메뉴 건너뛰기




Volumn 14, Issue 3, 2007, Pages 228-241

Heavy equipment management practices and problems in Thai highway contractors

Author keywords

Construction equipment; Construction industry; Thailand

Indexed keywords

CONTRACTORS; COSTS; HIGHWAY ADMINISTRATION; OUTSOURCING; PROBLEM SOLVING; PRODUCTION CONTROL;

EID: 34249021358     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980710744881     Document Type: Article
Times cited : (24)

References (37)
  • 4
    • 0036379959 scopus 로고    scopus 로고
    • An artificial intelligence approach for improving plant operator maintenance proficiency
    • Edwards, D.J. and Holt, G.D. (2002), "An artificial intelligence approach for improving plant operator maintenance proficiency", Journal of Quality in Maintenance Engineering, Vol. 8 No. 3, pp. 239-52.
    • (2002) Journal of Quality in Maintenance Engineering , vol.8 , Issue.3 , pp. 239-52
    • Edwards, D.J.1    Holt, G.D.2
  • 5
    • 84986078053 scopus 로고    scopus 로고
    • The state of health and safety in the UK construction industry with a focus on plant operators
    • Edwards, D.J. and Nicholas, J. (2002), "The state of health and safety in the UK construction industry with a focus on plant operators", Structural Survey, Vol. 20 No. 2, pp. 78-87.
    • (2002) Structural Survey , vol.20 , Issue.2 , pp. 78-87
    • Edwards, D.J.1    Nicholas, J.2
  • 7
    • 0031654333 scopus 로고    scopus 로고
    • Predictive maintenance techniques and their relevant to construction plant
    • Edwards, D.J., Holt, G.D. and Harris, F.C. (1998a), "Predictive maintenance techniques and their relevant to construction plant", Journal of Quality in Maintenance Engineering, Vol. 4 No. 1, pp. 25-38.
    • (1998) Journal of Quality in Maintenance Engineering , vol.4 , Issue.1 , pp. 25-38
    • Edwards, D.J.1    Holt, G.D.2    Harris, F.C.3
  • 9
    • 0033690276 scopus 로고    scopus 로고
    • A comparative analysis between the multilayer perceptron 'neural network' and multiple regression analysis for predicting construction plant maintenance costs
    • Edwards, D.J., Holt, G.D. and Harris, F.C. (2000a), "A comparative analysis between the multilayer perceptron 'neural network' and multiple regression analysis for predicting construction plant maintenance costs", Journal of Quality in Maintenance Engineering, Vol. 6 No. 1, pp. 45-60.
    • (2000) Journal of Quality in Maintenance Engineering , vol.6 , Issue.1 , pp. 45-60
    • Edwards, D.J.1    Holt, G.D.2    Harris, F.C.3
  • 11
    • 0036812375 scopus 로고    scopus 로고
    • Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry
    • Edwards, D.J., Holt, G.D. and Harris, F.C. (2002), "Predicting downtime costs of tracked hydraulic excavators operating in the UK opencast mining industry", Construction Management and Economics, Vol. 20 No. 7, pp. 581-91.
    • (2002) Construction Management and Economics , vol.20 , Issue.7 , pp. 581-91
    • Edwards, D.J.1    Holt, G.D.2    Harris, F.C.3
  • 12
    • 1142287836 scopus 로고    scopus 로고
    • Evaluating the performance of construction equipment operations in Egypt
    • Elazouni, A.M. and Basha, I.M. (1996), "Evaluating the performance of construction equipment operations in Egypt", Journal of Construction Engineering and Management, Vol. 122 No. 2, pp. 109-14.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.2 , pp. 109-14
    • Elazouni, A.M.1    Basha, I.M.2
  • 13
    • 0038279149 scopus 로고    scopus 로고
    • Construction skills training for the next millennium
    • Gann, D. and Senkar, P. (1998), "Construction skills training for the next millennium", Construction Management and Economics, Vol. 16 No. 5, pp. 569-80.
    • (1998) Construction Management and Economics , vol.16 , Issue.5 , pp. 569-80
    • Gann, D.1    Senkar, P.2
  • 15
    • 0018514875 scopus 로고
    • Current equipment policies of utility contractors
    • Hinze, J. and Ashton, W.B. (1979), "Current equipment policies of utility contractors", Journal of the Construction Division, Vol. 105, CO3, pp. 225-37.
    • (1979) Journal of the Construction Division , vol.105 , Issue.3 , pp. 225-37
    • Hinze, J.1    Ashton, W.B.2
  • 16
    • 9144261762 scopus 로고    scopus 로고
    • Learning about failure root causes through maintenance records analysis
    • Marquez, A.C. and Herguedas, A.S. (2004), "Learning about failure root causes through maintenance records analysis", Journal of Quality in Maintenance Engineering, Vol. 10 No. 4, pp. 254-62.
    • (2004) Journal of Quality in Maintenance Engineering , vol.10 , Issue.4 , pp. 254-62
    • Marquez, A.C.1    Herguedas, A.S.2
  • 19
    • 2542421869 scopus 로고    scopus 로고
    • Downtime model development for construction equipment management
    • Nepal, M.P. and Park, M. (2004), "Downtime model development for construction equipment management", Engineering, Construction and Architectural Management, Vol. 11 No. 3, pp. 199-210.
    • (2004) Engineering, Construction and Architectural Management , vol.11 , Issue.3 , pp. 199-210
    • Nepal, M.P.1    Park, M.2
  • 20
    • 2542494787 scopus 로고
    • Construction equipment downtime costs
    • Pathmanathan, V. (1980), "Construction equipment downtime costs", Journal of the Construction Division, Vol. 106 No. 4, pp. 604-7.
    • (1980) Journal of the Construction Division , vol.106 , Issue.4 , pp. 604-7
    • Pathmanathan, V.1
  • 21
    • 0019659652 scopus 로고
    • Contractor equipment-management practices
    • Schexnayder, C.J. Jr and Hancher, D.E. (1981), "Contractor equipment-management practices", Journal of the Construction Division, Vol. 107, CO4, pp. 619-26.
    • (1981) Journal of the Construction Division , vol.107 , Issue.4 , pp. 619-26
    • Jr, J.S.C.1    Hancher, D.E.2
  • 23
    • 34249023371 scopus 로고    scopus 로고
    • Monthly morning meetings enlist operators' maintenance support
    • Stewart, L. (1998), "Monthly morning meetings enlist operators' maintenance support", Construction Equipment, Vol. 98 No. 5, p. 35.
    • (1998) Construction Equipment , vol.98 , Issue.5 , pp. 35
    • Stewart, L.1
  • 24
    • 34249045152 scopus 로고    scopus 로고
    • Safety committee stops shop accidents
    • Stewart, L. (2000), "Safety committee stops shop accidents", Construction Equipment, Vol. 102 No. 4, p. 47.
    • (2000) Construction Equipment , vol.102 , Issue.4 , pp. 47
    • Stewart, L.1
  • 25
    • 34249095182 scopus 로고    scopus 로고
    • Certified operators cut repair costs 18 percent
    • Stewart, L. (2001), "Certified operators cut repair costs 18 percent", Construction Equipment, Vol. 104 No. 5, pp. 41-2.
    • (2001) Construction Equipment , vol.104 , Issue.5 , pp. 41-2
    • Stewart, L.1
  • 26
    • 34249007541 scopus 로고    scopus 로고
    • Buyers juggle more rental and leasing
    • Stewart, L. (2002a), "Buyers juggle more rental and leasing", Construction Equipment, Vol. 105 No. 7, p. 44.
    • (2002) Construction Equipment , vol.105 , Issue.7 , pp. 44
    • Stewart, L.1
  • 27
    • 34249014685 scopus 로고    scopus 로고
    • Why rent? for low-use machines
    • Stewart, L. (2002b), "Why rent? For low-use machines", Construction Equipment, Vol. 105 No. 7, p. 50.
    • (2002) Construction Equipment , vol.105 , Issue.7 , pp. 50
    • Stewart, L.1
  • 28
    • 34249056256 scopus 로고    scopus 로고
    • Leasing liberates cash to power growth
    • Stewart, L. (2002c), "Leasing liberates cash to power growth", Construction Equipment, Vol. 105 No. 12, pp. 19-20.
    • (2002) Construction Equipment , vol.105 , Issue.12 , pp. 19-20
    • Stewart, L.1
  • 29
    • 84976258862 scopus 로고    scopus 로고
    • Quality, maintenance, keeps small fleet successful
    • Sutton, R. (2001), "Quality, maintenance, keeps small fleet successful", Construction Equipment, Vol. 103 No. 5, pp. 42-3.
    • (2001) Construction Equipment , vol.103 , Issue.5 , pp. 42-3
    • Sutton, R.1
  • 30
    • 34249093338 scopus 로고    scopus 로고
    • The price-only trap
    • Sutton, R. (2003), "The price-only trap", Construction Equipment, Vol. 106 No. 3, p. 9.
    • (2003) Construction Equipment , vol.106 , Issue.3 , pp. 9
    • Sutton, R.1
  • 34
    • 34249022710 scopus 로고    scopus 로고
    • A machine-replacement strategy
    • Vorster, M. (2005), "A machine-replacement strategy", Construction Equipment, Vol. 108 No. 7, pp. 51-2.
    • (2005) Construction Equipment , vol.108 , Issue.7 , pp. 51-2
    • Vorster, M.1
  • 35
    • 0025625710 scopus 로고
    • Consequential equipment costs associated with lack of availability and downtime
    • Vorster, M.C. and De La Garza, J.M. (1990), "Consequential equipment costs associated with lack of availability and downtime", Journal of Construction Engineering and Management, Vol. 116 No. 4, pp. 656-69.
    • (1990) Journal of Construction Engineering and Management , vol.116 , Issue.4 , pp. 656-69
    • Vorster, M.C.1    De La Garza, J.M.2
  • 37
    • 28044449162 scopus 로고    scopus 로고
    • Managing uncertainty in major equipment procurement in engineering project
    • Yeo, K.T. and Ning, J.H. (2006), "Managing uncertainty in major equipment procurement in engineering project", European Journal of Operational Research, Vol. 171 No. 1, pp. 123-34.
    • (2006) European Journal of Operational Research , vol.171 , Issue.1 , pp. 123-34
    • Yeo, K.T.1    Ning, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.