410535804     Document Type: Review
Times cited : (32)

References (37)
  • 1
    • 0000483477 scopus 로고    scopus 로고
    • Innovation in construction equipment and its flow into the construction industry
    • Arditi, D., Kale, S. and Tangkar, M. (1997), "innovation in construction equipment and its flow into the construction industry", Journal of Construction Engineering and Management, Vol. 123 No. 4, pp. 371-8.
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.4 , pp. 371-378
    • Arditi, D.1    Kale, S.2    Tangkar, M.3
  • 2
    • 0004294624 scopus 로고    scopus 로고
    • Kathmandu
    • Central Bureau of Statistics (CBS) (2000), Statistical Pocket Book, Kathmandu.
    • (2000) Statistical Pocket Book
  • 3
    • 4143128716 scopus 로고
    • Project Management Research Team, Publication 43-2, Austin TX
    • Construction Industry Institute (Cll) (1995), Quantitative Effects of Project Change, Project Management Research Team, Publication 43-2, Austin, TX.
    • (1995) Quantitative Effects of Project Change
  • 5
    • 0028737139 scopus 로고
    • The $2,000 hour: How managers influence project performance through the rework cycle
    • Cooper, K.G. (1994), "The $2,000 hour: How managers influence project performance through the rework cycle", IEEE Engineering Management Review, Vol. 22 No. 4, pp. 12-23.
    • (1994) IEEE Engineering Management Review , vol.22 , Issue.4 , pp. 12-23
    • Cooper, K.G.1
  • 7
    • 0033888428 scopus 로고    scopus 로고
    • The role of feedback dynamics in disruption and delay on the nature of disruption and delay in major projects
    • Eden, C., Williams, T. and Howick, S. (2000), "The role of feedback dynamics in disruption and delay on the nature of disruption and delay in major projects", Journal of the Operational Research Society, Vol. 51, pp. 291-300.
    • (2000) Journal of the Operational Research Society , vol.51 , pp. 291-300
    • Eden, C.1    Williams, T.2    Howick, S.3
  • 10
    • 0036812375 scopus 로고    scopus 로고
    • Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry
    • Edwards, D.J., Holt, G.D. and Harris, F.C. (2002), "Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry", Construction Management and Economics, Vol. 20, pp. 581-91.
    • (2002) Construction Management and Economics , vol.20 , pp. 581-591
    • Edwards, D.J.1    Holt, G.D.2    Harris, F.C.3
  • 11
    • 1142287836 scopus 로고    scopus 로고
    • Evaluating the performance of construction equipment operations in Egypt
    • Elazouni, A.M. and Basha, I.M. (1996), "Evaluating the performance of construction equipment operations in Egypt", Journal of Construction Engineering and Management, Vol. 122 No. 2, pp. 109-14.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.2 , pp. 109-114
    • Elazouni, A.M.1    Basha, I.M.2
  • 13
    • 0028481406 scopus 로고
    • Factors affecting construction productivity: Newfoundland versus rest of Canada
    • Hanna, A.S. and Heale, D.G. (1994), "Factors affecting construction productivity: Newfoundland versus rest of Canada", Canadian Journal of Civil Engineering, Vol. 21, pp. 663-73.
    • (1994) Canadian Journal of Civil Engineering , vol.21 , pp. 663-673
    • Hanna, A.S.1    Heale, D.G.2
  • 15
    • 0003684702 scopus 로고
    • Policy Planning and Research Staff, Infrastructure and Urban Development Department, Report INU 10, World Bank, Washington, DC
    • Kirmani, S.S. (1988), "The construction industry in development issues and options", Policy Planning and Research Staff, Infrastructure and Urban Development Department, Report INU 10, World Bank, Washington, DC.
    • (1988) The Construction Industry in Development Issues and Options
    • Kirmani, S.S.1
  • 18
    • 2542487153 scopus 로고
    • Equipment replacement and optimal size of a civil engineering fleet
    • Navon, R. and Mayer, D. (1995), "Equipment replacement and optimal size of a civil engineering fleet", Construction Management and Economics, Vol. 13, pp. 173-83.
    • (1995) Construction Management and Economics , vol.13 , pp. 173-183
    • Navon, R.1    Mayer, D.2
  • 19
    • 2542434786 scopus 로고
    • Ministry of Work and Transport, Department of Road, Kathmandu
    • N.D. Lea International Ltd (1993), Baseline Assessment of the Road Construction Industry, Ministry of Work and Transport, Department of Road, Kathmandu.
    • (1993) Baseline Assessment of the Road Construction Industry
  • 23
    • 2542494787 scopus 로고
    • Construction equipment downtime costs
    • Pathmanathan, V. (1980), "Construction equipment downtime costs", Journal of Construction Division, Vol. 106 No. 4, pp. 604-7.
    • (1980) Journal of Construction Division , vol.106 , Issue.4 , pp. 604-607
    • Pathmanathan, V.1
  • 25
    • 0035923927 scopus 로고    scopus 로고
    • Accounting for productivity losses in aggregate planning
    • Piper, C.J. and Vachon, S. (2001), "Accounting for productivity losses in aggregate planning", International Journal of Production Research, Vol. 39 No. 17, pp. 4001-12.
    • (2001) International Journal of Production Research , vol.39 , Issue.17 , pp. 4001-4012
    • Piper, C.J.1    Vachon, S.2
  • 27
    • 84981568557 scopus 로고
    • A simple model of R & D project dynamics
    • Roberts, E.B. and Alfred, P. (1974), "A simple model of R & D project dynamics", R & D Management, Vol. 5 No. 1, pp. 1-15.
    • (1974) R & D Management , vol.5 , Issue.1 , pp. 1-15
    • Roberts, E.B.1    Alfred, P.2
  • 30
    • 0020942707 scopus 로고
    • Economic service life of building construction equipment
    • Selinger, S. (1983), "Economic service life of building construction equipment", Journal of Construction Engineering and Management, Vol. 109 No. 4, pp. 398-405.
    • (1983) Journal of Construction Engineering and Management , vol.109 , Issue.4 , pp. 398-405
    • Selinger, S.1
  • 32
    • 25744441699 scopus 로고
    • Equipment policy as one of the factors affecting construction productivity: A comparative study
    • Lansley, P.R. and Harlow, P.A. (Eds), 5th International Symposium, CIOB, CIB, London
    • Sözen, Z. and Giritli, H. (1987), "Equipment policy as one of the factors affecting construction productivity: A comparative study", in Lansley, P.R. and Harlow, P.A. (Eds), Managing Construction Worldwide: Productivity and Human Factors in Construction, 5th International Symposium, CIOB, CIB, London, pp. 691-6.
    • (1987) Managing Construction Worldwide: Productivity and Human Factors in Construction , pp. 691-696
    • Sözen, Z.1    Giritli, H.2
  • 33
    • 0034225578 scopus 로고    scopus 로고
    • Schedule acceleration, work flow, and labour productivity
    • Thomas, H.R. (2000), "Schedule acceleration, work flow, and labour productivity", Journal of Construction Engineering and Management, Vol. 126 No. 4, pp. 261-7.
    • (2000) Journal of Construction Engineering and Management , vol.126 , Issue.4 , pp. 261-267
    • Thomas, H.R.1
  • 34
    • 0000849119 scopus 로고    scopus 로고
    • Scheduled overtime and labour productivity: Quantitative analysis
    • Thomas, H.R. and Raynar, K.A. (1997), "Scheduled overtime and labour productivity: Quantitative analysis", Journal of Construction Engineering and Management, Vol. 123 No. 2, pp. 181-8.
    • (1997) Journal of Construction Engineering and Management , vol.123 , Issue.2 , pp. 181-188
    • Thomas, H.R.1    Raynar, K.A.2
  • 36
    • 0025625710 scopus 로고
    • Consequential equipment costs associated with lack of availability and DT
    • Vorster, M.C. and De La Garza, J.M. (1990), "Consequential equipment costs associated with lack of availability and DT", Journal of Construction Engineering and Management, Vol. 116 No. 4, pp. 656-69.
    • (1990) Journal of Construction Engineering and Management , vol.116 , Issue.4 , pp. 656-669
    • Vorster, M.C.1    De La Garza, J.M.2
  • 37
    • 0023305807 scopus 로고
    • Model for retiring, replacing, or reassigning construction equipment
    • Vorster, M.C. and Sears, A.S. (1987), "Model for retiring, replacing, or reassigning construction equipment", Journal of Construction Engineering and Management, Vol. 113 No. 1, pp. 125-37.
    • (1987) Journal of Construction Engineering and Management , vol.113 , Issue.1 , pp. 125-137
    • Vorster, M.C.1    Sears, A.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.