-
2
-
-
0035426460
-
Optimal material control in an assembly system with component commonality
-
Agrawal N., and Cohen M.A. Optimal material control in an assembly system with component commonality. Naval Research Logistics 48 5 (2001) 409-429
-
(2001)
Naval Research Logistics
, vol.48
, Issue.5
, pp. 409-429
-
-
Agrawal, N.1
Cohen, M.A.2
-
3
-
-
0025261521
-
Simple solution procedures for a class of two-echelon inventory problems
-
Axsäter S. Simple solution procedures for a class of two-echelon inventory problems. Operations Research 38 1 (1990) 64-69
-
(1990)
Operations Research
, vol.38
, Issue.1
, pp. 64-69
-
-
Axsäter, S.1
-
4
-
-
0023343841
-
Determining lot sizes and resource requirements - A review
-
Bahl H.C., Ritzman L.P., and Gupta J.N.D. Determining lot sizes and resource requirements - A review. Operations Research 35 3 (1987) 329-345
-
(1987)
Operations Research
, vol.35
, Issue.3
, pp. 329-345
-
-
Bahl, H.C.1
Ritzman, L.P.2
Gupta, J.N.D.3
-
5
-
-
0020832935
-
Mathematical-programming approaches to capacity-constrained MRP systems - Review, formulation and problem reduction
-
Billington P.J., McClain J.O., and Thomas L.J. Mathematical-programming approaches to capacity-constrained MRP systems - Review, formulation and problem reduction. Management Science 29 10 (1983) 1126-1141
-
(1983)
Management Science
, vol.29
, Issue.10
, pp. 1126-1141
-
-
Billington, P.J.1
McClain, J.O.2
Thomas, L.J.3
-
6
-
-
0020194024
-
Computational-complexity of the capacitated lot size problem
-
Bitran G.R., and Yanasse H.H. Computational-complexity of the capacitated lot size problem. Management Science 28 10 (1982) 1174-1186
-
(1982)
Management Science
, vol.28
, Issue.10
, pp. 1174-1186
-
-
Bitran, G.R.1
Yanasse, H.H.2
-
7
-
-
11844299024
-
Managing inventory and supply performance in assembly systems with random supply capacity and demand
-
Bollapragada R., Rao U.S., and Zhang J. Managing inventory and supply performance in assembly systems with random supply capacity and demand. Management Science 50 12 (2004) 1729-1743
-
(2004)
Management Science
, vol.50
, Issue.12
, pp. 1729-1743
-
-
Bollapragada, R.1
Rao, U.S.2
Zhang, J.3
-
8
-
-
0035521464
-
Near optimal pricing and replenishment strategies for a retailer/distribution system
-
Chen F., Federgruen A., and Zheng Y.-S. Near optimal pricing and replenishment strategies for a retailer/distribution system. Operations Research 49 6 (2001) 839-853
-
(2001)
Operations Research
, vol.49
, Issue.6
, pp. 839-853
-
-
Chen, F.1
Federgruen, A.2
Zheng, Y.-S.3
-
9
-
-
0031078433
-
Computational study of the multi-echelon production planning problem
-
Chopra S., Rao M.R., and Tsai C.Y. Computational study of the multi-echelon production planning problem. Naval Research Logistics 44 1 (1997) 1-19
-
(1997)
Naval Research Logistics
, vol.44
, Issue.1
, pp. 1-19
-
-
Chopra, S.1
Rao, M.R.2
Tsai, C.Y.3
-
10
-
-
27144436838
-
Joint optimization of process improvement investments for supplier-buyer cooperative commerce
-
Comeaux E.J., and Sarker B.R. Joint optimization of process improvement investments for supplier-buyer cooperative commerce. Journal of the Operational Research Society 56 11 (2005) 1310-1324
-
(2005)
Journal of the Operational Research Society
, vol.56
, Issue.11
, pp. 1310-1324
-
-
Comeaux, E.J.1
Sarker, B.R.2
-
11
-
-
33645219338
-
Optimal inventory policy for specialty chemical products in multiple packages
-
Comeaux E.J., and Sarker B.R. Optimal inventory policy for specialty chemical products in multiple packages. Journal of the Operational Research Society 57 2 (2006) 357-366
-
(2006)
Journal of the Operational Research Society
, vol.57
, Issue.2
, pp. 357-366
-
-
Comeaux, E.J.1
Sarker, B.R.2
-
12
-
-
0004116989
-
-
McGraw-Hill, Inc., New York, NY
-
Cormen T.H., Leiserson C.E., and Rivest R.L. Introduction to Algorithms (1997), McGraw-Hill, Inc., New York, NY
-
(1997)
Introduction to Algorithms
-
-
Cormen, T.H.1
Leiserson, C.E.2
Rivest, R.L.3
-
13
-
-
2942670639
-
Integrating resource and production decision in a simple multi-stage assembly system
-
Dellaert N., and de Kok T. Integrating resource and production decision in a simple multi-stage assembly system. International Journal of Production Economics 90 3 (2004) 281-294
-
(2004)
International Journal of Production Economics
, vol.90
, Issue.3
, pp. 281-294
-
-
Dellaert, N.1
de Kok, T.2
-
14
-
-
0037150267
-
Determining manufacturing batch sizes for a lumpy delivery system with trend demand
-
Diponegoro A., and Sarker B.R. Determining manufacturing batch sizes for a lumpy delivery system with trend demand. International Journal of Production Economics 77 2 (2002) 131-143
-
(2002)
International Journal of Production Economics
, vol.77
, Issue.2
, pp. 131-143
-
-
Diponegoro, A.1
Sarker, B.R.2
-
15
-
-
29144436069
-
Finite horizon planning with permitted shortage and fixed interval of deliveries
-
Diponegoro A., and Sarker B.R. Finite horizon planning with permitted shortage and fixed interval of deliveries. Computers and Operations Research 33 8 (2006) 2387-2404
-
(2006)
Computers and Operations Research
, vol.33
, Issue.8
, pp. 2387-2404
-
-
Diponegoro, A.1
Sarker, B.R.2
-
16
-
-
34249882746
-
Operations policy for a supply chain system with fixed-interval delivery and linear demand
-
Diponegoro A., and Sarker B.R. Operations policy for a supply chain system with fixed-interval delivery and linear demand. Journal of the Operational Research Society 58 7 (2007) 901-910
-
(2007)
Journal of the Operational Research Society
, vol.58
, Issue.7
, pp. 901-910
-
-
Diponegoro, A.1
Sarker, B.R.2
-
17
-
-
0017931081
-
The economic lot scheduling problem (ELSP): Review and extensions
-
Elmaghraby S.E. The economic lot scheduling problem (ELSP): Review and extensions. Management Science 24 6 (1978) 587
-
(1978)
Management Science
, vol.24
, Issue.6
, pp. 587
-
-
Elmaghraby, S.E.1
-
18
-
-
0025213699
-
A fully polynomial-approximation scheme for single-product scheduling in a finite-capacity facility
-
Gavish B., and Johnson R.E. A fully polynomial-approximation scheme for single-product scheduling in a finite-capacity facility. Operations Research 38 1 (1990) 70-83
-
(1990)
Operations Research
, vol.38
, Issue.1
, pp. 70-83
-
-
Gavish, B.1
Johnson, R.E.2
-
19
-
-
0026869895
-
Economic manufacturing quantity in a just-in-time delivery system
-
Golhar D.Y., and Sarker B.R. Economic manufacturing quantity in a just-in-time delivery system. International Journal of Production Research 30 5 (1992) 961-972
-
(1992)
International Journal of Production Research
, vol.30
, Issue.5
, pp. 961-972
-
-
Golhar, D.Y.1
Sarker, B.R.2
-
20
-
-
0001539415
-
A one-vendor multi-buyer integrated inventory model: A comment
-
Goyal S.K. A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research 82 2 (1995) 209-210
-
(1995)
European Journal of Operational Research
, vol.82
, Issue.2
, pp. 209-210
-
-
Goyal, S.K.1
-
21
-
-
0024715832
-
Integrated inventory models: The buyer-vendor coordination
-
Goyal S.K., and Gupta Y.P. Integrated inventory models: The buyer-vendor coordination. European Journal of Operational Research 41 2 (1989) 38-42
-
(1989)
European Journal of Operational Research
, vol.41
, Issue.2
, pp. 38-42
-
-
Goyal, S.K.1
Gupta, Y.P.2
-
22
-
-
0029775454
-
Lot sizing in serial assembly systems with multiple constrained resources
-
Harrison T.P., and Lewis H.S. Lot sizing in serial assembly systems with multiple constrained resources. Management Science 42 1 (1996) 119-136
-
(1996)
Management Science
, vol.42
, Issue.1
, pp. 119-136
-
-
Harrison, T.P.1
Lewis, H.S.2
-
23
-
-
84974870175
-
On an optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy
-
Hill R.M. On an optimal batch size for a production system operating under a fixed-quantity, periodic delivery policy. Journal of the Operational Research Society 46 2 (1995) 271-273
-
(1995)
Journal of the Operational Research Society
, vol.46
, Issue.2
, pp. 271-273
-
-
Hill, R.M.1
-
24
-
-
0030190937
-
Optimizing a production system with a fixed delivery schedule
-
Hill R.M. Optimizing a production system with a fixed delivery schedule. Journal of the Operational Research Society 47 7 (1996) 954-960
-
(1996)
Journal of the Operational Research Society
, vol.47
, Issue.7
, pp. 954-960
-
-
Hill, R.M.1
-
25
-
-
0031186347
-
Planning and scheduling of parallel semicontinuous processes-2. Short-term scheduling
-
Karimi I.A., and McDonald C.M. Planning and scheduling of parallel semicontinuous processes-2. Short-term scheduling. Industrial Engineering and Chemical Research 36 (1997) 2701-2714
-
(1997)
Industrial Engineering and Chemical Research
, vol.36
, pp. 2701-2714
-
-
Karimi, I.A.1
McDonald, C.M.2
-
26
-
-
0032093820
-
Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources
-
Katok E., Lewis H.S., and Harrison T.P. Lot sizing in general assembly systems with setup costs, setup times, and multiple constrained resources. Management Science 44 6 (1998) 859-877
-
(1998)
Management Science
, vol.44
, Issue.6
, pp. 859-877
-
-
Katok, E.1
Lewis, H.S.2
Harrison, T.P.3
-
27
-
-
0029632685
-
A one-vendor multi-buyer integrated inventory model
-
Lu L. A one-vendor multi-buyer integrated inventory model. European Journal of Operational Research 81 3 (1995) 312-323
-
(1995)
European Journal of Operational Research
, vol.81
, Issue.3
, pp. 312-323
-
-
Lu, L.1
-
28
-
-
25844475281
-
Synthesis of Kanban control policies for multi-stage just-in-time assembly systems
-
Mark K.L., and Ng W.C. Synthesis of Kanban control policies for multi-stage just-in-time assembly systems. Engineering Optimization 31 2 (1998) 191-224
-
(1998)
Engineering Optimization
, vol.31
, Issue.2
, pp. 191-224
-
-
Mark, K.L.1
Ng, W.C.2
-
29
-
-
0031188902
-
Planning and scheduling of parallel semicontinuous processes-1. Production Planning
-
McDonald C.M., and Karimi I.A. Planning and scheduling of parallel semicontinuous processes-1. Production Planning. Industrial Engineering and Chemical Research 36 (1997) 2691-2700
-
(1997)
Industrial Engineering and Chemical Research
, vol.36
, pp. 2691-2700
-
-
McDonald, C.M.1
Karimi, I.A.2
-
30
-
-
0010352971
-
Two-interval inventory-allocation policies in a one-warehouse N-identical-retailer distribution system
-
McGavin E.J., Schwarz L.B., and Ward J.E. Two-interval inventory-allocation policies in a one-warehouse N-identical-retailer distribution system. Management Science 39 9 (1993) 1092-1107
-
(1993)
Management Science
, vol.39
, Issue.9
, pp. 1092-1107
-
-
McGavin, E.J.1
Schwarz, L.B.2
Ward, J.E.3
-
31
-
-
0024132057
-
The buyer-supplier relationship under just in time
-
Newman R.G. The buyer-supplier relationship under just in time. Production and Inventory Management 29 3 (1998) 45-50
-
(1998)
Production and Inventory Management
, vol.29
, Issue.3
, pp. 45-50
-
-
Newman, R.G.1
-
32
-
-
34249311990
-
An optimal batch sizing for imperfect production systems with quality assurance and rework
-
Ojha D., Sarker B.R., and Biswas P. An optimal batch sizing for imperfect production systems with quality assurance and rework. International Journal of Production Research 45 14 (2007) 3191-3214
-
(2007)
International Journal of Production Research
, vol.45
, Issue.14
, pp. 3191-3214
-
-
Ojha, D.1
Sarker, B.R.2
Biswas, P.3
-
33
-
-
0024860013
-
An inventory model under just-in-time purchasing agreements
-
Pan A.C., and Liao C.J. An inventory model under just-in-time purchasing agreements. Production and Inventory Management 30 1 (1989) 49-52
-
(1989)
Production and Inventory Management
, vol.30
, Issue.1
, pp. 49-52
-
-
Pan, A.C.1
Liao, C.J.2
-
34
-
-
0033317962
-
Operations planning in a supply-chain system with fixed-interval deliveries of finished goods to multiple customers
-
Parija G.R., and Sarker B.R. Operations planning in a supply-chain system with fixed-interval deliveries of finished goods to multiple customers. IIE Transactions 31 10 (1999) 1075-1082
-
(1999)
IIE Transactions
, vol.31
, Issue.10
, pp. 1075-1082
-
-
Parija, G.R.1
Sarker, B.R.2
-
35
-
-
0033075592
-
A heuristic algorithm for a production planning problem in an assembly system
-
Park M.W., and Kim Y.D. A heuristic algorithm for a production planning problem in an assembly system. Journal of the Operational Research Society 50 2 (1999) 138-147
-
(1999)
Journal of the Operational Research Society
, vol.50
, Issue.2
, pp. 138-147
-
-
Park, M.W.1
Kim, Y.D.2
-
36
-
-
0021581827
-
A stepwise partial enumeration algorithm for the economic lot scheduling problem
-
Park K.S., and Yun D.K. A stepwise partial enumeration algorithm for the economic lot scheduling problem. IIE Transactions 16 4 (1984) 363-370
-
(1984)
IIE Transactions
, vol.16
, Issue.4
, pp. 363-370
-
-
Park, K.S.1
Yun, D.K.2
-
37
-
-
0004068418
-
-
Prentice-Hall, Inc., Englewood Cliffs, NJ
-
Phillips D.T., and Garcia-Diaz A. Fundamentals of Network Analysis. first ed. (1981), Prentice-Hall, Inc., Englewood Cliffs, NJ
-
(1981)
Fundamentals of Network Analysis. first ed.
-
-
Phillips, D.T.1
Garcia-Diaz, A.2
-
38
-
-
33947165157
-
Supply chain models for an assembly systems with preprocessing of raw materials
-
Rahman M.A.A., and Sarker B.R. Supply chain models for an assembly systems with preprocessing of raw materials. European Journal of Operational Research 181 2 (2007) 733-752
-
(2007)
European Journal of Operational Research
, vol.181
, Issue.2
, pp. 733-752
-
-
Rahman, M.A.A.1
Sarker, B.R.2
-
39
-
-
0025261570
-
Recasting the traditional inventory model to implement just-in-time purchasing
-
Ramasesh R.V. Recasting the traditional inventory model to implement just-in-time purchasing. Production and Inventory Management 31 1 (1990) 71-75
-
(1990)
Production and Inventory Management
, vol.31
, Issue.1
, pp. 71-75
-
-
Ramasesh, R.V.1
-
40
-
-
0040362012
-
Efficient, effective lot sizing for multistage production systems
-
Roundy R. Efficient, effective lot sizing for multistage production systems. Operations Research 41 2 (1993) 371-385
-
(1993)
Operations Research
, vol.41
, Issue.2
, pp. 371-385
-
-
Roundy, R.1
-
41
-
-
55149107302
-
Finite horizon planning with fixed interval of deliveries and no shortage
-
Sarker B.R., and Diponegoro A. Finite horizon planning with fixed interval of deliveries and no shortage. Opsearch 43 4 (2006) 404-424
-
(2006)
Opsearch
, vol.43
, Issue.4
, pp. 404-424
-
-
Sarker, B.R.1
Diponegoro, A.2
-
42
-
-
84974873088
-
An optimal batch size for a production system operating under fixed-quantity, periodic delivery policy
-
Sarker B.R., and Parija G.R. An optimal batch size for a production system operating under fixed-quantity, periodic delivery policy. Journal of the Operational Research Society 45 8 (1994) 891-900
-
(1994)
Journal of the Operational Research Society
, vol.45
, Issue.8
, pp. 891-900
-
-
Sarker, B.R.1
Parija, G.R.2
-
43
-
-
0030108302
-
Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy-demand delivery system
-
Sarker B.R., and Parija G.R. Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy-demand delivery system. European Journal of Operational Research 89 3 (1996) 593-608
-
(1996)
European Journal of Operational Research
, vol.89
, Issue.3
, pp. 593-608
-
-
Sarker, B.R.1
Parija, G.R.2
-
44
-
-
34548565651
-
Optimal batch sizing in a multi-stage production systems with rework consideration
-
Sarker B.R., Jamal A.M.M., and Mondal S. Optimal batch sizing in a multi-stage production systems with rework consideration. European Journal of Operational Research 184 3 (2008) 915-929
-
(2008)
European Journal of Operational Research
, vol.184
, Issue.3
, pp. 915-929
-
-
Sarker, B.R.1
Jamal, A.M.M.2
Mondal, S.3
-
45
-
-
0022045727
-
Fill-rate optimization in a one-warehouse N-identical retailer distribution system
-
Schwarz L.B., Deuermeyer B.L., and Badinelli R.D. Fill-rate optimization in a one-warehouse N-identical retailer distribution system. Management Science 31 4 (1985) 488-498
-
(1985)
Management Science
, vol.31
, Issue.4
, pp. 488-498
-
-
Schwarz, L.B.1
Deuermeyer, B.L.2
Badinelli, R.D.3
-
46
-
-
32544454181
-
Optimal models for a multi-stage supply chain system controlled by Kanbans under just-in-time philosophy
-
Wang S., and Sarker B.R. Optimal models for a multi-stage supply chain system controlled by Kanbans under just-in-time philosophy. European Journal of Operational Research 172 1 (2006) 179-200
-
(2006)
European Journal of Operational Research
, vol.172
, Issue.1
, pp. 179-200
-
-
Wang, S.1
Sarker, B.R.2
|