메뉴 건너뛰기




Volumn 2, Issue 1, 2006, Pages 52-67

Methodologies for synchronised scheduling of assembly and air transportation in a consumer electronics supply chain

Author keywords

Air transportation; Assembly manufacturing; Consumer electronics supply chain; Synchronisation

Indexed keywords


EID: 33745902212     PISSN: 17427967     EISSN: 17427975     Source Type: Journal    
DOI: 10.1504/IJLSM.2006.008217     Document Type: Article
Times cited : (18)

References (26)
  • 1
    • 0025944047 scopus 로고
    • 'Synchronizing production and transportation schedules'
    • Blumenfeld, D.E., Bums, L.D. and Daganzo, C.F. (1991) 'Synchronizing production and transportation schedules', Transportation Research, Vol. 25B, pp.23-27
    • (1991) Transportation Research , vol.25 B , pp. 23-27
    • Blumenfeld, D.E.1    Bums, L.D.2    Daganzo, C.F.3
  • 2
    • 2642510666 scopus 로고    scopus 로고
    • 'Machine scheduling with job delivery coordination'
    • Chang, Y.C. and Lee, C.Y. (2004) 'Machine scheduling with job delivery coordination', European Journal of Operational Research, Vol. 158, pp.470-487.
    • (2004) European Journal of Operational Research , vol.158 , pp. 470-487
    • Chang, Y.C.1    Lee, C.Y.2
  • 3
    • 27944490931 scopus 로고    scopus 로고
    • 'Integrating production and transportation scheduling in a make-to-order environment'
    • PhD thesis, University of Cornell
    • Chen, P. (2000) 'Integrating production and transportation scheduling in a make-to-order environment', PhD thesis, University of Cornell.
    • (2000)
    • Chen, P.1
  • 4
    • 0030216821 scopus 로고    scopus 로고
    • 'Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs'
    • Chen, Z.-L. (1996) 'Scheduling and common due date assignment with earliness-tardiness penalties and batch delivery costs', European Journal of Operational Research, Vol. 93, pp.49-60,
    • (1996) European Journal of Operational Research , vol.93 , pp. 49-60
    • Chen, Z.-L.1
  • 7
    • 0029262526 scopus 로고
    • 'Facility-wide planning and scheduling of printed wiring board assembly'
    • Feo, T.A., Bard, J.F. and Holland, S.D. (1995) 'Facility-wide planning and scheduling of printed wiring board assembly', Operations Research, Vol. 43, pp.219-230.
    • (1995) Operations Research , vol.43 , pp. 219-230
    • Feo, T.A.1    Bard, J.F.2    Holland, S.D.3
  • 8
    • 0033339421 scopus 로고    scopus 로고
    • 'Synchronized development of production, inventory and distribution schedules'
    • Fumero, F. and Vercellis, C. (1999) 'Synchronized development of production, inventory and distribution schedules', Transportation Science, Vol. 33, pp.330-340.
    • (1999) Transportation Science , vol.33 , pp. 330-340
    • Fumero, F.1    Vercellis, C.2
  • 9
    • 0003162664 scopus 로고
    • 'Jackson's rule for single-machine scheduling: Making a good heuristic better'
    • Hall, L.A. and Shmoys, B. (1992) 'Jackson's rule for single-machine scheduling: making a good heuristic better', Mathematics of Operations Research, Vol. 17, pp.22-35.
    • (1992) Mathematics of Operations Research , vol.17 , pp. 22-35
    • Hall, L.A.1    Shmoys, B.2
  • 10
    • 0027906623 scopus 로고
    • 'On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date'
    • Herrmann, J.W. and Lee, C.Y. (1993) 'On scheduling to minimize earliness-tardiness and batch delivery costs with a common due date', European Journal of Operational Research, Vol. 70, pp.272-288.
    • (1993) European Journal of Operational Research , vol.70 , pp. 272-288
    • Herrmann, J.W.1    Lee, C.Y.2
  • 11
    • 0003075019 scopus 로고
    • 'Optimal two and three stage production schedules with setup times included'
    • Johnson, S.M. (1954) 'Optimal two and three stage production schedules with setup times included', Naval Research Logistics Quarterly, Vol. 1, pp.61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 12
    • 0344427189 scopus 로고    scopus 로고
    • 'Machine scheduling with transportation considerations'
    • Lee, C.-Y. and Chen, Z.-L. (2001) 'Machine scheduling with transportation considerations', Journal of Scheduling, Vol. 4, pp.3-24.
    • (2001) Journal of Scheduling , vol.4 , pp. 3-24
    • Lee, C.-Y.1    Chen, Z.-L.2
  • 13
    • 0033749166 scopus 로고    scopus 로고
    • 'A production rescheduling expert simulation system'
    • Li, H., Li, Z., Li, L.X, and Hu, B. (2000) 'A production rescheduling expert simulation system', European Journal of Operational Research, Vol. 124, No. 2, pp.283-193,
    • (2000) European Journal of Operational Research , vol.124 , Issue.2 , pp. 193-283
    • Li, H.1    Li, Z.2    Li, L.X.3    Hu, B.4
  • 16
    • 0041763613 scopus 로고
    • 'On 2xn sequencing problem with transportation times of jobs'
    • Maggu, P.L. and Das, G. (1980) 'On 2xn sequencing problem with transportation times of jobs', Pure and Applied Mathematika Science, Vol. 12, pp. 1-6.
    • (1980) Pure and Applied Mathematika Science , vol.12 , pp. 1-6
    • Maggu, P.L.1    Das, G.2
  • 17
    • 0033292674 scopus 로고    scopus 로고
    • 'On solving single machine optimization problems in electronics assembly'
    • Magyar, G., Johnsson, M. and Nevalainen, O. (1999) 'On solving single machine optimization problems in electronics assembly', Journal of Electronics Manufacturing, Vol. 9, No. 4, pp.249-267.
    • (1999) Journal of Electronics Manufacturing , vol.9 , Issue.4 , pp. 249-267
    • Magyar, G.1    Johnsson, M.2    Nevalainen, O.3
  • 18
    • 0036681717 scopus 로고    scopus 로고
    • 'Expert systems in production planning and scheduling: A state-of-the-art survey'
    • Metaxiotis, K.S., Askounis, D. and Psarras, J. (2002) 'Expert systems in production planning and scheduling: a state-of-the-art survey', Journal of Intelligent Manufacturing, Vol. 13, pp.253-260.
    • (2002) Journal of Intelligent Manufacturing , vol.13 , pp. 253-260
    • Metaxiotis, K.S.1    Askounis, D.2    Psarras, J.3
  • 19
    • 0020103079 scopus 로고
    • 'Common due-date assignment to minimize total penalty for the one machine scheduling problem'
    • Panwalkar, S.S, Smith, M.L. and Seidmann, A. (1982) 'Common due-date assignment to minimize total penalty for the one machine scheduling problem', Operations Research, Vol. 30, pp.391-399.
    • (1982) Operations Research , vol.30 , pp. 391-399
    • Panwalkar, S.S.1    Smith, M.L.2    Seidmann, A.3
  • 20
    • 0001662666 scopus 로고
    • 'Analysis of a heuristic for one machine sequencing with release dates and delivery times'
    • Potts, C.N. (1980) 'Analysis of a heuristic for one machine sequencing with release dates and delivery times', Operations Research, Vol. 28, pp. 1436-1441.
    • (1980) Operations Research , vol.28 , pp. 1436-1441
    • Potts, C.N.1
  • 22
    • 0033344267 scopus 로고    scopus 로고
    • 'A review of integrated analysis of production-distribution systems'
    • Sarmiento, A.M. and Nagi, R. (1999) 'A review of integrated analysis of production-distribution systems', IIE transactions, Vol. 31, pp. 1061-1074.
    • (1999) IIE Transactions , vol.31 , pp. 1061-1074
    • Sarmiento, A.M.1    Nagi, R.2
  • 23
    • 38249014416 scopus 로고
    • 'A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system'
    • Tayanlthi, P., Manivannan, S. and Banks, J. (1992) 'A knowledge-based simulation architecture to analyze interruptions in a flexible manufacturing system', Journal of Manufacturing systems, Vol. 11, No. 3, pp.195-214.
    • (1992) Journal of Manufacturing Systems , vol.11 , Issue.3 , pp. 195-214
    • Tayanlthi, P.1    Manivannan, S.2    Banks, J.3
  • 24
    • 0037310041 scopus 로고    scopus 로고
    • 'An evaluation of freight consolidation policies in global third party logistics'
    • Tyan, J.C., Wang, F.K. and Du, T.C. (2003) 'An evaluation of freight consolidation policies in global third party logistics', Omega, Vol. 31, pp.55-62.
    • (2003) Omega , vol.31 , pp. 55-62
    • Tyan, J.C.1    Wang, F.K.2    Du, T.C.3
  • 25
  • 26
    • 21844520793 scopus 로고
    • 'Heuristics for parallel machine scheduling with delivery times'
    • Woeginger, G.J. (1994) 'Heuristics for parallel machine scheduling with delivery times', Acta Informatica, Vol. 31, pp.503-512.
    • (1994) Acta Informatica , vol.31 , pp. 503-512
    • Woeginger, G.J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.