-
1
-
-
0031219811
-
Disassembly of multiple product structures
-
KN Taleb SM Gupta 1997 Disassembly of multiple product structures Comput Ind Eng 32 949 961
-
(1997)
Comput Ind Eng
, vol.32
, pp. 949-961
-
-
Taleb, K.N.1
Gupta, S.M.2
-
3
-
-
0035429278
-
Disassembly scheduling with parts commonality using Petri nets with timestamp
-
KP Neuendorf D-H Lee D Kiritsis P Xirouchakis 2001 Disassembly scheduling with parts commonality using Petri nets with timestamp Fund Inform 47 295 306
-
(2001)
Fund Inform
, vol.47
, pp. 295-306
-
-
Neuendorf, K.P.1
Lee, D.-H.2
Kiritsis, D.3
Xirouchakis, P.4
-
5
-
-
0031233911
-
Optimal disassembly of complex products
-
9
-
AJD Lambert 1995 Optimal disassembly of complex products Int J Prod Res 35 9 2509 2523
-
(1995)
Int J Prod Res
, vol.35
, pp. 2509-2523
-
-
Lambert, A.J.D.1
-
6
-
-
0031123978
-
Evaluating the end-of-life value of a product and improving it by redesign
-
4
-
Y Pnueli E Zussman 1997 Evaluating the end-of-life value of a product and improving it by redesign Int J Prod Res 35 4 921 942
-
(1997)
Int J Prod Res
, vol.35
, pp. 921-942
-
-
Pnueli, Y.1
Zussman, E.2
-
7
-
-
0032183016
-
A Petri net approach to disassembly process planning
-
KE Moore A Gungor SM Gupta 1998 A Petri net approach to disassembly process planning Comput Ind Eng 35 165 168
-
(1998)
Comput Ind Eng
, vol.35
, pp. 165-168
-
-
Moore, K.E.1
Gungor, A.2
Gupta, S.M.3
-
8
-
-
59249087552
-
Context of end-of-life disassembly
-
edited by CRC Press
-
Lambert AJD, Gupta SM (2005) Context of end-of-life disassembly. In: Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling, edited by CRC Press, 23
-
(2005)
Disassembly Modeling for Assembly, Maintenance, Reuse, and Recycling
, pp. 23
-
-
Lambert, A.J.D.1
Gupta, S.M.2
-
9
-
-
0031119840
-
Disassembly of complex product structures with parts and materials commonality
-
3
-
KN Taleb SM Gupta L Brennan 1997 Disassembly of complex product structures with parts and materials commonality Prod Plan Control 8 3 225 269
-
(1997)
Prod Plan Control
, vol.8
, pp. 225-269
-
-
Taleb, K.N.1
Gupta, S.M.2
Brennan, L.3
-
10
-
-
0026373709
-
MRP with uncertainty: A review and some extensions
-
DNP Murthy L Ma 1991 MRP with uncertainty: A review and some extensions Int J Prod Econ 25 51 64
-
(1991)
Int J Prod Econ
, vol.25
, pp. 51-64
-
-
Murthy, D.N.P.1
Ma, L.2
-
11
-
-
33747286457
-
Disassembly planning and scheduling: Review and further research
-
5
-
D-H Lee J-G Kang P Xirouchakis 2001 Disassembly planning and scheduling: review and further research J Eng Manuf 215 5 695 710
-
(2001)
J Eng Manuf
, vol.215
, pp. 695-710
-
-
Lee, D.-H.1
Kang, J.-G.2
Xirouchakis, P.3
-
13
-
-
8344257395
-
Disassembly scheduling: An integer programming approach
-
10
-
D-H Lee H-J Kim P Xirouchakis 2004 Disassembly scheduling: An integer programming approach J Eng Manuf 218 10 1357 1372
-
(2004)
J Eng Manuf
, vol.218
, pp. 1357-1372
-
-
Lee, D.-H.1
Kim, H.-J.2
Xirouchakis, P.3
-
14
-
-
2342594041
-
A two-stage heuristic for disassembly scheduling with assembly product structure
-
D-H Lee P Xirouchakis 2004 A two-stage heuristic for disassembly scheduling with assembly product structure J Oper Res Soc 55 287 297
-
(2004)
J Oper Res Soc
, vol.55
, pp. 287-297
-
-
Lee, D.-H.1
Xirouchakis, P.2
-
15
-
-
0031997813
-
Fuzzy set theory applications in production management research: A literature survey
-
1
-
AL Guiffrida R Nagi 1998 Fuzzy set theory applications in production management research: A literature survey J Intell Manuf 9 1 39 56
-
(1998)
J Intell Manuf
, vol.9
, pp. 39-56
-
-
Guiffrida, A.L.1
Nagi, R.2
-
16
-
-
0022525766
-
Fuzzy concepts in production management research: A review
-
1
-
W Karwowski GW Evans 1986 Fuzzy concepts in production management research: a review Int J Prod Res 24 1 129 147
-
(1986)
Int J Prod Res
, vol.24
, pp. 129-147
-
-
Karwowski, W.1
Evans, G.W.2
-
17
-
-
0002355705
-
Effective supply chain management
-
4
-
T Davis 1993 Effective supply chain management Sloan Manage Rev 34 4 35 46
-
(1993)
Sloan Manage Rev
, vol.34
, pp. 35-46
-
-
Davis, T.1
-
20
-
-
84989457223
-
Cost increases due to demand uncertainty in MRP lot sizing
-
MA De Bodt LN van Wassenhove 1983 Cost increases due to demand uncertainty in MRP lot sizing Decis Sci 14 345 362
-
(1983)
Decis Sci
, vol.14
, pp. 345-362
-
-
De Bodt, M.A.1
Van Wassenhove, L.N.2
-
21
-
-
0022098208
-
A theory of material requeriment planning (MRP): An empirical methodology to reduce uncertainty in MRP systems
-
JG Wacker 1985 A theory of material requeriment planning (MRP): An empirical methodology to reduce uncertainty in MRP systems Int J Prod Res 23 807 824
-
(1985)
Int J Prod Res
, vol.23
, pp. 807-824
-
-
Wacker, J.G.1
-
23
-
-
0003146053
-
A comparative study of three lot-sizing methods for the case of fuzzy demand
-
YY Lee BA Kramer CL Hwang 1991 A comparative study of three lot-sizing methods for the case of fuzzy demand Int J Oper Prod Manage 11 72 80
-
(1991)
Int J Oper Prod Manage
, vol.11
, pp. 72-80
-
-
Lee, Y.Y.1
Kramer, B.A.2
Hwang, C.L.3
-
26
-
-
0028192694
-
The usefulness of possibilistic programming in production planning problems
-
M Inuiguchi M Sakawa Y Kume 1994 The usefulness of possibilistic programming in production planning problems Int J Prod Econ 33 45 52
-
(1994)
Int J Prod Econ
, vol.33
, pp. 45-52
-
-
Inuiguchi, M.1
Sakawa, M.2
Kume, Y.3
-
27
-
-
33645854036
-
The use of possibilistic decision theory in manufacturing planning and control
-
R. Slowinski and M. Hapke (eds.) Springer-Verlag, Berlin
-
Fargier H, Thierry C (2000) The use of possibilistic decision theory in manufacturing planning and control. In: R. Slowinski and M. Hapke (eds.) Fuzzy Master Production Scheduling in Scheduling under Fuzziness. Springer-Verlag, Berlin, pp 45-59
-
(2000)
Fuzzy Master Production Scheduling in Scheduling under Fuzziness
, pp. 45-59
-
-
Fargier, H.1
Thierry, C.2
-
28
-
-
33846833792
-
Material requirement planning with fuzzy constraints and fuzzy coefficients
-
J Mula R Poler JP García-Sabater 2007 Material requirement planning with fuzzy constraints and fuzzy coefficients Fuzzy Sets Syst 158 783 793
-
(2007)
Fuzzy Sets Syst
, vol.158
, pp. 783-793
-
-
Mula, J.1
Poler, R.2
García-Sabater, J.P.3
-
29
-
-
0024702296
-
Evaluating the impact of operating environments on MRP system nervousness
-
7
-
C-Y Ho 1989 Evaluating the impact of operating environments on MRP system nervousness Int J Prod Res 27 7 1115 1135
-
(1989)
Int J Prod Res
, vol.27
, pp. 1115-1135
-
-
Ho, C.-Y.1
-
30
-
-
0032183973
-
Management of imprecision and uncertainty for production activity control
-
B Grabot L Geneste 1998 Management of imprecision and uncertainty for production activity control J Intell Manuf 9 431 446
-
(1998)
J Intell Manuf
, vol.9
, pp. 431-446
-
-
Grabot, B.1
Geneste, L.2
-
31
-
-
0037410424
-
Scheduling uncertain orders in the customer-subcontractor context
-
2
-
L Geneste B Grabot A Letouzey 2003 Scheduling uncertain orders in the customer-subcontractor context Eur J Oper Res 147 2 297 311
-
(2003)
Eur J Oper Res
, vol.147
, pp. 297-311
-
-
Geneste, L.1
Grabot, B.2
Letouzey, A.3
-
33
-
-
0042807253
-
Managing demand uncertainty in supply chain planning
-
A Gupta CD Maranas 2003 Managing demand uncertainty in supply chain planning Comput Chem Eng 27 1219 1227
-
(2003)
Comput Chem Eng
, vol.27
, pp. 1219-1227
-
-
Gupta, A.1
Maranas, C.D.2
-
35
-
-
27344448554
-
MRP with flexible constraints: A fuzzy mathematical programming approach
-
J Mula R Poler JP Garcia 2006 MRP with flexible constraints: A fuzzy mathematical programming approach Fuzzy Set System 157 74 97
-
(2006)
Fuzzy Set System
, vol.157
, pp. 74-97
-
-
Mula, J.1
Poler, R.2
Garcia, J.P.3
|