메뉴 건너뛰기




Volumn 8, Issue 15, 2008, Pages 2752-2757

Synchronized production and distribution scheduling with due window

Author keywords

Air transportation; Distribution; Mathematical models; Multi criteria scheduling; Single machine; Supply chain management; Synchronization

Indexed keywords

DISTRIBUTION; DISTRIBUTION SCHEDULING; EARLINESS-TARDINESS COSTS; MULTI CRITERIA SCHEDULING; SINGLE MACHINE SCHEDULING PROBLEMS; SINGLE- MACHINES; SUPPLY CHAIN SOLUTIONS; SYNCHRONIZED SCHEDULING;

EID: 67649283037     PISSN: 18125654     EISSN: 18125662     Source Type: Journal    
DOI: 10.3923/jas.2008.2752.2757     Document Type: Article
Times cited : (9)

References (25)
  • 1
    • 9544223195 scopus 로고    scopus 로고
    • On scheduling around large restrictive common due windows
    • Biskup, D. and M. Feldmann, 2005. On scheduling around large restrictive common due windows. Eur. J. Operat. Res., 162(2): 740-761.
    • (2005) Eur. J. Operat. Res. , vol.162 , Issue.2 , pp. 740-761
    • Biskup, D.1    Feldmann, M.2
  • 2
  • 3
    • 2642510666 scopus 로고    scopus 로고
    • Machine scheduling with job delivery coordination
    • Chang, Y.C. and C.Y. Lee, 2004. Machine scheduling with job delivery coordination. Eur. J. Operat. Res., 158: 470-487.
    • (2004) Eur. J. Operat. Res. , vol.158 , pp. 470-487
    • Chang, Y.C.1    Lee, C.Y.2
  • 5
    • 22544461035 scopus 로고    scopus 로고
    • Integrated scheduling of production and distribution operations
    • Chen, Z.L. and G.L. Vairaktarakis, 2005. Integrated scheduling of production and distribution operations. Manage. Sci., 51: 614-628.
    • (2005) Manage. Sci. , vol.51 , pp. 614-628
    • Chen, Z.L.1    Vairaktarakis, G.L.2
  • 6
    • 40849113047 scopus 로고    scopus 로고
    • Logistic scheduling with batching and transportation
    • Chen, B. and C.Y. Lee, 2008. Logistic scheduling with batching and transportation. Eur. J. Operat. Res., 189: 871-876.
    • (2008) Eur. J. Operat. Res. , vol.189 , pp. 871-876
    • Chen, B.1    Lee, C.Y.2
  • 7
    • 0032661559 scopus 로고    scopus 로고
    • Integrated scheduling of production/distribution planning in supply chain: An invited review
    • Erenguc, S.S., N.C. Simpson and A.J. Vakharia, 1999. Integrated scheduling of production/distribution planning in supply chain: An invited review. Eur. J. Operat. Res., 115: 219-236.
    • (1999) Eur. J. Operat. Res. , vol.115 , pp. 219-236
    • Erenguc, S.S.1    Simpson, N.C.2    Vakharia, A.J.3
  • 8
    • 0033339421 scopus 로고    scopus 로고
    • Synchronized development of production, inventory and distribution schedules
    • Fumero, F. and C. Vercellis, 1999. Synchronized development of production, inventory and distribution schedules. Transport. Sci., 33: 330-340.
    • (1999) Transport. Sci. , vol.33 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 9
    • 0037121163 scopus 로고    scopus 로고
    • Modeling and design of global logistics systems: A review of integrated strategic and tactical models and design algorithms
    • Goetschalckx, M., C.J. Vidal and K. Dogan, 2002. Modeling and design of global logistics systems: A review of integrated strategic and tactical models and design algorithms. Eur. J. Operat. Res., 143: 1-18.
    • (2002) Eur. J. Operat. Res. , vol.143 , pp. 1-18
    • Goetschalckx, M.1    Vidal, C.J.2    Dogan, K.3
  • 10
    • 0344427189 scopus 로고    scopus 로고
    • Machine scheduling with transportation considerations
    • Lee, C.Y. and Z.L. Chen, 2001. Machine scheduling with transportation considerations. J. Sched., 4: 3-24.
    • (2001) J. Sched. , vol.4 , pp. 3-24
    • Lee, C.Y.1    Chen, Z.L.2
  • 11
    • 27744566926 scopus 로고    scopus 로고
    • Machine scheduling with pickup and delivery
    • Li, C.L. and J. Ou, 2005. Machine scheduling with pickup and delivery. Nav. Res. Log., 52: 617-630.
    • (2005) Nav. Res. Log. , vol.52 , pp. 617-630
    • Li, C.L.1    Ou, J.2
  • 12
    • 10444261222 scopus 로고    scopus 로고
    • Machine scheduling with deliveries to multiple customer locations
    • Li, C.L., G. Vairaktarakis and C.Y. Lee, 2005. Machine scheduling with deliveries to multiple customer locations. Eur. J. Operat. Res., 164: 39-51.
    • (2005) Eur. J. Operat. Res. , vol.164 , pp. 39-51
    • Li, C.L.1    Vairaktarakis, G.2    Lee, C.Y.3
  • 13
    • 33750028260 scopus 로고    scopus 로고
    • Solution methodology for synchronizing assembly manufacturing and air transportation of consumer electronics supply chain
    • Li, K.P., A.I. Sivakumar, M. Mathirajan and V.K. Ganesan, 2004. Solution methodology for synchronizing assembly manufacturing and air transportation of consumer electronics supply chain. Int. J. Business, 9: 361-380.
    • (2004) Int. J. Business , vol.9 , pp. 361-380
    • Li, K.P.1    Sivakumar, A.I.2    Mathirajan, M.3    Ganesan, V.K.4
  • 14
    • 27944436124 scopus 로고    scopus 로고
    • Synchronized scheduling of assembly and multi-destination air transportation in a consumer electronics supply chain
    • Li, K.P., V.K. Ganesan and A.I. Sivakumar, 2005. Synchronized scheduling of assembly and multi-destination air transportation in a consumer electronics supply chain. Int. J. Prod. Res., 432: 2671-2685.
    • (2005) Int. J. Prod. Res. , vol.432 , pp. 2671-2685
    • Li, K.P.1    Ganesan, V.K.2    Sivakumar, A.I.3
  • 15
    • 33750012584 scopus 로고    scopus 로고
    • Scheduling of single stage assembly with air transportation in a consumer electronic supply chain
    • Li, K.P., V.K. Ganesan and A.I. Sivakumar, 2006a. Scheduling of single stage assembly with air transportation in a consumer electronic supply chain. Comput. Ind. Eng., 51: 264-278.
    • (2006) Comput. Ind. Eng. , vol.51 , pp. 264-278
    • Li, K.P.1    Ganesan, V.K.2    Sivakumar, A.I.3
  • 16
    • 33745902212 scopus 로고    scopus 로고
    • Methodologies for synchronized scheduling of assembly and air transportation in a consumer electronic supply chain
    • Li, K.P., V.K. Ganesan and A.I. Sivakumar, 2006b. Methodologies for synchronized scheduling of assembly and air transportation in a consumer electronic supply chain. Int. J. Log. Syst. Manage., 2: 52-67.
    • (2006) Int. J. Log. Syst. Manage. , vol.2 , pp. 52-67
    • Li, K.P.1    Ganesan, V.K.2    Sivakumar, A.I.3
  • 17
    • 40649085331 scopus 로고    scopus 로고
    • A case study for synchronized scheduling and manufacturing and air transportation in consumer electronics supply chain
    • In, December 2-4, Singapore
    • Li, K.P., A.I. Sivakumar, Q. Fu and X. Jin, 2007. A case study for synchronized scheduling and manufacturing and air transportation in consumer electronics supply chain. In: IEEE Conference on Industrial Engineering and Engineering Management (IEEM), December 2-4, Singapore, pp: 1629-1633.
    • (2007) IEEE Conference on Industrial Engineering and Engineering Management (IEEM) , pp. 1629-1633
    • Li, K.P.1    Sivakumar, A.I.2    Fu, Q.3    Jin, X.4
  • 18
    • 36048991730 scopus 로고    scopus 로고
    • Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronic supply chain
    • Li, K.P., A.I. Sivakumar and V.K. Ganesan, 2008. Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronic supply chain. Eur. J. Operat. Res., 187: 442-455.
    • (2008) Eur. J. Operat. Res. , vol.187 , pp. 442-455
    • Li, K.P.1    Sivakumar, A.I.2    Ganesan, V.K.3
  • 19
    • 0033344267 scopus 로고    scopus 로고
    • A review of integrated analysis of production-distribution systems
    • Sarmiento, A.M. and R. Nagi, 1999. A review of integrated analysis of production-distribution systems. HE Trans., 31: 1061-1074.
    • (1999) HE Trans. , vol.31 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 20
    • 5144221178 scopus 로고    scopus 로고
    • Complexity of flow shop scheduling problems with transportation constraints
    • Soukhal, A., A. Oulmara and P. Martineau, 2005. Complexity of flow shop scheduling problems with transportation constraints. Eur. J. Operat. Res., 161: 32-41.
    • (2005) Eur. J. Operat. Res. , vol.161 , pp. 32-41
    • Soukhal, A.1    Oulmara, A.2    Martineau, P.3
  • 21
    • 0031119856 scopus 로고    scopus 로고
    • Strategic production-distribution models: A critical review with emphasis on global supply chain models
    • Vidal, C. and M. Goetschalckx, 1997. Strategic production-distribution models: A critical review with emphasis on global supply chain models. Eur. J. Operat. Res., 98: 1-18.
    • (1997) Eur. J. Operat. Res. , vol.98 , pp. 1-18
    • Vidal, C.1    Goetschalckx, M.2
  • 22
    • 30544435206 scopus 로고    scopus 로고
    • Production and transport logistics scheduling with two transport mode choices
    • Wang, H. and C.Y. Lee, 2005. Production and transport logistics scheduling with two transport mode choices. Nav. Res. Log., 52: 796-809.
    • (2005) Nav. Res. Log. , vol.52 , pp. 796-809
    • Wang, H.1    Lee, C.Y.2
  • 23
    • 33846658252 scopus 로고    scopus 로고
    • Machine scheduling with an availability constraint and job delivery coordination
    • Wang, X. and T.C.E. Cheng, 2006. Machine scheduling with an availability constraint and job delivery coordination. Nav. Res. Log., 54: 11-20.
    • (2006) Nav. Res. Log. , vol.54 , pp. 11-20
    • Wang, X.1    Cheng, T.C.E.2
  • 24
    • 33751084894 scopus 로고    scopus 로고
    • A note on the complexity of flow shop scheduling with transportation constraints
    • Yang, J., A. Soukhal, Y. Chen and L. Lu, 2007. A note on the complexity of flow shop scheduling with transportation constraints. Eur. J. Operat. Res., 178: 918-925.
    • (2007) Eur. J. Operat. Res. , vol.178 , pp. 918-925
    • Yang, J.1    Soukhal, A.2    Chen, Y.3    Lu, L.4
  • 25
    • 34248222606 scopus 로고    scopus 로고
    • On the machine scheduling problem with job delivery coordination
    • Zhong, W., G. Dosa and Z. Tan, 2007. On the machine scheduling problem with job delivery coordination. Eur. J. Operat. Res., 182: 1057-1072.
    • (2007) Eur. J. Operat. Res. , vol.182 , pp. 1057-1072
    • Zhong, W.1    Dosa, G.2    Tan, Z.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.